Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of Defense was posted on June 21, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

SPK DBB Beale AFB, CA Fuel Hydrant Replacement

Closed
W9123822R0051Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237120
New
Federal
DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan
Solicitation # W912HV26RA009
Solicitation W912HV26RA009, titled DESC2103C - Bulk Fuel Storage Tanks Phase II, is a construction project at Yokota Air Base, Japan, issued by the USACE Japan Engineer District. The project involves the construction of one 100,000-barrel cut-and-cover JP-8 storage tank featuring a reinforced concrete pump house with four 600-gpm issue vertical turbine pumps and one 50-gpm water draw-off pump. The scope includes the installation of a product saver tank, piping, valves, and vaults connecting to an existing filter separator building, as well as the integration of an automatic tank gauging system and control systems into the existing PLC and HMI infrastructure. The estimated project magnitude is between 7.5 and 15 billion Yen, with a performance period of 1,020 calendar days after the Notice to Proceed. This solicitation is restricted to local sources in Japan and utilizes the Lowest Price Technically Acceptable (LPTA) source selection process. To be eligible, offerors must be rated as acceptable in construction experience, system supplier subcontractor experience, and past performance. Specifically, prime contractors must demonstrate experience with fuel facility construction exceeding 1 billion JPY within the last 20 years. Proposals are due by January 25, 2027, and must be submitted via PIEE. The contract includes a priority rating of DO-C2 and specifies liquidated damages of 615,000 Yen per calendar day of delay. Compliance with EM 385-1-1 March 2024 safety procedures and the submission of a Contractor Quality Control Plan are mandatory requirements.
W2SN Endist Japan

POSTED

1 day ago

DEADLINE

in 3 months
NAICS: 237120
New
SLED
Kiefer Landfill Gas Utilization Project
Solicitation # PLER2024-00137
Kiefer Landfill Generating III, LLC is proposing to develop a renewable natural gas facility at the Kiefer Landfill in Sacramento County with a production capacity of 8,000 standard cubic feet per minute. The project will capture and process landfill gas to remove moisture and impurities, upgrading it to pipeline-quality methane that meets air quality standards. A new pipeline will be constructed to transport the purified gas to existing Pacific Gas & Electric infrastructure, with two proposed routes both beginning at the landfill and traveling northwest along Kiefer Boulevard before turning north along Sunrise Boulevard to terminate near the intersection of Sunrise Boulevard and Douglas Road. Depending on the selected route, the pipeline will connect to PG&E’s system via either a compressor station or a metering and regulating station located near designated property parcels on Douglas Road. The pipeline alignment is planned to utilize public rights-of-way and existing private easements to minimize land use impacts. The project is being managed under Sacramento County’s oversight, with environmental coordination handled by Julie Newton, and key stakeholders including applicant Andrew Petric of NextEra Energy and Project Manager Kathalyn Tung of MBaker International. The initiative is part of broader efforts to advance renewable energy by converting landfill emissions into usable natural gas, supporting regional decarbonization goals. The facility and pipeline will be sited entirely within Sacramento County, with the final interconnection point targeting PG&E’s distribution or transmission system in the 95683 zip code area. The project was posted as a forecast on June 11, 2026, and is currently undergoing environmental review under California’s CEQA process, with no set-aside or NAICS classifications provided at this stage.
Sacramento County

POSTED

5 days ago

DEADLINE

N/A
NAICS: 237120
New
SLED
Threemile Slough Pipeline Crossings Remediation and Decommissioning ProjectThe Threemile Slough Pipeline Crossings Remediation and Decommissioning Project, led by the California State Lands Commission for Pacific Gas and Electric Company, involves the remediation of active natural gas pipelines L-131Y and L-131Z to address shallow burial depths and the decommissioning and removal of two previously abandoned pipelines. Located in Rio Vista, Sacramento County, the project scope encompasses area preparation, pipeline remediation and removal, and post-construction restoration. Work is scheduled for a three-month window from August 1 through October 31, 2026, to protect special-status fish species, with a possible extension to November 30 upon authorization from the National Marine Fisheries Service. The project is subject to extensive environmental and regulatory oversight, including the California Environmental Quality Act, the Clean Water Act, and the Rivers and Harbors Act. Key compliance requirements include the identification of 3.51 acres of federal jurisdictional waters, the management of asbestos-containing materials through certified testing and approved disposal, and the implementation of a Mitigation Monitoring Program to address impacts on air quality, biological resources, and cultural sites. Safety and operational standards mandate adherence to Cal/OSHA regulations, the Lempert-Keene-Seastrand Oil Spill Prevention and Response Act, and technical standards from ASME, NACE, and ANSI. Hazardous materials must be stored in dedicated staging areas with secondary containment capable of holding 110 percent of the largest container's volume.
California State Lands Commission

POSTED

5 days ago

DEADLINE

N/A
NAICS: 237120
SLED
D-2027-03 (INSTALLATION AND ABANDONMENT OF NATURAL GAS MAIN, SERVICES AND ALL APPURTENANCES AND RELATED PAVING)
Solicitation # 36009
Philadelphia Gas Works is seeking sealed bids from qualified contractors for the installation and abandonment of natural gas mains, services, and all appurtenances, including related paving restoration, for a project located within the city of Philadelphia at 5800 Lindbergh Blvd and 2300-2500 S 58th St. The scope of work involves excavating, replacing, upgrading, and abandoning underground gas distribution systems in accordance with PGW Distribution Standards and PennDOT specifications for pavement and traffic markings. The contract will be awarded to the lowest responsive and responsible bidder based on price, performance history, financial standing, and compliance with DBE participation goals. Bids are due by October 29, 2026, at 12:00 PM and must be submitted via the pgw.procureware.com portal as searchable PDF files. The contractor is required to provide performance and payment bonds for 100 percent of the contract amount and maintain comprehensive insurance coverage, including a 20 million dollar umbrella liability policy and specific pollution liability if hazardous waste is handled. Administrative requirements include electronic invoicing via PayMode, submission of certified payroll forms, and a five percent retainage until substantial completion. Contractors must also adhere to strict safety standards, including OSHA compliance, drug and alcohol programs, and the notification of the Pennsylvania One Call System prior to excavation. Final acceptance of the work is determined by the date finished on the authorized representative's report.
Philadelphia Gas Works

POSTED

12 days ago

DEADLINE

in 8 days
NAICS: 237120
SLED
D-2027-04 (INSTALLATION AND ABANDONMENT OF NATURAL GAS MAIN, SERVICES AND ALL APPURTENANCES AND RELATED PAVING)
Solicitation # 36010
Philadelphia Gas Works is seeking sealed bids from qualified contractors for the installation, replacement, and abandonment of natural gas mains, services, and all associated appurtenances, including related paving restoration. The project is specifically located at 4500-4700 Chestnut Street within the city of Philadelphia. The scope of work includes all excavation and upgrading of the underground gas distribution system, with a requirement that all mains be tested at a minimum pressure of 90 psig with air for 24 hours. Contractors are responsible for restoring all paving removed during the project and must adhere to strict operational requirements, such as reopening closed streets daily and using Jersey barriers near SEPTA station entrances. The contract will be awarded to the lowest responsive and responsible bidder based on price, technical and operational capability, financial standing, and a history of meeting DBE participation goals. Bidders must submit a complete package via the procurement portal by October 29, 2026, including a price list, demographic survey, certificate of non-indebtedness, and a performance schedule. Required security includes a performance bond equal to 100 percent of the contract amount and a payment bond. The project is subject to prevailing wage rates and requires compliance with federal and local anti-discrimination laws. All invoicing must be handled electronically through the specified PGW accounts payable process.
Philadelphia Gas Works

POSTED

12 days ago

DEADLINE

in 8 days

General Info

Contract Value

$23,359,605

NAICS

237120 - Oil and Gas Pipeline and Related Structures Construction

Place of Performance

Beale AFB, CA, 95903, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Presolicitation

Notice updated

The notice title changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W075 Endist Sacramento
Contacts1 person available
OfficeSACRAMENTO, CA, 95814-2922, USA
Office AddressSACRAMENTO, CA, 95814-2922, USA
Contacts

Full Description

Show more
W9123822S0013 W9123822R0051 - USACE SPK DBB Two-Phase Design-Bid-Build construction of the Fuel Hydrant System Replacement at Beale Air Force Base (AFB). The U.S. Army Corps of Engineers (USACE), Sacramento District (SPK), anticipates a potential requirement to replace the fuel hydrant system at Beal Air Force Base (AFB). The Government intends to solicit a Request For Proposals (RFP) in a two phased acquisition awarded as Best Value- Lowest Price Technically Acceptable that will result in award of a Firm-Fixed Price contract. The Government estimates issuing the solicitation for Phase One of this Two-Phase Design-Bid-Build project on or around early July 2022. Project Description: Work is anticipated to include Design-Bid-Build (DBB) construction services to construct a Fuel Hydrant System Replacement. The contractor shall replace the current hydrant system by installing two-5,000 barrel tanks, a pump-house, five-600 gallon per minute pumps, seven filter separators (two receipts, five issue), two fill-stands and four hydrant outlet pits, and three position pantographs refueling arm positions 1,250 feet each. They shall install security lighting at the Hydrant Storage System, install electric product recover pumps for water draw off at tanks, install proper drainage around hydrant secondary containment berms, install all pipe supports, equipment, and appurtenances related to the new JP-8 fuel piping, and install audible alarms on tanks and pump-house. The project will include hydrant outlets, piping and related pipe appurtenances, cathodic protection, fuel pump house control room and shelter with pumps, filter separators and related piping, valves and fittings, fuel storage with containment, access walks/stairs, truck fill stands, truck unloads, hydrant hose truck checkout stand, and product recovery tank. Supporting efforts include site clearing & grading, site improvements for access roads, parking, secondary containment, drainage, utility improvements, pig launcher and receiver stations, pavement and markings, and security fencing. Electrical and communications work includes control systems, underground primary and secondary services, communications, pad mounted transformers, emergency generator, site lighting, automatic tank gauging system, grounding & lighting protection, emergency power down switches, pump connections and demolition/rerouting of existing electrical utilities. A storage and pump station will be required to continue the operation of our flight line hydrant system. Two JP-8 tanks are required to be built to maintain current flying operations and future needs. The Repair Hydrant System MILCON repairs 1952-era facilities that have reached the end of their life. If project is not implemented, the Hydrant System shall be out of environmental compliance in less than five years. This project is at a yet- operational facility with quantified serious degradation of the eight 50K gallon underground storage tanks, indicating failure is imminent. Beale AFB supports a squadron of eight KC-135R Stratotanker aircraft as well as a variety of smaller-framed aircraft from the Aeroclub. Provisions are also in place to simultaneously support two wide-body transient aircraft, which typically include C-17s or C-5s. Anti-Terrorism Force Protection, cyber-security and sustainable design principles will be incorporated into the design and construction. The potential requirement may result in a solicitation issued approximately early July 2022. If solicited, the Government intends to award the contemplated requirement as a firm-fixed-price contract by approximately 30 September 2022. It is estimated that the potential requirement can be completed within 720 calendar days. Additional Infomation: In accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 236.204(ii) the estimated magnitude of construction is expected to be between $25,000,000.00 and $100,000,000.00. The North American Industrial Classification System (NAICS) code for the potential requirement is anticipated to be 237120 (Oil and Gas Pipeline and Related Structures Construction). The small business size standard for this NAICS, as established by the U.S. Small Business Administration, is $39.5 Million annual revenue. The Product Service Code for the potential requirement is anticipated to be Y1NA (Construction of Fuel Supply Facilities). The solicitation is anticipated to be issued through the Governmentwide Point of Entry (GPE) (www.SAM.gov) on or about July 2022 as an unrestricted requirement. Please do not request a copy of the solicitation, or additional plans and specifications, as they are not currently available. Draft plans and specifications will be made available for inspection without charge after the solicitation is released, when requested and delivered by electronic mail and/or data interchange. The solicitation will be made available without charge when accessed through the GPE or requested and delivered by electronic mail and/or data interchange. PLEASE NOTE: this project and/or the proposed solicitation and contract action may be changed, delayed, or canceled at any time. The ONLY Interested Vendors / Plan Holders / Bidders List is available through SAM.gov. Contractors are responsible for self-identifying as interested vendors and contacting other interested vendors. USACE-SPK will not review capabilities statements submitted in response to this Notice or coordinate partnering arrangements between parties. Contractors should check SAM.gov frequently for changes to the interested vendors list and this Notice

More opportunities from Department Of Defense → W075 Endist Sacramento

Same awarding agency

NAICS: 237990
Federal
USACE SPK DB Construction - Natomas NPP Named Pumping Plants - Sacramento, CA
Solicitation # W9123826BA013
The USACE SPK is soliciting design-bid-build construction services for the renovation of three critical irrigation pumping stations—Elkhorn, Riverside, and Pritchard—located along the Garden Highway Levee in Sacramento, California. The project scope involves removing existing discharge piping that penetrates the levees and installing new piping that traverses over the levees to connect with landside irrigation canals. Additional requirements include levee excavation, backfilling, pavement restoration, and utility relocation. The estimated target price range for this effort is between $10,000,000 and $15,000,000, with a total period of performance of 1,095 calendar days from the date of the Notice to Proceed. This requirement is pursued through full and open competition without a set-aside, falling under NAICS code 237110. Eligible offerors must be registered in SAM and PIEE and provide a surety letter confirming bonding capability for a single action of at least $10,000,000. The contract is subject to the Davis-Bacon Act and EM 385-1-1 safety standards. Key administrative requirements include the use of the Resident Management System (RMS) for payment requests and the maintenance of a rigorous Quality Control program. Proposals must be submitted by November 3, 2026, and must include a completed SF 1442, bid guarantee, and a pre-award survey.
Other Heavy and Civil Engineering Construction

POSTED

13 days ago

DEADLINE

in 13 days
View Details
NAICS: 237990
Federal
USACE SPK DBB Construction - Sacramento River East Levee Contract 5 (SREL C5), Sacramento, California
Solicitation # W9123827X1CQR
The United States Army Corps of Engineers Sacramento District is conducting market research via Sources Sought Notice W9123827X1CQR for a potential levee repair and remediation project known as the Sacramento River East Levee Contract 5 (SREL C5). Located in Sacramento, California, the project involves remediating approximately 0.4 miles of levee segments south of downtown. The scope of work includes the construction of seepage and stability berms and buried curb walls, utility relocation and protection, soil management, and site restoration. The government estimates the construction value between $6,000,000 and $9,000,000, with an anticipated performance period of 411 calendar days from the Notice to Proceed. The government anticipates issuing a firm-fixed-price solicitation in mid-November 2026, with an intended award date in mid-February 2027. The requirement falls under NAICS code 237990 for Other Heavy and Civil Engineering Construction and Product Service Code Y1LC. Depending on the response from small business concerns, the acquisition may be set aside for small businesses under FAR 52.219-14 or competed full and open, in which case FAR 52.236-1 regarding self-performance would apply. Interested parties must submit a capability statement by 11:00 a.m. PT on October 23, 2026, detailing their experience with similar projects over the last six years and providing a surety letter to prove bonding capability.
Other Heavy and Civil Engineering Construction

POSTED

13 days ago

DEADLINE

in 3 days
View Details
NAICS: 541620
Federal
USACE Sacramento District (SPK) $47.2M Planning, Environmental, and Cultural Services (PECS) MATOC
Solicitation # W9123826RA024
The USACE Sacramento District is soliciting for a 47.2 million dollar Multiple Award Task Order Contract (MATOC) under solicitation W9123826RA024 for Planning, Environmental, and Cultural Services (PECS). This contract, categorized under NAICS code 541620, provides comprehensive support for civil works and military actions throughout the feasibility, design, construction, and operations and maintenance phases. The scope of work encompasses environmental planning and compliance, including NEPA and CEQA tasks, species and habitat surveys, air and noise assessments, and construction monitoring. Additionally, the contract covers cultural resources services, focusing on Section 106 compliance, NHPA, NAGPRA, and ARPA support, tribal consultations, the development of Memoranda of Agreement and Programmatic Agreements, and specific archival and curation requirements. Interested vendors are encouraged to attend a virtual industry meeting on September 15, 2026, at 11:00 AM Pacific Daylight Time via Microsoft Teams. To participate, vendors must submit a capability statement not exceeding four pages to the designated contracting email address prior to the meeting. The primary point of contact for this opportunity is Sean Summer, and the contract is managed by the Department of Defense through the USACE Sacramento District office located in Sacramento, California.
Environmental Consulting Services

POSTED

29 days ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS