Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

2 Phase Warehouse Distribution Facility

Forecast
SPR24-00028State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

Hercules Street and Santa Fe Avenue East, Hesperia, CA, 92345

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Interested Companies (1)

Blodgett Baylosis Environmental PlanningHacienda Heights, CA

Full Description

Show more
The project proposes a two-phase warehouse facility located in the City of Hesperia. The proposed project site consists of approximately 8.67 acres. The project would be constructed within two phases. Phase 1 of the development would occur on the eastern half of the parcel while Phase 2 would occur on the western half. Phase 1 involves the renovation of a 5,000 square foot office and warehouse building and the development of a 30,000 square foot warehouse, a 14,550 cubic foot retention basin, a solar array, and a 50,526 square foot storage yard. Phase 2 would be developed with a 2,207 square foot office building, a 30,744 square foot warehouse, a solar array, and a 59,697 square foot storage yard. Landscaping would total 53,174 square feet, including 21,412 square feet in Phase 1 and 31,762 square feet in Phase 2. A total of 81 parking spaces would be provided, including 42 spaces in Phase 1 and 39 spaces in Phase 2.

Similar Contracts

Same NAICS industry code

NAICS: 236210
New
SLED
CP25008
Solicitation # CP25008
The Bulk Terminal No. 1 Junction House Rehabilitation project, identified as CP25008, is a heavy construction contract issued by the Lake Charles Harbor and Terminal District in Louisiana. The scope of work involves the installation of various new conveyor components, including discharge hoods, deflectors, spouts, transitions, loaders, skirtboards, belt cleaners, and supports. The project requires strict adherence to industry standards such as API, ASTM, IEEE, NEMA, NFPA 70, OSHA, and UL. Performance is managed through a Critical Path Progress Schedule with Level 3 detail and bi-weekly updates, with specific equipment lead times estimated between 6 and 10 weeks. The contract will be awarded to the lowest qualified bidder based on the summation of quantities and unit bid prices. Bidders must provide a non-collusion declaration, a corporate resolution of authority, and, for bids exceeding 100,000 dollars, a Byrd Anti-Lobbying Amendment Certification. The successful contractor must provide performance and payment bonds from an approved surety or a Louisiana-domiciled insurance company with at least an A- rating. Technical requirements include specific piping color coding, chloride-free adhesives for stainless steel and nickel alloys, and electrical system identification complying with ANSI and NFPA standards. Final acceptance is contingent upon the owner verifying that the system is functional and operational.
Port of Lake Charles

POSTED

about 19 hours ago

DEADLINE

in 2 days
View Details
NAICS: 236210
New
Federal
Tinker AFB 2026 Multiple Award Construction Contract (MACC)
Solicitation # FA8137-26-R-0040
The Tinker Air Force Base 2026 Multiple Award Construction Contract (MACC) is a competitive Indefinite Delivery Indefinite Quantity (IDIQ) solicitation (FA8137-26-R-0040) for general construction services. The contract has a total aggregate maximum value of 950 million dollars over a ten-year period, consisting of a five-year base period and one five-year option. The scope of work encompasses a broad range of sustainment, maintenance, repair, alteration, renovation, and minor construction projects for real property facilities at Tinker AFB, Oklahoma. Project execution is categorized into three methods: Design-Build, Construction with Limited Design, and Construction Only. The government is utilizing a Highest Technically Rated Offeror (HTRO) source selection process based on a Minimum Technical Threshold Rating (MTTR). Offerors are evaluated across four key sections: relevant construction experience, design experience, certifications/licenses, and staffing. To be eligible for award, offerors must meet specific point thresholds, with 8,190 points required for the Small Business pool and 7,140 points for the Full and Open pool. The solicitation is a partial small business set-aside under NAICS 236210. Key administrative requirements include mandatory registration in the System for Award Management (SAM.gov) and compliance with CMMC Level 1 cybersecurity standards. Performance and payment bonds are required at 100 percent of the original contract price. Proposals must be submitted electronically to the designated MACC Workflow Org Box by November 30, 2026. While the solicitation is active, funds are anticipated to become available in FY27, at which point task orders will be issued.
FA8137 Afsc Pzioc

POSTED

4 days ago

DEADLINE

in 13 days
View Details
NAICS: 236210
New
SLED
IFB 06-26 Biochar Facility Construction
Solicitation # IFB 06-26
The Southeastern Public Service Authority of Virginia (SPSA) is soliciting bids for the construction of a 40,872 square foot biochar processing plant located in Portsmouth, Virginia. The facility is designed to manage the organic portion of the SPSA SORT System. The successful contractor will be responsible for providing all labor, materials, and warranties to deliver a fully operational facility, which includes coordinating construction activities with SPSA and AMP regarding the installation and commissioning of specialized equipment. The contract will be awarded to the lowest responsive and responsible bidder, with evaluations based on technical compliance, the ability to meet quality standards, and the provision of descriptive literature and references for similar completed projects. Key requirements include the submission of performance and labor and material payment bonds totaling 50 percent of the contract amount and adherence to strict safety and accessibility standards, including the Americans With Disabilities Act. Bidders must provide one original and four copies of their bid, along with an electronic copy on a flash drive, by the deadline of November 20, 2026. The contractor is required to provide as-built drawings upon completion and must comply with various federal and state regulations, including drug-free workplace and non-discrimination provisions. All work must be performed in accordance with the CED Project Manual and associated drawings, with specific quality assurance testing for concrete and asphalt as outlined in the inspection criteria.
Southeastern Public Service Authority

POSTED

4 days ago

DEADLINE

in 3 days
View Details

More opportunities from California → City of Hesperia

Same awarding agency

NAICS: 541360
SLED
Hesperia Big Box Retail Project
Solicitation # 2024110259
The Hesperia Big Box Retail Project involves the development of approximately 25.4 to 29.54 acres of land in San Bernardino County, California, to construct a 167,664-square-foot wholesale retail center. The project scope includes 683 parking spaces with four solar canopies, a 14-pump fuel station with 28 fueling positions, a 2,623-square-foot automated carwash facility, and a 205-square-foot office building, along with necessary onsite and offsite road, utility, and stormwater improvements. The project is located just east of the intersection of Amargosa Road and Key Pointe Drive, south of the California Aqueduct and bordered by Interstate 15. The project has undergone extensive environmental review under the California Environmental Quality Act, led by the City of Hesperia. Key regulatory approvals include Incidental Take Permits from the California Department of Fish and Wildlife for impacts to western Joshua trees and western burrowing owl habitats. Environmental assessments have addressed air quality, greenhouse gas emissions, noise, and paleontological sensitivity, with a specific focus on managing stormwater through a Water Quality Management Plan for the Mojave River Watershed. While most environmental impacts are considered mitigable, the impact on transportation regarding vehicle miles traveled is noted as significant and unavoidable. Construction requirements include adherence to OSHA excavation standards, ADA accessibility for parking and flatwork, and specific soil compaction and import material testing standards.
Geophysical Surveying and Mapping Services

POSTED

3 months ago

DEADLINE

N/A
View Details
NAICS: 541620
SLED
Amargosa Road and Palmetto Way Industrial Warehouse Building
Solicitation # 2025090664
Rachamin 5, LLC proposes the construction of a 499,714-square-foot industrial warehouse and distribution center on approximately 30.52 acres in Hesperia, California. The facility will feature 489,714 square feet of warehouse space and 10,000 square feet of office space, supported by 72 loading docks, 256 tractor-trailer stalls, and 251 passenger vehicle parking spaces. The project site encompasses three parcels located south of Avenal Street, north of Palmetto Way, and west of Amargosa Road. Development includes stormwater facilities, sidewalks, and approximately 306,000 square feet of landscaping, with a required land use designation change to Commercial/Industrial Business Park under the Main Street and Freeway Corridor Specific Plan. The project is managed by the City of Hesperia Planning Department under solicitation number 2025090664. Environmental compliance is being conducted via the California Environmental Quality Act, involving an Initial Study, Mitigated Negative Declaration, and a comprehensive Environmental Impact Report. Key environmental analyses have addressed air quality, greenhouse gas emissions, noise, biological resources, and traffic impacts, with specific coordination with the Native American Heritage Commission regarding tribal cultural resources. The project has undergone a formal public review process and state clearinghouse submittals, with final environmental documentation completed in July 2026.
Environmental Consulting Services

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 237990
SLED
Dara Industrial Project (CUP22-00003)
Solicitation # EPIMS-SBR-57637-R6
The California Department of Fish and Wildlife has issued Streambed Alteration Agreement EPIMS-SBR-57637-R6 to SRD Design Studio under Section 1602 of the Fish and Game Code, authorizing activities associated with the Dara Industrial Project in Hesperia, California. The project entails the development of a 750,000-square-foot industrial facility alongside supporting infrastructure including an outdoor seating area, access road, two water retention basins, vehicle parking lots, storm drainage upgrades, and manufactured slopes to accommodate a pedestrian path. The agreement ensures compliance with environmental regulations concerning potential impacts to streambeds and aquatic habitats during construction and land modification. The project is being managed under the City of Hesperia’s zoning and planning authority, with key outreach and permitting coordination handled by senior personnel from both the city and state environmental agencies. Edgar Gonzalez, Senior Planner for the City of Hesperia, serves as the primary point of contact, while Lily Mu, Senior Environmental Scientist at the California Department of Fish and Wildlife, provides regulatory oversight. The project was forecasted in July 2026 through the CEQA Net portal, indicating its status in the environmental review and permitting process prior to full construction commencement, with all activities subject to conditions designed to mitigate ecological disruption and protect water resources.
Other Heavy and Civil Engineering Construction

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 541620
SLED
Hesperia Phelan CUP24-00012
Solicitation # CUP24-00012
The Hesperia Phelan CUP24-00012 project, led by the City of Hesperia and proposed by Au Energy, LLC, involves the construction and operation of a commercial facility on a 2.66-acre site at the northwest corner of U.S. Highway 395 and Phelan Road in Hesperia, California. The development consists of a 5,915-square-foot convenience store, five fuel islands with ten pumps under a 4,080-square-foot canopy, and a 1,968-square-foot automated car wash tunnel. The site plan includes 40 parking spaces, featuring 10 EV-capable spaces and two EV charging stations, with approximately 1.88 acres of paved surface and 0.78 acres of landscaped area. Additionally, the project includes improvements to U.S. Highway 395 and the traffic signal at the Phelan Road intersection. The project is subject to rigorous environmental and regulatory compliance under the California Environmental Quality Act. Key requirements include an Incidental Take Permit from the California Department of Fish and Wildlife for the removal of 35 western Joshua trees and mandatory pre-construction burrow surveys to protect burrowing owls. The project also mandates strict protocols for the discovery of archaeological finds, fossils, or human remains, requiring assessments by qualified professionals and coordination with the San Bernardino County coroner and the Yuhaaviatam of San Manuel Nation. Construction must also adhere to specific fire management procedures to mitigate wildfire risks. The project underwent a public review period from January 20 to February 18, 2026, and is supported by a Mitigated Negative Declaration and a Mitigation Monitoring and Reporting Plan.
Environmental Consulting Services

POSTED

10 months ago

DEADLINE

N/A
View Details
NAICS: 541620
SLED
Main Street Commercial Center
Solicitation # SPR23-00028 & ME25-00002
The Main Street Commercial Center project, identified by solicitation numbers SPR23-00028 and ME25-00002, involves the development of 1.54 acres of undeveloped land located at 14449 Main Street in Hesperia, San Bernardino County, California. The scope of work includes the construction of a 20,500 square foot u-shaped commercial building featuring nine tenant spaces, 83 parking spaces, a perimeter brick wall, landscaping, and associated utilities. The project is situated within the Neighborhood Commercial zone of the Main Street and Freeway Corridor Specific Plan and was approved by the City of Hesperia on August 13, 2025. Environmental compliance is a critical component of the project, with a Negative Declaration prepared under the California Environmental Quality Act. Additionally, the California Department of Fish and Wildlife issued Incidental Take Permit No. 1927-ITP-2025-070-06 to CCPT Investment Group LLC to authorize the incidental take of two western Joshua trees, which are protected under the Western Joshua Tree Conservation Act and the California Endangered Species Act. This permit requires adherence to specific mitigation measures and a monitoring plan adopted by the Department of Fish and Wildlife. Key project contacts include Senior Planner Edgar Gonzalez for the City of Hesperia and Environmental Scientist Emily Leon for the California Department of Fish and Wildlife.
Environmental Consulting Services

POSTED

10 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS