Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Surveying and Site Layout Services

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract entails comprehensive surveying and site layout services including topographic surveying, boundary verification, and precise construction layout for both site and structural elements. These services are critical to ensuring accurate spatial data and alignment for upcoming development or infrastructure projects within Utah. The work will require certified professionals with expertise in land surveying practices, adherence to state-specific regulations, and the ability to deliver reliable data for engineering and construction teams. The opportunity is structured as a subcontract under NAICS code 541370, indicating specialized engineering services related to surveying. The posting was made on August 6, 2026, with responses due by August 20, 2026, providing potential bidders with a 14-day window to submit proposals. The agency responsible is the Utah state entity, with the work expected to be performed within the state, though specific location details are not provided. Interested parties must access the opportunity through the designated portal at the provided web link to review full requirements and submit responses.

General Info

Utah-based surveying subcontract for topographic, boundary, and construction layout services due August 20, 2026.

Agency

NAICS

541370 - Surveying and Mapping (except Geophysical) ServicesView NAICS

Place of Performance

UT, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyUtah
ContactsNo contacts available
OfficeN/A
Organization / Agency
Utah
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Topographic surveying, boundary verification, and construction layout for site and structural elements.

Similar Contracts

Same NAICS industry code

NAICS: 541370
New
SLED
04A7615 - A&E On-call Roadway Construction services, District 04.
Solicitation # 04A7615
The California Department of Transportation (Caltrans), District 4, is soliciting Statements of Qualifications (SOQs) for an on-call, three-year contract to provide professional and technical A&E services for roadway construction projects in Alameda, Contra Costa, and Santa Clara counties, with potential extensions up to a thirty-mile radius into adjacent districts. The estimated contract value ranges from $19.6 million to $31.85 million, with final pricing to be negotiated after selection of the most highly qualified firm. Services include roadway construction inspection, electrical and landscape architectural inspection, CPM scheduling, and consultant resident engineering, all performed on an as-needed basis under separate task orders. All work must comply with Caltrans’ Standard Specifications, Construction Manual, State Contract Act, and applicable federal regulations, including 49 CFR Part 26 for Disadvantaged Business Enterprise participation. Proposers must demonstrate compliance with DBE and DVBE good faith efforts through required documentation forms and certify adherence to prevailing wage laws via DIR registration. Key personnel must be pre-approved by Caltrans, substitutions require written authorization, and all staff must sign confidentiality agreements and complete annual cybersecurity training. SOQs must be submitted as a single, unpassword-protected PDF using Adobe Acrobat 10 or later, adhering to strict formatting rules including seven tabbed sections, page limits, and a specific file naming convention. Submissions are exclusively electronic via Caltrans’ Novell Filr portal, with no hard copies or email/fax accepted. Evaluation is weighted 25% on initial documentation and 75% on an oral interview and presentation, where firms will respond to technical scenarios and demonstrate key staff availability and project approach. Contract administration requires strict documentation including monthly pay estimates, change orders, force account records, daily inspections, and incident reports, all subject to Caltrans Contract Manager approval prior to payment. Vehicles must be clearly marked, digital deliverables must be modifiable and compatible with Caltrans systems, and all work remains subject to final inspection regardless of prior approvals.
California Department of Transportation

POSTED

about 16 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from Utah

Same awarding agency

NAICS: 237990
New
SLED
(Resolicitation) Reclamation Construction for Sowbelly Gulch Project
Solicitation # JH27-1-1
The State of Utah, through the Division of Purchasing and the Division of Oil, Gas and Mining, is soliciting bids for the Reclamation Construction Sowbelly Gulch Project in Carbon County, Utah, with a focus on closing one abandoned mine in Trash Canyon, maintaining four previously closed mine openings in Spring Canyon, and revegetating disturbed areas at abandoned coal mines. The project, identified by solicitation number JH27-1-1, has a response deadline of August 20, 2026, and all work must be completed by August 31, 2026, with possible extensions for weather-related delays. A mandatory site visit is required, with coordinates provided for the pre-bid meeting, and vendors must attend to be eligible. The contract will be awarded to the lowest responsible and responsive bidder based on the total bid price, considering both lump sum amounts and unit prices for all work items, with award contingent upon reasonableness and alignment with the owner’s interests. The estimated value is $45,000, though no official ceiling is specified. The contractor must furnish all labor, materials, and equipment meeting detailed specifications including mine closure methods such as block wall maintenance, native stone wall construction, backfilling, and concrete or urea silicate foam applications, all governed by General Technical Specifications and site-specific requirements under Section 0300. Payment terms include monthly progress submissions, with 5% of total contract cost withheld as retainage and an additional 40% withheld on mobilization until full completion and acceptance. Payment is strictly for work accepted by the owner, with final acceptance requiring complete operability of all systems. The contractor must provide a 100% performance bond and 100% payment bond, along with $1 million in combined single limit general and automobile liability insurance, and workers’ compensation coverage. Compliance with the Davis-Bacon Act, Build America Buy America Act, and Surface Mining Control and Reclamation Act is mandatory, including eligibility verification through the Applicant/Violator System. The contractor must also certify compliance with federal and state non-discrimination, anti-lobbying, anti-boycott, and E-verify requirements, and agree to indemnify the State of Utah. Liquidated damages of $781 per day apply for delays, and violations may lead to termination with ten days’ notice, or thirty days’ notice if federal funds are withheld. All documentation, including bid schedules, technical specifications, and attachments,
Other Heavy and Civil Engineering Construction

POSTED

about 16 hours ago

DEADLINE

in 14 days
View Details
NAICS: 423450
New
SLED
IFB: Stryker Lifepak CR2 Fully Automatic AEDs
Solicitation # AL27-003-IFB
Granite School District is seeking bids to procure Stryker Lifepak CR2 Fully Automatic AEDs with specific requirements including English language interface, child mode, handle, USB connectivity, and an 8-year warranty. Each unit must be supplied with one pair of adult/child Quick-Step electrodes and one battery, both with a minimum 4-year lifespan, along with a USB cable and operating instructions. Vendors must guarantee that all units are new, genuine Stryker products sourced directly from the manufacturer or authorized distributors; refurbished, used, grey-market, or third-party modified devices are strictly prohibited. Bids must be submitted via the official cost sheet, incorporating a trade-in rebate for eligible ZOLL AED Plus units, which will be collected by the district using original packaging materials while the vendor covers all associated shipping costs and provides packing slips for each shipment to the rebate center. The district is requesting quotations for 30 AEDs with trade-in rebate and 20 without, anticipating an additional purchase of approximately 50 units in February, contingent on the awarded vendor maintaining the original pricing. If pricing cannot be honored, the district will resolicit the order through competitive bidding. While the intent is to award a single contract to the lowest responsive and responsible bidder, the district reserves the right to award separate contracts if a different vendor offers lower pricing for the non-trade-in units. The district may also purchase up to 50 additional units within the following 12 months, provided the vendor agrees to honor the awarded pricing. All bids must be submitted by the deadline, and responses must include the designated shipping details and information on qualifying trade-in devices, which are primarily ZOLL AED Plus units with serial numbers beginning in X17A or X17B followed by six digits.
Medical, Dental, and Hospital Equipment and Supplies Merchant Wholesalers

POSTED

about 19 hours ago

DEADLINE

in 18 days
View Details
NAICS: 237110
New
SLED
CDBG 11 King Street Waterline and Infrastructure Improvement Project
Solicitation # WA2025001
The CDBG 11 King Street Waterline and Infrastructure Improvement Project involves replacing aging water infrastructure along King Street from 100 North to 500 East in American Fork City, Utah. The project targets 80-year-old or older cast iron and galvanized waterlines, service laterals, isolation valves, and fire hydrants that require urgent renewal to ensure public safety and water system reliability. In alignment with sustainable infrastructure goals, the scope extends beyond waterline replacement to include coordinated repairs to existing drainage systems, roadway surfaces, streetlights, and sidewalks, with specific attention to addressing ADA accessibility deficiencies throughout the corridor. This integrated approach aims to minimize disruption by combining multiple capital improvements into a single, comprehensive effort. The solicitation for this project, identified as WA2025001, was posted on August 6, 2026, with a response deadline of August 27, 2026. It is administered by the state of Utah through its agency office, and the work will be performed entirely within the designated project area in American Fork City. Although no specific set-aside classification or NAICS code is provided, the project is open to qualified contractors seeking to bid on a multi-disciplinary infrastructure upgrade. All proposals must be submitted through the designated online portal before the deadline to be considered for award.
Water and Sewer Line and Related Structures Construction

POSTED

about 20 hours ago

DEADLINE

in 20 days
View Details