Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM ET

Register Free →

Transformer Field Installation and Commissioning

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Documents

This scope was carved out of 27-005.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

WRRF West Substation Transformer Repair

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → Public Works
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs final physical installation and startup for prime contractors on City of Hayward Public Works projects. Executes field connection, functional testing of gauges and controls, phase rotation, and no-load energization. Conducts dissolved gas testing 30 days post-service. Requires California C-10 Electrical Contractor license. Delivers operational transformer and final test data.

Similar Contracts

Same NAICS industry code

More opportunities from California → Public Works

Same awarding agency

NAICS: 541330
New
SLED
Rancho Cordova Complete Streets Implementation Guide
Solicitation # 80093-RFP-001
The City of Rancho Cordova, through its Public Works Department, is soliciting proposals for the development of a Complete Streets Implementation Guide. Funded by a Caltrans Sustainable Transportation Planning Grant, this project aims to consolidate fragmented design standards and policies into a single foundational reference document. The guide will focus on balancing the mobility and access needs of pedestrians, cyclists, transit users, drivers, and freight operators to create a safe, multi-modal, and climate-resilient transportation network. The scope of work includes an existing conditions report, an inventory of transportation facilities, a peer city review, and the final implementation guide featuring street typologies, cross-sections, and conceptual designs up to 30 percent. Final plans, specifications, and environmental documents are specifically excluded. The available budget for this contract is 400,000 dollars, and all work must be completed by April 2029 to meet grant expiration requirements. The selected consultant will execute a Professional Services Agreement governed by California law, requiring compliance with the Americans with Disabilities Act, Title VI of the Civil Rights Act, and WCAG 2.1 Level AA standards for digital deliverables. Proposals must be submitted via an upload portal with cost information kept in a separate file to ensure a blind initial evaluation. Evaluation will consider the base scope and any proposed added value, while the contract mandates strict adherence to DBE commitments and specific insurance ratings of at least A:VII.
Engineering Services

POSTED

3 days ago

DEADLINE

in about 1 month
View Details
NAICS: 541330
New
SLED
RFP for Professional Consulting Services for the Pavement Management Program Update 2027
Solicitation # 2026-05
The City of Tustin is seeking a professional consultant to update its Pavement Management Program to ensure eligibility for 2027 M2 funding. The scope of work includes updating the pavement inventory, conducting ASTM D6433-compliant condition surveys, and utilizing StreetSaver software to forecast PCI values and develop a seven-year maintenance and rehabilitation plan. All deliverables must adhere to the April 2026 Countywide Pavement Management Plan Guidelines and Orange County Transportation Authority standards. The selected consultant will be responsible for the accuracy of all inspections and must implement a quality assurance process that includes independent reinspection of at least five percent of pavement sections. This solicitation, numbered 2026-05, utilizes a Qualifications Based Selection process with a maximum contract obligation of 115,000 dollars. Proposals are evaluated on a 100-point scale focusing on technical approach, personnel qualifications, firm experience, and reference checks. Required submission documents include a main proposal limited to 15 pages, a separate fee proposal, and a notarized Non-Collusion Affidavit. The successful firm must maintain general, auto, and professional liability insurance with limits of 2,000,000 dollars per occurrence or claim. Performance begins with a project kickoff and the submission of a detailed schedule within two weeks of the Notice to Proceed.
Engineering Services

POSTED

3 days ago

DEADLINE

in 1 day
View Details
NAICS: 811310
New
SLED
WRRF West Substation Transformer Repair
Solicitation # 27-005
The City of Hayward Public Works department is soliciting all-inclusive quotes for the complete repair of the West Substation transformer at the Water Resources Recovery Facility located at 3700 Enterprise Avenue, Hayward, CA. The existing Square D Schneider Electric unit is in poor condition and requires new windings, new insulation, 466 gallons of new FR3 fluid, and a light-gray paint finish to return to full service. The project must be completed within 20 weeks of the agreement or purchase order issuance. The successful contractor is responsible for all removal, transportation, repair, delivery, installation, and startup activities, ensuring the completed transformer impedance is 5.67 percent. Qualified bidders must hold a valid California C-10 Electrical Contractor license and demonstrate at least five years of experience in repairing liquid-filled power transformers of similar specifications. Proposals must include a detailed work plan, a quality-control plan, three references from the last five years, and proof of a City of Hayward business license. Evaluation factors include the capabilities of the repair facility to handle a transformer of approximately 11/32 pound tons, the experience of key personnel, and the quality of testing equipment. Mandatory submissions include a noncollusion affidavit, a nondiscriminatory employment practices certification, and an affirmation of non-involvement in the production of nuclear weapons. Electronic proposals are due by October 28, 2026, at 12:00pm.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

3 days ago

DEADLINE

in 16 days
View Details
NAICS: 811310
New
SLED
Fire Extinguisher Inspection, Maintenance, Testing, Repair, Replacement and Related
Solicitation # 26-266
The City of Milpitas is soliciting bids for a five-year unit price contract to provide comprehensive inspection, maintenance, testing, repair, recharging, and replacement services for approximately 485 portable fire extinguishers. The scope of work covers 17 City service locations, including City facilities, fleet vehicles, and Fire vehicles, encompassing various extinguisher types such as Dry Chemical, Carbon Dioxide, Halon, Water, and Wet Chemical Kitchen Class K. The selected contractor must provide all necessary labor, materials, and equipment, ensuring compliance with the California Code of Regulations Title 19, California State Fire Marshal requirements, and manufacturer instructions. Key performance requirements include a four-business-hour response time for emergency requests and a 24-business-hour response for routine requests. To qualify, contractors must possess a valid California State Fire Marshal Portable Fire Extinguisher Concern License, and all performing personnel must hold the appropriate CSFM Certificates of Registration. Additionally, contractors must maintain valid California Department of Industrial Relations registration and adhere to applicable prevailing wage requirements. The contract will be awarded to the lowest responsive and responsible bidder based on the total base bid, with a ten percent preference given to suppliers of recycled products. Bidders must submit all required documentation, including non-collusion and non-discriminatory employment certifications, via the OpenGov portal by November 10, 2026. Payment terms are Net 30 days, with invoices submitted electronically to the City's Accounts Payable portal.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

6 days ago

DEADLINE

in 29 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS