Schulte Road Warehouse Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Schulte Road Warehouse Project, managed by the City of Tracy in San Joaquin County, involves the demolition of three single-family residences and six ancillary structures to facilitate the redevelopment of the area. The project scope includes the construction of a one-story, 217,466 square foot warehouse building and a surface parking lot. As part of the project, the entire site, including the Development Area and the Williams Communication Parcel, will be annexed into the City of Tracy. The facility is designed to support business operations 24 hours per day, although the specific tenants remain unknown. A critical operational constraint is that no cold storage facilities or uses are permitted on-site. The City of Tracy has determined that the project will have a significant environmental effect, leading to the preparation of an Environmental Impact Report under CEQA, which includes specific mitigation measures and a monitoring plan. The project is overseen by the City of Tracy's planning department, with key points of contact including Senior Planner Scott Claar and Victoria Lombardo.

General Info

Demolition of nine structures for 217,466 sq ft warehouse in Tracy, CA, approved Aug 2025, 24/7 operations, no cold storage, CEQA compliant.

Agency

California → City of Tracy

NAICS

236210 - Industrial Building ConstructionView NAICS

Place of Performance

Hansen Rd / Schulte Rd, Tracy, CA, 95376

Set-Aside

NONE

Documents

(1)

Notice of Determination for Schulte Road Warehouse Project

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Tracy
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Tracy
Office AddressN/A
Contacts

Full Description

Show more
The proposed project would include demolition of the three single-family residences and six ancillary structures and redevelopment of the Development Area with a one-story, 217,466 sf warehouse building and a surface parking lot. The entire project site, including the Development Area and the Williams Communication Parcel, would be annexed into the City as part of the proposed project. Although the tenants of the proposed warehouse are unknown at this time, this analysis assumes that business operations could occur 24 hours per day. No cold storage facilities or uses will be allowed on-site. See Ch 2 of RDEIR for more details regarding the landscaping, site access, circulation, and utility improvements.

Similar Contracts

Same NAICS industry code

NAICS: 236210
New
Federal
Leavenworth VA Decommissioning
Solicitation # 36C77026R0015
The Department of Veterans Affairs, NCO-15 CMOP division, is soliciting a construction contract for the decommissioning of the Leavenworth VA CMOP facility located at 5000 S 13th St, Leavenworth, KS. This project is a total set-aside for Service-Disabled Veteran Owned Small Businesses (SDVOSB) with an estimated construction magnitude between $500,000 and $1,000,000. The scope of work involves the disassembly, demolition, and disposal of Automated Prescription Fulfillment System (APFS) equipment, conveyors, and electrical systems, as well as general building repairs and the decommissioning of a central vacuum system. A key requirement includes providing 5,000 to 10,000 square feet of off-site storage near the Shawnee CMOP to facilitate federal equipment excessing procedures. The contract utilizes a Best Value Tradeoff source selection process, where non-price factors—including technical approach, construction experience, and staff qualifications—are significantly more important than price. The total performance period is 365 calendar days, though the government intends for the actual decommissioning to be completed within 60 days of the Notice to Proceed. Contractors must adhere to strict GSA guidelines for inventory and photography, as well as manufacturer standards for the packaging and palletization of electronic and robotic components to prevent damage. The response deadline is September 23, 2026, at 17:00 Central.
National Cmop Office (36C770)

POSTED

3 days ago

DEADLINE

in 2 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS