Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on August 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Supply of Long-Lead Materials for VCS/S1L Components

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 423440
New
Federal
J072--JR/BP POTS AND PANS ROOM | WASHINGTON DC VAMC
Solicitation # 36C24527Q0043
The Department of Veterans Affairs is seeking a contractor for the emergency procurement, delivery, and factory assembly of commercial-grade kitchen equipment for the Nutrition and Food Services Pot and Pan Washing Room at the Washington DC VA Medical Center. This firm-fixed-price acquisition is driven by critical infection control and physical environment deficiencies identified during a June 2026 Joint Commission survey. The required equipment includes a custom Aerowerks two-compartment sink system with a drainboard, a Salvajor food waste disposer, and a Hobart TurboWash II pot scrubber. All equipment must be NSF listed, commercial grade, and compliant with Joint Commission, CMS Conditions of Participation, and FDA Food Code standards. The contractor is responsible for freight, uncrating, and delivery to the facility within 60 calendar days of award. A qualified Aerowerks technician must perform the on-site assembly within 14 days of delivery to preserve the manufacturer warranty. Strict safety and cleanliness protocols are in effect, including the requirement for hot work permits for welding and the immediate removal of all packaging and metal debris to prevent food service contamination. Payment will be issued via a single electronic invoice on a Net 30 basis following the COR's written acceptance of the installed and inspected equipment.
245-NETWORK Contract Office 5 (36C245)

POSTED

1 day ago

DEADLINE

in 8 days
NAICS: 423440
New
SLED
Security Badging and Equipment
Solicitation # ITB-2026-0030
The City of Houston, through its Finance Department's Strategic Procurement Division, is soliciting bids under solicitation ITB-2026-0030 for the provision of security and badging equipment for various city departments. The contract is structured for an initial term of three years, with two additional one-year extension options at the city's discretion, with an estimated start date of April 2027. Awarded vendors must furnish new and unused equipment, parts, and components on an FOB destination basis. Pricing is based on a percentage applied to the Manufacturer's List Price Schedules, and all invoices must be processed through the City's SAP Business Network (Ariba) with standard 30-day payment terms, though early payment discounts are available. To be considered responsive, bidders must pass a two-step evaluation process by submitting a Minimum Requirement Form that demonstrates at least three previous prime contracts of similar size and scope. Additionally, vendors must provide written confirmation of their ability to deliver items within five working days and provide 48-hour delivery services when required. Required submission documents include an official signature page, ownership information, anti-collusion statements, and conflict of interest questionnaires. The contract includes strict adherence to Title VI non-discrimination, the City's Equal Employment Opportunity Ordinance, and specific indemnification and insurance requirements. The response deadline for this solicitation is December 17, 2026.
City of Houston

POSTED

4 days ago

DEADLINE

in about 2 months

AI Contract Overview

Show more

This subcontract with the Department of Defense and NSWC Carderock involves the supply of long-lead raw materials and specialized sub-components required for the fabrication of VCS/S1L hardware. The contractor is responsible for sourcing specific alloys according to technical drawings and providing comprehensive material certifications and provenance documentation. A critical requirement of the contract is ensuring strict compliance with prohibited source restrictions through rigorous OEM and distributor verification. The opportunity is designated as a total Small Business Set Aside under NAICS code 423440. The solicitation was posted on August 25, 2026, with a response deadline of September 8, 2026. The primary objective is the delivery of certified raw materials to prime contractors supporting Naval Surface Warfare Center projects.

General Info

Small business subcontract for certified raw materials and components for DoD VCS/S1L hardware.

NAICS

423440 - Other Commercial Equipment Merchant Wholesalers

Place of Performance

MD, USA

Set-Aside

SBA

Documents

This scope was carved out of N0016726R1004.

The full solicitation package (9 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Request for Proposal

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Nswc Carderock
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies raw materials and specialized sub-components for the fabrication of VCS/S1L hardware for prime contractors on Naval Surface Warfare Center (NSWCCD) projects. Sources specialized alloys as specified in technical drawings and provides material certifications and provenance documentation. Ensures compliance with prohibited source restrictions via OEM/Distributor verification. Delivers certified raw materials.

More opportunities from Department Of Defense → Nswc Carderock

Same awarding agency

NAICS: 333415
New
Federal
NSWCCD York Chill Pump Replacement
Solicitation # N0016727Q1002
The Naval Surface Warfare Center, Carderock Division (NSWCCD) is soliciting quotes for the procurement, delivery, and turn-key installation of a replacement pump (Pump No. 1) for York Chiller No. 1 in Building 157. This equipment is critical for providing chilled-water cooling to the Building 13 Server Rooms. The project requires the removal of the damaged pump and the installation of a York Chill Pump, Model YLAA0080SJ46X, Serial SEMM-609950. Due to the proprietary nature of the equipment, the contractor must utilize certified Johnson Controls technicians or representatives. The installation must be completed on or before December 18, 2026, at the NSWCCD facility in Bethesda, Maryland. This is a brand-name restricted procurement under full and open competition and is not set aside for small businesses. The government intends to award a single firm-fixed-price purchase order based on the lowest price technically acceptable method, evaluating quotations on a pass/fail basis for technical requirements and considering past performance via the Supplier Performance Risk System. All quotes must be submitted on official company letterhead, including all-inclusive pricing and business size, and sent via email to the contract specialist and contracting officer by 09:00 AM EDT on November 06, 2026. The contract includes specific requirements for item unique identification per MIL-STD-130 and electronic invoicing through the Wide Area WorkFlow system.
Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing

POSTED

1 day ago

DEADLINE

in 10 days
View Details
NAICS: 541330
New
Federal
RFP for Advanced Signatures Technologies (AST)
Solicitation # N0016726R3104
The Department of the Navy, Naval Surface Warfare Center, Carderock Division (NSWCCD), is soliciting Advanced Signatures Technologies (AST) Support Services under the SeaPort-NxG Multiple Award Contract. This total small-business set-aside requirement focuses on the integration of emerging software technologies, including Big Data processing, cloud computing, and predictive data analytics, to support naval signatures tactical guidance, training, and synthetic simulation for systems afloat and ashore. The scope emphasizes the use of Agile software development and DevSecOps practices, incorporating data science, micro-services, virtualization, and Geospatial Information Systems. The contract is structured as a five-year period of performance, consisting of a one-year base period and four one-year option periods. It utilizes a Cost-Plus-Fixed-Fee (CPFF) arrangement for labor and Cost No Fee for other direct costs. The estimated level of effort includes approximately 200,640 hours for key personnel and 133,440 hours for non-key personnel over the five-year term. All proposed personnel must be U.S. citizens and hold at least a Secret security clearance, with specific roles requiring adherence to Cyberspace Workforce (CWF) certification standards. Award will be based on a best-value trade-off determination, evaluating technical approach, management, and personnel as the most important factor, followed by a pass/fail past performance assessment and a cost proposal. The government will maintain Government Purpose Rights for all developed data and software. Proposals must be submitted exclusively through the PIEE Solicitation Module by SeaPort-NxG MAC holders.
Engineering Services

POSTED

1 day ago

DEADLINE

in 6 days
View Details
NAICS: 334519
New
Federal
Radiological Detection System Supplies
Solicitation # N00167-26-RFPREQ-CD-63-0118
The Naval Surface Warfare Center Carderock Division, in collaboration with Naval Sea Systems Command, is seeking sources for the design, engineering development, fabrication, and testing of Radiological Detection System (RDS) equipment. This effort aims to replace legacy survey meters and address parts obsolescence to maintain radiological safety standards for shipboard and public shipyard activities. The requirement includes the production of up to 1,300 RDS Base Units, 1,800 Beta/Photon Probes, 1,800 Common Probe Cables, 2,800 Configuration 2 Cases, and 5,200 AA batteries. All equipment must comply with performance specification PRF-JPM-RND-RDS-001 (Amd 5) and sampling procedures under ASQ/ANSI Z1.4-2003. The period of performance for the primary deliverables is one year after contract award, with an additional one-year option for Option CLIN 1001. Manufacturing will occur at the contractor's facility, and the government will conduct acceptance testing within 60 days of delivery. Contractors must provide calibration certificates for each device and are responsible for remediating any non-conforming lots within 60 calendar days at no additional cost to the government. Certain technical specifications are designated as Controlled Unclassified Information and will be provided as Government Furnished Information within 30 days of award. This sources-sought effort, under NAICS code 334519, is open to large businesses and various socio-economic small business categories, including SDVOSB and HUBZone.
Other Measuring and Controlling Device Manufacturing

POSTED

5 days ago

DEADLINE

in 23 days
View Details
NAICS: 541330
New
Federal
Weapons Effect Solicitation
Solicitation # N0016727R3103
Solicitation N0016727R3103 is a request for proposals from SEAPORT-NxG MAC holders to provide scientific and technical services for the Naval Surface Warfare Center Carderock Division. The scope of work focuses on theoretical and applied research regarding the response of US Navy surface and undersea platforms to threat weapon engagements, specifically underwater explosions (UNDEX), air explosions (AIREX), and penetrating weapons. The contractor will develop and utilize specialized software codes to simulate shock environments, support live fire test and evaluation programs, and solve finite element models for elastic-plastic responses. This effort requires experts capable of simulating nuclear underwater shock and air blast environments from far field locations and ensuring the integrity of computational models. The contract is structured as a Cost Plus Fixed Fee (CPFF) arrangement consisting of a base period from July 6, 2027, to July 5, 2028, with four subsequent one-year option periods. Labor is categorized under holding CLINs with an estimated 78,020 hours per period, alongside separate CLINs for Other Direct Costs. Proposals are evaluated based on technical approach, management, personnel qualifications, and software process improvement initiatives, with technical factors weighted more heavily than cost. Personnel must meet strict qualifications, including a Secret security clearance and specific experience in maritime weapons effects and Navy safety regulations. All proposals must be submitted via the PIEE Solicitation Module, and the government will maintain a 15 percent fixed fee withhold up to 100,000 dollars.
Engineering Services

POSTED

5 days ago

DEADLINE

in 28 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS