Title: Industry Day for Beneficial Use of Dredge Material at Piney Island, MCAS Cherry Point, NC

Active
PANSAD-26-P-0000-033712Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of Defense → W074 Endist WilmingtonView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

MCAS Cherry Point, NC , NC, 28533

Set-Aside

NONE

Documents

(1)

Attachment A - Navigation Channels and Sediment Sources

PDFspecifications

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

special-notice

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Wilmington
Contacts2 people available
OfficeWILMINGTON, NC, 28403-1343, USA
Organization / Agency
Department Of Defense → W074 Endist Wilmington
View Agency Profile
Office AddressWILMINGTON, NC, 28403-1343, USA

Full Description

Show more
Title: Industry Day for Beneficial Use of Dredge Material at Piney Island, MCAS Cherry Point, NC The Industry Day Meeting is for a potential beneficial use project at Piney Island located in Carteret County, NC. The project work would be included as an Option in the next planned AIWW Maintenance Dredging Contract, which will be solicited sometime in late Spring / early Summer 2027.Project Description: The Piney Island Beneficial Use of Dredged Material project involves placing approximately 8,000 cubic yards of dredged material across 9.3 acres of degraded brackish marsh at the northern tip of Piney Island, targeting a final elevation of 1.15 feet NAVD88 (plus or minus 0.25 feet, capped at 1.4 feet NAVD88). Two sediment sources within the Wilmington Districts navigation maintenance program are under consideration, including the Atlantic Intracoastal Waterway (AIWW), specifically Core Creek reaches, and Wainwright Slough, a shallow draft navigation channel in the vicinity of the project. The placement site is roughly 12 to 15 miles from the potential dredging areas, and all sites are located in northern areas of Carteret County, NC (see attached overview map). The project work is proposed to be included in the next planned Wilmington District Atlantic Intracoastal Waterway maintenance dredging contract, which will be solicited in late Spring / early Summer 2027.The Industry Day Meeting will be held on 7 October 2026 at 1:00 PM EST via Teams. In addition, breakout sessions will be provided with individual contractors following the group industry day meeting. Please indicate with your RSVP if you would like to request a breakout meeting. Please RSVP no later than 3PM ET 2 October 2026 to both Jenifer Garland and Sonny Smith at jenifer.m.garland@usace.army.mil and sonny.z.smith@usace.army.mil if you plan to attend the Industry Day and/or request a breakout session. A Teams calendar invite will be sent out to all RSVP.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The U.S. Army Corps of Engineers Honolulu District is soliciting sealed bids for the Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project in Oahu, Hawaii. This firm-fixed-price contract, with an estimated value between 1 million and 5 million dollars, involves three primary components: mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site, and the repair of the revetted mole, which includes clearing, grubbing, and stone rework. The project must be completed within 200 calendar days from the receipt of the Notice to Proceed. The solicitation is set aside for HUBZone Small Businesses, who receive a 10 percent price evaluation preference. Bidders must provide performance and payment bonds and a bid guarantee. Technical requirements include the use of a third-party qualified surveyor for pre- and post-dredge multi-beam hydrographic surveys to verify depth and volume. Key personnel requirements include a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Bids must be submitted in sealed envelopes to the USACE Honolulu District by the deadline, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 2 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237990
New
Federal
Gunnison Ranger District Soap Creek Stream Repairs
Solicitation # 1240LT26Q0171
Solicitation 1240LT26Q0171 is a request for quotations for the Soap Creek West Bank Repair project within the Gunnison Ranger District of the Gunnison National Forests in Colorado. This firm fixed price acquisition is a total small business set-aside under NAICS code 237990, with a size standard of 45 million dollars. The project involves repairing approximately 200 feet of the west bank of Soap Creek adjacent to sites 11 and 12 in the Soap Creek Campground. Key technical requirements include hardening the banks with imported riprap, installing one rock stream barb and five root wads, constructing three rockery steps for pedestrian access, and planting locally sourced willow plugs and cuttings. All work must adhere to NRCS Stream Restoration and Design Field Guide and USDA National Engineering Handbook standards. The period of performance is scheduled from September 30, 2026, through September 29, 2027, with a delivery timeline of 120 days after the notice to proceed. Award will be based on the best value to the government, considering price and other factors. Offerors must submit a quote of no more than three pages, a construction schedule, and a priced Schedule of Items via email to the contract specialist by September 17, 2026. Required submissions also include a resume for the onsite supervisor and a completed SF-1442. The contract is subject to the Davis-Bacon Act for prevailing wages and requires payment protections, such as payment bonds or an irrevocable letter of credit for 100 percent of the contract price, to be submitted within 10 days of award.
Csa Intermountain 8 Usda-Fs

POSTED

about 6 hours ago

DEADLINE

in 2 days
View Details
NAICS: 237990
New
SLED
Request for Qualifications for Construction Services: Gunner's Lake Local Park Renovation
Solicitation # P47-111
The Maryland-National Capital Park and Planning Commission, through the Montgomery County Department of Parks, is seeking qualified contractors for the renovation of Gunner's Lake Local Park in Germantown, Maryland. This solicitation, identified as P47-111, is the first phase of a two-step procurement process designed to pre-qualify firms for subsequent Invitations for Bids. The comprehensive scope of work includes site preparation, demolition, tree preservation, and the installation of a new playground, picnic pavilion, relocated soccer fields, and additional stormwater management facilities. Other key improvements involve modifying the existing parking lot to relocate ADA parking spaces, installing two new pedestrian entrances with concrete stairways, and creating a loop path featuring benches and an adult fitness area. Proposals must be submitted electronically via OpenGov Procurement by October 14, 2026. Evaluation is based on a technical score of 100 points, with a minimum threshold of 70 points required to be eligible for the second phase. Qualified firms must provide a Quality Control Plan Synopsis and demonstrate that their proposed Field Superintendent has at least five years of experience in site management and OSHA regulations. While no monetary award is made during this qualification phase, future contracts exceeding 100,000 dollars will require performance and payment bonds at 100 percent of the contract amount. Payment terms are set at 30 days following the approval of a proper invoice, with final payment due 90 days after final acceptance of the work.
Montgomery County Parks

POSTED

about 21 hours ago

DEADLINE

in 28 days
View Details

More opportunities from Department Of Defense → W074 Endist Wilmington

Same awarding agency

NAICS: 237990
New
Federal
Philpott Anchors and Instrumentation Construction
Solicitation # W912PM26RA04
Solicitation W912PM26RA004 is a Firm Fixed Price contract for the Philpott Dam Anchors and Instrumentation Construction project located in Philpott, Virginia. Managed by the U.S. Army Corps of Engineers Wilmington District, the project has an estimated construction magnitude between $5,000,000 and $10,000,000. The scope of work involves the installation of spillway anchors, including drilling and grouting, and the provision of labor, equipment, and materials for the installation and maintenance of performance monitoring instrumentation. Key technical requirements include ensuring initial lift-off readings for anchors are within 2 percent of the specified Lock-off Load and adhering to EM 1110-2-1908 standards for instrumentation. The contractor must provide a Quality Control Manager with a valid Virginia PE registration and ensure all materials comply with the Buy American Act. The contract will be awarded based on best overall value, with Technical Approach and Key Personnel being the most critical factors, followed by Past Performance and the Small Business Participation Plan, while Price is the least important factor. Proposals must be submitted electronically in two distinct volumes: Price and Administrative, and Technical and Past Performance. The final proposal deadline was extended via Amendment 0006 to October 9, 2026. Performance is expected to begin within 10 calendar days of the notice to proceed, with an extended period of performance of 640 days. Mandatory requirements include the submission of bid, performance, and payment bonds, as well as compliance with prevailing wage rates per the Davis-Bacon Act.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS