Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Department Of The Interior was posted on May 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Underground Fiber Optic Cable Installation

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
Kittrell Job Corps Center-12 Strand Fiber Optic Replacement- Bldg 2, Bldg 3, Bldg 4
Solicitation # kittrell-job-corps-center-12-strand-fiber-optic-replacement-bldg-2-bldg-3-bldg-4
Covenant Learning Solutions, operator of the Kittrell Job Corps Center in North Carolina, is soliciting sealed bids for the replacement of 12-strand aerial fiber optic cables and associated connectors between Buildings 2, 3, and 4. The contractor is responsible for providing all labor, materials, equipment, and supervision to install outdoor-rated fiber optic cable along existing aerial pathways and terminate them into existing network switches. A critical requirement of this project is that the existing network service must remain fully operational without interruption until the owner authorizes the final switch-over. The contractor must also provide a construction timeline for approval during a pre-construction meeting and adhere to standard work hours of 8:00 AM to 3:00 PM, Monday through Friday. The project requires strict adherence to industry standards, local codes, and manufacturer specifications regarding cable support and bend radius. Acceptance is contingent upon successful Optical Loss Testing, OTDR testing, continuity testing, and polarity verification, as well as the submission of a complete closeout package with as-built documentation. Bidders must hold a valid North Carolina General Contractor license and maintain all necessary Builder's Risk and Liability insurance. Proposals must be submitted via email to Rachelle Judkins by September 30, 2026, and must include a completed Mandatory Bid Document. Payment will be issued as a single lump sum upon project completion, provided all required purchasing documentation is submitted.
Covenant Learning Solutions operator of Kittrell Job Corps Center

POSTED

about 12 hours ago

DEADLINE

in 18 days
NAICS: 237130
New
SLED
FTTP-PHASE 4 -IFB 16
Solicitation # IFB 16
Shrewsbury Electric and Cable Operations (SELCO) is soliciting bids for the Fiber to the Premises (FTTP) Network Upgrade Phase 4 in Shrewsbury, Massachusetts. The project involves the installation of approximately 15 miles of single-mode aerial and underground fiber optic cable, including signal transmission laterals from the existing backbone ring to splitter cabinets and distribution laterals to public right-of-way access points. The scope of work encompasses fiber optic cable installation, splicing, and bi-directional testing, with specific technical requirements for fiber characterization and reporting using EXFO devices. The contract will be awarded to the lowest responsible and eligible bidder, requiring a 5% bid deposit and a payment bond for 100% of the total contract price. The project follows a strict performance timeline, with mobilization occurring within two weeks of the executed contract and full completion, including all deliverables and punch list items, required within 30 weeks. Compliance requirements include adherence to Massachusetts Prevailing Wage Laws, OSHA safety regulations, and the Massachusetts Anti-Discrimination Statute. Contractors must provide detailed close-out documentation, including as-built drawings and testing results, to receive final payment, as SELCO will withhold 25% of the total contract value until a final audit is completed. Bids are due by September 29, 2026, and must be submitted in sealed envelopes to the Town Manager's Office at Shrewsbury Town Hall.
SELCO1 - SELCO

POSTED

about 23 hours ago

DEADLINE

in 17 days

AI Contract Overview

Show more

The contract involves the installation of underground fiber optic cable within Yellowstone National Park, utilizing trenching methods to lay conduit, pull cable, perform splicing, and complete burial in strict adherence to National Park Service Right-of-Way and environmental standards. All work must be conducted with minimal disruption to natural resources and protected areas, ensuring compliance with federal conservation guidelines and park-specific regulations. The scope encompasses full lifecycle execution from excavation to final burial, with an emphasis on long-term durability and environmental integrity. The subcontract is posted under NAICS code 237130, indicating telecommunications infrastructure construction, and is managed by the Department of the Interior through the Imr Northern ROCKIES office. Responses are due by June 1, 2026, at 9:00 PM Eastern Time, with performance localized solely to Yellowstone National Park, ZIP code 82190. No set-aside preferences are designated, and the contract is structured as a subcontract, implying it may be issued by a prime contractor or managing entity rather than directly by the federal agency. All parties must be prepared to meet rigorous environmental and operational compliance requirements in one of the nation’s most sensitive and protected landscapes.

General Info

Install underground fiber optic cable in Yellowstone, following environmental and National Park Service standards.

Agency

Department Of The Interior → Imr Northern ROCKIES(12200)View Agency

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

Yellowstone National Park, WY, 82190, USA

Set-Aside

NONE

Documents

This scope was carved out of 140P1426R0014.

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

60--Yellowstone National Park - Fiber Broadband to Gra

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Imr Northern ROCKIES(12200)
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Interior → Imr Northern ROCKIES(12200)
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Install underground fiber optic cable using trenching methods, including conduit placement, cable pulling, splicing, and burial in compliance with NPS Right-of-Way and environmental standards.

More opportunities from Department Of The Interior → Imr Northern ROCKIES(12200)

Same awarding agency

NAICS: 561210
New
Federal
H--GRTE FIRE EXTINGUISHER INSPECTIONS
Solicitation # 140P1426Q0098
Solicitation 140P1426Q0098 is a total small business set-aside for annual park-wide fire extinguisher inspections and maintenance at Grand Teton National Park. The contract is a time and materials agreement with a ceiling price, consisting of a base year and two option periods from September 1, 2026, through September 30, 2028. The scope of work involves the inspection, testing, and maintenance of approximately 677 government-owned portable fire extinguishers across various park locations, including Moose, Beaver Creek, Highlands, and Lupine Meadows. Required services include annual inspections, hydrostatic testing, six-year and twelve-year internal maintenance, and the disposal of non-serviceable units in accordance with NFPA 10, OSHA, and DOT standards. Award will be made under FAR Part 12 to the offeror providing the lowest price that meets technical specifications and prior experience requirements, which include providing three examples of projects of similar size and scope. Contractors must maintain active SAM registration and a Unique Entity Identifier to be eligible. Deliverables include itemized service lists, testing documentation, and compliance records submitted electronically. Payment is processed through the Invoice Processing Platform (IPP), and labor standards are governed by Wage Determination 2015-5409 for Teton County, Wyoming. The final response deadline was extended via Amendment 0003 to September 15, 2026.
Facilities Support Services

POSTED

4 days ago

DEADLINE

in 4 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS