Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Structural Steel Fabrication and Erection

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Structural Steel Fabrication and Erection involves the fabrication and installation of steel superstructures for office and hotel towers within the City and County of San Francisco. The scope of work includes the erection of steel beams, columns, and decking specifically designed to support high-density mixed-use structures, culminating in the delivery of a completed steel frame for prime contractors. The project is located in San Francisco, California, specifically within the 94105 zip code area. Classified under NAICS code 238110, the contract was posted on December 17, 2025, and is managed under the jurisdiction of the City and County of San Francisco.

General Info

Structural steel fabrication and erection for office and hotel towers in San Francisco.

Documents

This scope was carved out of 2021-012562ENV.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Matson Block Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City and County of San Francisco
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Fabricates and installs the steel superstructure for prime contractors on City and County of San Francisco office and hotel towers. Erects steel beams, columns, and decking to support high-density mixed-use structures. Delivers the completed steel frame.

Similar Contracts

Same NAICS industry code

NAICS: 238110
New
SLED
Install Concrete Pad for Metal Storage Building at Fire Station #63
Solicitation # FIRE-0302
The City of Santa Cruz has issued Invitation for Bids IFB No. FIRE-0302 for the installation of a concrete pad and utilities to support a metal storage building at Fire Station 63. The project scope includes demolition of existing AC material, utility trenching for fire sprinklers and electrical lines, and the installation of a concrete pad designed to support fire apparatus weighing approximately 55,000 lbs each. Additionally, the contractor is responsible for storm drain modifications, including the installation of a new bio-retention area. The total project budget is capped at 200,000 dollars, and the work must comply with the 2022 California Building and Electrical Codes, as well as NFPA standards for sprinkler trenching and backfill. Bids are due electronically via the City's e-Procurement Portal by 2:00 pm on November 19, 2026, following a mandatory pre-bid meeting on November 10, 2026. Award will be granted to the lowest responsive and responsible bidder. Required submission documents include a completed bid form, a non-collusion declaration, and at least three client references for similar projects completed within the last five years. The successful contractor must be registered with the California Department of Industrial Relations, pay prevailing wages, and provide bid, performance, and payment bonds issued by California admitted sureties. Final acceptance of the work requires a resolution from the City Council and the filing of a Release of all Claims.
Fire

POSTED

about 16 hours ago

DEADLINE

in 13 days
View Details

More opportunities from California → City and County of San Francisco

Same awarding agency

NAICS: 237990
SLED
Pier 92 Modernization and Plant Replacement ProjectThe Pier 92 Modernization and Plant Replacement Project, managed by the City and County of San Francisco, involves the reconstruction and modernization of an existing sand processing facility at the Port of San Francisco. The project aims to improve environmental controls through the construction of an enclosed warehouse, the installation and upgrading of equipment, the paving of vehicle and equipment areas, and the implementation of a modern stormwater management system. To accommodate these improvements, the facility is seeking to expand its lease area by 34,371 square feet, increasing the total footprint from 190,299 to 224,600 square feet. The project also includes obtaining an Authority to Construct and Permit to Operate from the Bay Area Air District with a proposed annual throughput limit of 800,000 tons. Construction is expected to last up to seven months and will involve the excavation or disturbance of 3,305 cubic yards of soil, while sand processing operations remain active. Environmental reviews conducted under CEQA have identified potential impacts on archaeological resources, which will be managed via accidental discovery procedures, and have addressed public concerns regarding air quality within the Bayview environmental justice community. Key coordinating agencies include the San Francisco Planning Department, the Port of San Francisco, the Bay Area Air District, and the San Francisco Bay Conservation and Development Commission. The project has undergone a comprehensive environmental impact report process with final certification hearings scheduled for October 2026.
Other Heavy and Civil Engineering Construction

POSTED

about 1 month ago

DEADLINE

N/A
View Details
NAICS: 237990
SLED
Potrero Power Staton Mixed-Use Development ProjectThe Potrero Power Station Mixed-Use Development Project is a multi-phased redevelopment of a 29-acre site along San Francisco's central bayshore waterfront, formerly the site of the Potrero Power Plant. The 2025 modified project expands the scope to approximately 5.6 million gross square footage across 15 development blocks, incorporating residential market-rate and affordable housing, commercial office, retail, hotel, research and development, and industrial production, distribution, and repair uses. The project also includes the creation of waterfront open space, a dock facility, shoreline improvements, and an internal grid of public streets and utilities. Construction began in 2020 with an original estimated completion date of 2035. The project is managed by the City and County of San Francisco and is governed by the Potrero Power Station Special Use District and CEQA guidelines. A critical component of the project is the Mitigation Monitoring and Reporting Program, which mandates strict compliance with environmental standards regarding air quality, noise, and biological resources. Key requirements include the use of renewable diesel, a two-minute idling limit for diesel engines, and the implementation of a Construction Emissions Minimization Plan. Additionally, the project requires the installation of ADA-compliant curb ramps and specific on-street ADA parking. Environmental safeguards are in place to protect marine mammals during pile driving and to manage the discovery of archaeological or paleontological resources, which may temporarily suspend construction.
Other Heavy and Civil Engineering Construction

POSTED

3 months ago

DEADLINE

N/A
View Details
NAICS: 237130
SLED
PG&E Power Asset Acquisition Project
Solicitation # 2023-005370ENV
The City and County of San Francisco is undertaking the acquisition of Pacific Gas and Electric Company’s electrical transmission and distribution assets within San Francisco and portions of San Mateo County to assume direct ownership, operation, and maintenance of the local electricity grid. This project does not involve natural gas facilities, which PG&E will continue to provide. The acquisition requires substantial physical separation of the existing electrical infrastructure along the San Francisco–San Mateo county boundary to enable independent and reliable operation by both the City and PG&E. Key construction activities include modifying or rebuilding the Martin Substation, constructing approximately 3.8 miles of new underground express distribution feeders routed through public rights-of-way from Arch Street to the Martin Substation in Brisbane, and making localized above- or below-ground modifications to distribution lines near the county line. Construction is expected to take approximately three years following asset transfer. The project’s environmental compliance is governed by California law, with all contractual obligations binding on the City, its successors, and assigns in perpetuity. Termination rights allow either party to end the agreement with thirty days’ written notice, and any unenforceable provisions will be severed without voiding the remainder. Administrative costs are outlined in detail, including annual recurring expenses for chip sealing, groundwater monitoring, trench maintenance, and DTSC oversight, with a total estimated contract value of $1,587,331 based on a thirty-year net present value calculation. An advance payment of $2,900 is required within ten days of full execution for DTSC, with quarterly billing and sixty-day payment terms. Contractors must comply with rigorous environmental and safety protocols, including mandatory Worker Environmental Awareness Program training covering protected species avoidance, hazardous material handling per Cal/OSHA standards, and site-specific Health and Safety Plans addressing chemicals of potential concern and emergency response. Extensive documentation, including permits, waste manifests, laboratory analyses, and chains of custody, must be submitted to DTSC upon completion. Attachments and appendices provide supporting technical data on noise, biological resources, air quality, hazardous materials, and historic gas plant sites, ensuring comprehensive regulatory adherence throughout the project lifecycle.
Power and Communication Line and Related Structures Construction

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 541620
SLED
2245-2255 Post Street (JFCS Holocaust Center) FMND
Solicitation # 2024-011443ENV
The City and County of San Francisco is overseeing the redevelopment of 2245-2255 Post Street for the Jewish Family and Children's Services Holocaust Center. The project involves the demolition of two existing buildings and the construction of a new four-story building, approximately 60 feet tall with a total height of 68 feet 6 inches including rooftop equipment. The new facility will encompass approximately 34,073 gross square feet and will feature public exhibition rooms, a lecture hall, a library, offices, educational and conference spaces, and archives. The project is designed without vehicular parking and is expected to take approximately 21 months to complete. The project is governed by the California Environmental Quality Act and adheres to NC-3 zoning and 65-A Height and Bulk District regulations. A Mitigated Negative Declaration has concluded that the project will not have significant adverse environmental impacts, provided specific mitigation measures are implemented. These include strict adherence to the San Francisco Clean Construction Ordinance, requiring Tier 4 Final off-road emission standards for equipment over 25 horsepower and a two-minute idling limit for diesel engines. Additionally, the project requires an archeological testing and monitoring program managed by an Environmental Review Officer, which may include construction suspensions of up to four weeks for data recovery. Contractors must also comply with Title 8 of the California Code of Regulations regarding hazard communication and the labeling of hazardous substances.
Environmental Consulting Services

POSTED

10 months ago

DEADLINE

N/A
View Details
NAICS: 237990
SLED
Cherry Valley Dam Spillway Short-Term Improvement Project
Solicitation # 2022-000353ENV
The San Francisco Public Utilities Commission is implementing the Cherry Valley Dam Spillway Short-Term Improvement Project in Tuolumne County, California. The project focuses on rehabilitating a segment of the unlined spillway discharge channel to restore its original north-south alignment and properly direct water toward Cherry Creek. This action is necessary because landslide debris has obstructed the channel, causing flows to divert toward public camping areas and the Cherry Power Tunnel Adit entrance. The scope of work includes debris removal, embankment construction, erosion protection, and road improvements, with construction anticipated to last approximately six months starting in June 2026. The project is governed by the California Environmental Quality Act, with a Mitigated Negative Declaration and a Mitigation Monitoring and Reporting Program adopted on January 6, 2026. Key regulatory coordination involves the California Department of Fish and Wildlife regarding endangered species and streambed alterations, the Central Valley Regional Water Quality Control Board for water quality and storm water permits, and Caltrans for traffic impacts and encroachment permits on State Route 120. Special requirements include strict hazardous materials management using secondary containment and onsite spill kits, noise mitigation in compliance with local ordinances, and the potential suspension of work if archaeological resources are discovered. Traffic control measures, including flaggers and non-peak hour scheduling, are required to maintain pedestrian and vehicle circulation.
Other Heavy and Civil Engineering Construction

POSTED

10 months ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS