Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Department Of Defense was posted on June 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Structured Cabling Installation – Cat-6 Cable Deployment

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
SLED
Existing Generators Replacement Aguadilla, PR
Solicitation # 872298
This project involves the complete replacement of two existing power generators at the Aguadilla Detention Facility in Aguadilla, Puerto Rico. The scope of work requires the installation of one 100 kW and one 150 kW Perkins diesel generator, both featuring stainless-steel enclosures to protect against salt air and moisture. The installation includes two new NEMA 3R automatic transfer switches, securing the units to the existing concrete slab with Grade 5 or higher galvanized anchor bolts, and performing comprehensive generator load tests. The project is estimated to have a magnitude between $250,000 and $300,000, with a total period of performance of 270 calendar days from the Notice to Proceed. The contract is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) IDIQ. Award will be based solely on the lowest total evaluated price, provided the offeror demonstrates technical understanding, a sound implementation approach, and a robust safety and quality control program. Key compliance requirements include adherence to the Buy American Act, Davis-Bacon prevailing wage rates per determination PR20260001, and strict security protocols, including PIV card issuance and non-disclosure agreements for personnel. All work must be performed during regular business hours, Monday through Friday, and must comply with NFPA 70, the International Building Code, and NEC Article 445.
Bristol Alliance of Companies

POSTED

about 5 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
SLED
LED Lighting and Occupancy Sensor Upgrades DRAFT
Solicitation # 872291
The LED Lighting and Occupancy Sensor Upgrade project is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) for the Buffalo Federal Detention Facility in Batavia, New York. The project involves providing all engineering, labor, equipment, and materials to upgrade the facility with energy-efficient LED lighting fixtures and occupancy sensors, including the removal and disposal of existing fluorescent fixtures, lamps, and ballasts. The estimated magnitude of the contract is between 2 million and 2.3 million dollars, with a period of performance of 180 calendar days from the notice to proceed. Award will be based solely on the lowest total evaluated price. The contractor is required to adhere to Davis-Bacon Act wage determinations and comply with standards from OSHA, ADA, NFPA, and the International Building Code. Key deliverables include a Quality Control Plan due within 15 days of award, a site survey within 30 days, and a final closeout package consisting of as-built drawings, warranty documentation, and 5 percent attic stock. The contractor must also provide a minimum two-hour training session for facility maintenance personnel and a detailed commissioning report verifying that 100 percent of fixtures and controls were tested. Payment requests must be submitted electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 5 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
SLED
Conex Offices for Forensics Personnel - St. Thomas
Solicitation # 872300
This project involves a Firm-Fixed-Price task order under an 8(a) Multiple Award Construction Contract for the provision and installation of two 40ft steel FLEXTAINER conex offices for forensics personnel at the St. Thomas HSI Facility in the US Virgin Islands. The scope of work includes the construction of 3k PSI reinforced concrete slabs, installation of the units, and equipping each office with two split-system A/C units, R-11 insulation, vinyl flooring, LED lighting, and a steel door with a Cypher lock. Each unit must also include four security windows and a 5-pound ABC fire extinguisher. Electrical connectivity must be established via 2-inch PVC or uPVC conduit to the nearest circuit. The contract has an estimated magnitude between 250,000 and 300,000 dollars, with a period of performance of 364 calendar days from the Notice to Proceed. Award will be based on the lowest total evaluated price, considering technical approach, safety, and quality control plans. Key requirements include compliance with the Buy American Act, adherence to Davis-Bacon prevailing wage rates for the Virgin Islands, and strict security protocols, including the signing of DHS Non-Disclosure Agreements and mandatory cybersecurity training. Contractors must conduct a site survey prior to proposal submission and provide a detailed project schedule within 15 days of the Notice to Proceed. All invoicing must be processed through the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 5 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
IE JCC Fire Alarm Repairs
Solicitation # Inland Empire Fire Alarm Deficiencies (169706,169708,169733,169736 & 16937)
Management & Training Corporation (MTC), operator of the Inland Empire Job Corps Center in San Bernardino, California, is soliciting subcontractor bids for a fixed-price, single lump sum contract to address fire alarm deficiencies. The scope of work includes the installation of manual pull stations, horn/strobe notification appliances, and the replacement of six existing fire alarm bells with new horn/strobe units. All new devices must be integrated into the existing fire alarm system and undergo complete functional testing. The project must be completed within 90 consecutive business days following a written Notice to Proceed, with work beginning within five business days of an agreed-upon start date. Bids are due by 3:00 pm PT on September 16, 2026. Submissions must include the MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, a completed MTC Supplier Packet (W-9, self-certification, and terms acceptance), and proof of insurance. For bids equal to or greater than $25,000, a bid bond guarantee of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds totaling 100% of the contract price. The contract is subject to Construction Wage Rate Requirements (CWRR), requiring compliance with California prevailing wage determinations and the submission of weekly certified payroll. Award will be based on overall best value.
Inland Empire Job Corps

POSTED

about 5 hours ago

DEADLINE

in 5 days

AI Contract Overview

Show more

The contract entails the installation of new Cat-6 structured cabling within Building B20388 at Kirtland Air Force Base, specifically in Road Forks, New Mexico, with a zip code of 87117. The scope includes full routing, termination, labeling, and pathway installation of cabling systems, all conforming to both military specifications and industry standards to ensure reliability, performance, and future scalability. Work must be executed with precision to meet the stringent requirements of a Department of Defense facility, with attention to safety, security, and operational continuity during construction. This is a total small business set-aside solicitation under NAICS code 238210, meaning only small businesses may compete, and it is structured as a subcontract opportunity. The solicitation was posted on June 17, 2026, with a firm deadline for responses on July 17, 2026, at 11:00 PM Eastern Time. The contracting office is under the FA9401 377 MSG PK agency, part of the Department of Defense, emphasizing the federal critical infrastructure nature of the project. All work must be completed to exacting standards, with documentation and compliance required for military audit and inspection protocols.

General Info

Install Cat-6 cabling in Building B20388 at Kirtland AFB under small business set-aside by July 17, 2026.

Agency

Department Of Defense → FA9401 377 Msg PkView Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

ROAD FORKS, NM, 87117, USA

Set-Aside

SBA

Documents

This scope was carved out of FA940126R0014.

The full solicitation package (8 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

ISP CAT-6 Cabling for B2038

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA9401 377 Msg Pk
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → FA9401 377 Msg Pk
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Install new Cat-6 structured cabling in Building B20388 at Kirtland AFB, including routing, termination, labeling, and pathway installation per military and industry standards.

More opportunities from Department Of Defense → FA9401 377 Msg Pk

Same awarding agency

NAICS: 237110
New
Federal
SOR Waterline Repair
Solicitation # FA940126R0023
Solicitation FA940126R0023 is a firm-fixed-price design and build contract for the repair and upgrade of the Starfire Optical Range waterline, tanks, and pumps at Kirtland Air Force Base, New Mexico. The project involves the installation of a 7,900-foot high-pressure waterline using 8-inch Class 350 Ductile Iron Pipe, the addition of a 15,000-gallon tank with booster pumps prior to Pump Station 2, and a 5,000-gallon tank with a pre-packaged pump station at the SOR site. The scope also includes SCADA and control system upgrades, the provision of a portable hoist for pump and motor maintenance, and the abandonment of the existing waterline. This effort is a total set-aside for small businesses under NAICS code 237110. The award will be based on a best-value or lowest-priced technically acceptable basis, evaluating technical approach, past performance, and price. Contractors must adhere to strict security protocols for base access, including the submission of attendee details for sponsorship or the presentation of valid U.S. passports or birth certificates. Access to controlled unclassified information requires a completed DD Form 2345 via the Joint Certification Program. All work must comply with UFC, AWWA, and local electrical and building codes, with labor rates governed by the Davis-Bacon wage determination for Bernalillo County. Proposals are due by September 17, 2026.
Water and Sewer Line and Related Structures Construction

POSTED

about 21 hours ago

DEADLINE

in 6 days
View Details
NAICS: 238210
New
Federal
Wash Rack Utility Connection
Solicitation # FA940126Q0043
Solicitation FA940126Q0043 is a total small business set-aside for the extension and installation of electrical power and plumbing water supply from the existing Aerospace Ground Equipment shop to an exterior wash rack at Building 381, Kirtland AFB, New Mexico. The project is designed to support high-pressure equipment cleaning and involves trenching, asphalt cutting, electrical panel upgrades, and plumbing installation for a catch tank. The contract is a single lump-sum Firm-Fixed-Price award with a performance period of 365 calendar days from the notice to proceed, although the technical execution plan must demonstrate completion within a 100-day window. Award will be based on the Lowest Price Technically Acceptable (LPTA) method. Offerors must submit a technical execution plan of no more than two pages and a realistic project schedule. Past performance will be evaluated using government databases such as CPARS and SAM.gov rather than contractor-provided references. Proposals are due by 1:00 PM MST on September 22, 2026, and must be submitted via email to the Contracting Officer. The contractor is required to use the Wide Area WorkFlow system for invoicing and must adhere to strict safety and environmental standards, including the submission of Safety Data Sheets for all hazardous materials.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

2 days ago

DEADLINE

in 10 days
View Details
NAICS: 236220
New
Federal
Renovate Secure Facility B1049
Solicitation # FA9401-26-R-0024
Solicitation FA9401-26-R-0024 is a request for proposal for design-build construction services to renovate Secure Facility B1049 at Kirtland Air Force Base, New Mexico. This small business set-aside project involves the complete removal of an existing Space Saver storage system and the construction of a new 25-by-25-foot enclosed storage space featuring a mezzanine accessible by a metal staircase and the installation of four opaque skylights. The contractor is responsible for all licensed design professionals, labor, materials, and utility modifications necessary to complete the project. The period of performance is 427 calendar days from the receipt of the Notice to Proceed, with a firm-fixed-price arrangement for a single lot. The government will award the contract using a lowest price technically acceptable approach, where proposals are sorted by price and evaluated in batches of three. To be eligible for award, offerors must receive a pass rating on both technical and past performance factors. Technical evaluations focus on the prime contractor and design team organization, the approach to storage system removal, and the strategy for constructing the storage space and mezzanine. Proposals must be submitted via email to the contracting officer by 3:00 PM MST on September 16, 2026. Key contractual requirements include the provision of both performance and payment bonds and adherence to Davis-Bacon Act wage determinations for Bernalillo County. Contractors must utilize the Wide Area WorkFlow system for invoicing and comply with strict base access and security protocols, including the reporting of any compromise of classified information. The project also mandates compliance with environmental packaging preferences and specific safety standards, requiring the appointment of a Site Safety and Health Officer and Quality Control personnel.
Commercial and Institutional Building Construction

POSTED

3 days ago

DEADLINE

in 4 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS