SoCal Gas Line 247 Segment 2 Replacement Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The project involves the in-kind replacement of a 2,356-foot segment of an existing 16-inch diameter high-pressure natural gas transmission pipeline, Line 247, located south of El Capitan Canyon Resort and north of Highway 101 in the Gaviota Coast area of Santa Barbara County, California. The replacement will maintain the same diameter and capacity but upgrade the pipeline segment to a Class 3 safety rating, with work divided into three phases: jack-and-bore installation of 176 feet under El Capitan Canyon Creek to avoid direct disturbance; installation of an 8-inch temporary bypass line and replacement of 2,180 feet of pipeline with up to 24 bell holes for welding; and final connection to the existing line, hydrotesting, removal of the bypass, and abandonment of the 256-foot submerged segment by capping and slurry filling. Total excavation is approximately 6,000 cubic yards, including trenches for the replacement and removal of the old pipeline, bore pits, and tie-in areas, with excavated soils to be balanced onsite. The workspace will be 80 feet wide along most of the corridor, narrowing to 20 feet at the resort entrance, and staging areas will be located at both ends of the segment. No work will occur within El Capitan Creek’s Environmental Sensitive Habitat or jurisdictional wetlands. Two coast live oak trees will be impacted, requiring replacement at a 3:1 ratio using 15-gallon or larger trees, and disturbed areas will be regraded and revegetated according to an approved Habitat Restoration Plan, including restoration of the resort’s entrance landscaping. The project is governed by a Negative Declaration under the California Environmental Quality Act (CEQA), with all mitigation measures incorporated as conditions of approval, including environmental monitoring and reporting. The permit action, Case No. 23CDH-00003, was approved by Santa Barbara County on May 19, 2025, and publicly noticed on August 25, 2025. Construction is anticipated to take approximately 16 weeks, with limited extended night and weekend operations, up to three days, required for hydrotesting and final tie-ins. The lead agency is Santa Barbara County’s Planning and Development Department, while the applicant is SoCal Gas Company. The site spans four parcels with specific APNs and addresses in the 93117 ZIP code. Although the project includes detailed construction
General Info
Agency
NAICS
Place of Performance
Calle Real and El Capitan Terrace Lane, CA, 93117Set-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code