Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

Stormwater Piping Network Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract titled Stormwater Piping Network Installation seeks a subcontractor to install all associated stormwater piping that connects system components, encompassing full scope duties such as trenching, joining, and testing of the piping infrastructure. The work is required to meet engineering and regulatory standards for proper drainage and environmental compliance, with no specified set-aside classifications indicating open competition among qualified vendors. The North American Industry Classification System code 237110 identifies the work within the Water and Sewer Line and Related Structures Construction category, aligning with municipal infrastructure development goals. The solicitation was posted on July 13, 2026, with proposals due by August 31, 2026, and the performing location is under the jurisdiction of the Vermont Department of Economic Development, though exact geographic details are unspecified. Interested parties must access the official bid preview through the provided Vermont Business Registry link to obtain full specifications and submission guidelines.

General Info

Install stormwater piping system meeting engineering and environmental standards in Vermont by August 31, 2026.

Agency

Vermont → Department of Economic DevelopmentView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

VT, US

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyVermont → Department of Economic Development
ContactsNo contacts available
OfficeN/A
Organization / Agency
Vermont → Department of Economic Development
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of all associated stormwater piping connecting system components, including trenching, joining, and testing.

Similar Contracts

NAICS: 237110
New
SLED
1947 Watermain - North Bound Airport Expressway PreservationThe Port of Seattle’s Aviation Project Management Group is forecasting the restoration of a 1947 water main located along the northbound Airport Expressway using cured-in-place pipe (CIPP) technology under a Design-Bid-Build delivery method. This project aims to preserve the integrity of the aging infrastructure by repairing the water main without extensive excavation, leveraging CIPP’s minimal disruption approach to ensure continued service reliability. The work will focus on repairing and lining the existing pipe to extend its operational life, aligning with long-term asset management goals for critical utility systems supporting airport infrastructure. The solicitation is classified under NAICS code 237110 for Water and Sewer Line and Related Structures Construction, indicating the scope is specific to underground utility rehabilitation. Primary point of contact for inquiries is Moraa Omwega, reachable via phone or email, with Ray Moreno serving as the Project Manager. The contract opportunity is currently in the forecast phase with no solicitation number assigned yet, and no details provided on set-aside status or place of performance beyond the general location along the Airport Expressway. Stakeholders are encouraged to monitor the official portal for when the formal solicitation is published and to prepare for bidding according to Design-Bid-Build procedural requirements.
Aviation Project Management Group

POSTED

about 6 hours ago

DEADLINE

N/A
View Details