Shady Pines MHP - Improvements to Water Syatem

Active
73991State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Vermont State Housing Trust is soliciting sealed bids for water system improvements at the Shady Pines Mobile Home Park in Westminster, Vermont. The primary scope of work involves replacing a 40-year-old 6,000 gallon steel pressure storage tank with two 4,000 gallon buried fiberglass tanks and installing a new 95 GPM dual-alternating self-priming booster pump system. Additional core requirements include a 45 ft extension of the 1.5 inch PVC well supply line with two buried shut-off valves and 30 ft of 3 inch PVC suction line connecting the new tanks to the booster pump system. The project also includes optional Add/Alt services consisting of replacing 1,300 ft of aged water mains with 3 inch HDPE pipe, installing a flushing hydrant, and replacing 525 ft of water services with 3/4 inch HDPE pipe and individual shut-off valves. The project is funded in part by the Vermont Drinking Water State Revolving Fund and must comply with the Davis-Bacon Act for federal wage rates and American Iron and Steel provisions of P.L. 113-76, though a BABAA waiver has been received. Bidders must provide a 5 percent bid bond and, upon award, performance and payment bonds each totaling 100 percent of the contract price. The contract includes Disadvantaged Business Enterprise requirements and mandates substantial completion within 180 days, with final completion required 45 days thereafter. Sealed bids are due by 10:00 AM on September 14, 2026, and must be submitted to Engineering Ventures PC in Lebanon, New Hampshire.

General Info

Upgrade Shady Pines water system with new tanks, booster pumps, HDPE mains, and service lines to improve reliability and efficiency.

Agency

Vermont → Department of Economic DevelopmentView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

VT, USA

Set-Aside

NONE

Documents

(1)

Shady Pines MHP Water System Improvements Advertisement for Bids

PDFadvertisement-for-bids

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyVermont → Department of Economic Development
Contacts1 person available
OfficeVT, USA
Organization / Agency
Vermont → Department of Economic Development
View Agency Profile
Office AddressVT, USA

Full Description

Show more
A. The project proposes the following work to the water system: • Replacement of the existing 40+ years old 6,000 gallon steel pressure storage tank with 2: 4,000 gallon buried fiberglass storage tanks. • Construction of a new 95 GPM dual-alternating self-priming booster pump system to pressurize the mobile home park distribution system. The existing 6,000 gallon steel pressure tank is pressurized by the 30 gpm well pump. • Construction of a 45 ft extension on the 1.5” PVC well supply line with two buried shut-off valves from the existing water building to the new water tanks. • Construction of 30 ft of 3” PVC suction line from the new water tank to the interior booster pump system. B. The project also proposes the following work to the water distribution system as Add/Alt services: • Replacing 1,300 ft of existing 1.5 in and 2 in aged water mains of various types with a 3 in HDPE water main in the southern distribution system. • Construction of a flushing hydrant on the new southern distribution system main to permit uni-directional flushing. • Replacing 525 ft of existing 0.5 in and 3/4 in water services of various types with 3/4 in HDPE water pipe and individual shut-off valves in the southern distribution system.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is seeking MBE, DBE, and WBE subcontractors and suppliers for a targeted green-street retrofit project in downtown Romney, West Virginia. The project involves the construction of approximately 343.59 linear feet of South Marsham Street between Gravel Lane and US Route 50. The scope of work includes the installation of 1,450 square feet of permeable pavement, eight vegetated stormwater management cells, and necessary drainage, underdrain, inlet, pipe, tie-in, and downspout work. Additionally, the project requires limited curb, sidewalk, ADA, apron, crossing, and traffic-calming improvements to integrate the BMP corridor, as well as the planting of six native trees and approximately 345 native plants. The goal is to treat approximately 1.7 acres of impervious surface within a 3.3-acre drainage area, concluding with final stabilization, cleanup, and restoration. This solicitation is open to various small business concerns, including veteran-owned, service-disabled veteran-owned, HUBZone, disadvantaged, woman-owned, and minority-owned businesses. To accommodate the project scale, these entities are encouraged to form consortiums if individual bid items are too large for a single firm to handle. Bids must be submitted by September 17, 2026, at 4:00 P.M. Interested parties should contact Jonah Leith or Jennifer Wilson for further details and must provide a response indicating their intent to bid.
Harbel, Inc.

POSTED

about 10 hours ago

DEADLINE

in 4 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, is a comprehensive infrastructure initiative issued by the Metropolitan Water District of Southern California through James W. Fowler Co. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches in diameter, as well as 54-inch and 145.5-inch diameter tie-ins and associated pipe fittings. Additional construction requirements include the delivery of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope extends to electrical upgrades, instrumentation and controls, piping systems, welding, disinfection, and surface restoration, alongside the excavation of cobbles and large boulders. This solicitation, posted on September 11, 2026, with a response deadline of September 29, 2026, is open to small businesses, including certified service-disabled veteran-owned, minority, and women-owned enterprises. The prime contractor, J.W. Fowler, is actively seeking subcontractor pricing and offering support to M/W/DBE firms regarding bonding, insurance, and equipment procurement to maximize participation.
James W. Fowler Co.

POSTED

about 10 hours ago

DEADLINE

in 16 days
View Details

More opportunities from Vermont → Department of Economic Development

Same awarding agency

NAICS: 485991
New
SLED
RFP_FSD_Transportation_9.11.26
Solicitation # FSD-Transportation-9.11.26
The Vermont Agency of Human Services, Department for Children and Families (DCF), Family Services Division is seeking to establish contracts with one or more providers to deliver Standard Transportation and Supported Family Time services for children and youth in state custody. These services include 24/7 transportation to schools, appointments, and visitations, as well as the provision of safe environments for supported family time with guidance and modeling for parents. While services are required statewide and potentially out-of-state, there is a specific need for contractors in the Bennington, Brattleboro, and Springfield districts. The period of performance is scheduled from January 1, 2027, through December 31, 2031, with options for three additional one-year extensions. Awards will be made based on the best interest of the State, with preference given to resident bidders and those promoting clean energy. Evaluation criteria include the bidder's project approach, five-year experience in transportation or supported family time, geographic reach, and previous experience with DCF. Selected contractors must ensure vehicles meet Vermont inspection standards and provide documentation of services to state workers within 30 days of contact. Payment terms are Net 30 days following the submission of detailed monthly invoices. The contract includes strict compliance requirements regarding non-discrimination, conflict of interest disclosures, and worker classification reporting for bids exceeding 250,000 dollars.
Special Needs Transportation

POSTED

about 22 hours ago

DEADLINE

in 6 days
View Details
NAICS: 541330
New
SLED
Centerville Brook AOP Obstructions Design Planning Hyde Park
Solicitation # 75140
The Centerville Brook AOP Obstructions Design Planning project in Hyde Park, Vermont, focuses on restoring aquatic organism passage and improving stream connectivity. The primary objective is to advance the Centerville Brook Dam removal from a 30 percent preliminary design to a 100 percent shovel-ready final design. This scope includes full structural removal of the dam, stream channel restoration, sediment management of approximately 200 cubic yards of impounded material, and the relocation of a dry hydrant to a viable downstream location at Brook Road. The project aims to eliminate flood risks, reduce streambank erosion, and enhance habitat complexity through the use of timber grade controls and Beaver Dam Analogs. Additionally, the project has expanded to include preliminary 30 percent design planning for two downstream culverts at Centerville Road and Brook Road. These structures currently act as perched barriers to native brook trout and other aquatic species. The design process will evaluate whether these culverts require full replacement or can be improved through aquatic organism passage retrofits. Managed by the Lamoille County Planning Commission and supported by grants from the Lake Champlain Basin Program and the New England Interstate Water Pollution Control Commission, the initiative seeks to establish a natural stream channel to improve water quality and flood water capacity.
Engineering Services

POSTED

2 days ago

DEADLINE

in 20 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS