This Combined Synopsis/Solicitation opportunity from Department Of Homeland Security was posted on April 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

USCGC Alex Haley Asbestos Abatement

Closed
70z08526Q0024598Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336611
New
Federal
Fuel Injection Pump Overhaul
Solicitation # N5005427Q0016
Solicitation N5005427Q0016 is a combined synopsis and solicitation for the overhaul of 32 LPD-17 class MPDE Fuel Injection Pumps for the USS San Antonio. The Department of Defense, through the Mid Atlantic Regional Maintenance Center in Norfolk, Virginia, intends to award this contract on a sole source basis to Fairbanks Morse under the authority of FAR 13.106-1(b)(1)(i). The work must be performed at the OEM facility in accordance with OEM procedures and the MPDE maintenance handbook, including joint inspections of disassembled components and a final receipt inspection upon return to the SIMA Diesel shop. The period of performance is scheduled from November 9, 2026, to November 30, 2026, with delivery to MARMC in Norfolk, Virginia. This procurement is conducted using Simplified Acquisition Procedures for commercial items under FAR Part 13 and FAR 12.6. Interested parties must be registered in the System for Award Management and submit quotes via email to the primary point of contact by November 2, 2026. Required quote elements include pricing, business size, payment terms, and a demonstration of technical capability to meet all specifications. The contract incorporates various federal and defense clauses, including Buy American certifications, cybersecurity requirements under DFARS 252.204-7012, and FOB Destination shipping terms.
Mid Atlantic Reg Maintenance Ctr

POSTED

about 5 hours ago

DEADLINE

in 5 days
NAICS: 336611
New
Federal
U.S. NAVY VESSEL VOYAGE REPAIR AVAILABILITY (VRA)
Solicitation # N6817127QN004
The U.S. Navy, through the Navsup Fleet Logistics Center Naples, is soliciting a Firm-Fixed-Price contract for a Vessel Voyage Repair Availability (VRA) for the USS Mt Whitney (LCC 20). The work will be performed in Gaeta, Italy, with a period of performance from December 1, 2026, through December 15, 2026. The scope of work includes 10 Category A work items and 3 Not Separately Priced (NSP) items, featuring tasks such as barometer calibration, steel repairs, fire room drain piping repairs, LPAC hose hydrostatic testing, and insulation repairs. The contractor must adhere to strict technical standards, including MIL-STD-869 for thermal insulation, ANSI and ISO requirements for calibration, and US Coast Guard and COLREGS Navigation regulations. Award will be based on the Lowest Price Technically Acceptable (LPTA) basis. To be considered, quoters must be rated acceptable regarding their technical capability, which requires providing proof of ISO 9001 or 14001 Quality Management Systems, ABS welding certifications, and laboratory qualifications for calibration. The contract emphasizes rigorous safety and environmental compliance, requiring certified Marine Chemists for gas-freeing and strict adherence to international and local regulations for the handling and disposal of hazardous materials. Invoicing must be processed electronically via Wide Area Work Flow (WAWF). Quotes are due by November 2, 2026, and must include completed Standard Forms 18 and 30, along with specific representations and certifications regarding tax status and defense telecommunications equipment.
Navsup Flc Sigonella Naples Office

POSTED

about 5 hours ago

DEADLINE

in 5 days
NAICS: 336611
New
SLED
F&W, 2018 Munson Packman Boat Repower project
Solicitation # 2018 Munson Packman Boat Repower
The Confederated Tribes of the Colville Reservation Fish and Wildlife Department is soliciting proposals for a comprehensive propulsion repower and helm system integration for a 30 foot Munson Packman landing craft. The project requires a factory-certified Honda Marine Authorized Dealer to decommission and remove two existing Honda BF250A outboard engines and replace them with new Honda BF250D Drive-by-Wire outboards. The scope of work is divided into six phases, encompassing the removal of legacy rigging, a structural assessment of the transom, installation of new engines and Honda iST electronic control heads at dual helm stations, integration with the existing SeaStar PA1315-2 Power Assist steering and NMEA 2000 network, and a complete fuel system overhaul using USCG Type A1-15 lines. The project concludes with static diagnostics and a minimum two-hour sea trial to validate performance and safety protocols. The selected contractor must provide a secure facility for vessel storage and adhere to strict insurance requirements, including at least 1 million dollars in commercial general liability and business auto liability. Financial protections include a 25 percent retainage or a performance bond, with a bond being mandatory for contracts exceeding 100,000 dollars. Proposals are due by November 13, 2026, and will be evaluated based on a 100-point scale considering technical capability and budget, with specific preferences given to responsible Indian Offerors under TERO and tribal preference laws. All disputes are subject to the jurisdiction of the Colville Tribal Court, and payments are contingent upon the availability of tribal funds.
Confederated Tribes of the Colville Reservation

POSTED

about 16 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The contract requires the removal of asbestos-containing pipe insulation from the USCGC Alex Haley (WMEC-282), specifically 5 feet of 2.5-inch steam piping located in the General Issue & Storeroom, Frame 20, at USCG Base Kodiak, Alaska. The work is scheduled for performance between May 1 and May 10, 2026, and is part of a Total Small Business Set-Aside under NAICS code 336611. The contractor must be registered in the Joint Certification Program and provide their JCP number. Abatement must comply with federal regulations including 40 CFR 61.150 and 29 CFR 1915.1001, as well as the Coast Guard’s Safety and Environmental Health Manual and SFLC Standard Specification 0000. The contractor is responsible for establishing negative air pressure containment, using HEPA-filtered equipment, and prohibiting dry sweeping or compressed air. All asbestos waste must be properly packaged, labeled, transported, and disposed of at an authorized facility. Daily coordination with the ship’s Quarterdeck and Officer of the Day is mandatory, with notifications required before and after each workday, and no Coast Guard personnel are permitted in the abated area during active work. Post-abatement clearance requires air sampling results below 0.01 fibers per cubic centimeter, followed by a visual inspection by USCG personnel, with re-cleaning and re-testing at the contractor’s expense if standards are not met. The contractor must submit a Certificate of Completion within three working days and final clearance documentation within five working days, along with waste manifests and disposal records. No government-furnished property is provided, and any discovery of additional asbestos outside the defined scope must be immediately halted and reported via a Condition Found Report (CFR), requiring written contract modification from the Contracting Officer for any additional work. Contractors must provide a site-specific abatement plan, proof of insurance, worker and supervisor certifications, disposal facility credentials, and all necessary permits with their proposal. Full compliance with the REAL ID Act is required for base access, which mandates presentation of a compliant driver’s license and submission of full name, date of birth, and license number; U.S. citizenship is recommended. Coordination must be maintained with designated Technical Points of Contact, and the place of performance is strictly limited to the vessel at its homeport in Kodiak, Alaska.

General Info

Remove 5 feet of asbestos insulation from USCGC Alex Haley in Kodiak, Alaska, May 1–10, 2026, complying with federal safety and disposal regulations.

NAICS

336611 - Ship Building and Repairing

Place of Performance

Kodiak, AK, 99615, USA

Set-Aside

SBA

Documents

1

SOW USCGC Alex Haley asbestos abatement

PDF, High priority: read this firstsow
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Sflc Procurement Branch 2(00085)
Contacts2 people available
OfficeALAMEDA, CA, 94501, USA
Office AddressALAMEDA, CA, 94501, USA

Full Description

Show more


STATEMENT OF WORK


USCGC ALEX HALEY (WMEC-282)


SERVICES FOR ASBESTOS ABATEMENT



  1. Objective. The objective of this Statement of Work (SOW) is to perform abatement on asbestos pipe insulation on United States Coast Guard Cutter (USCGC) Alex Haley. This is a critical health and safety issue for the crew members.


  1. References. For any listed references to be distributed, the contractor must be registered in the Joint Certification Program (JCP) through Defense Logistics Agency (DLA) and provide your JCP number to the listed point of contact for this work.
    1. COMDTINST M5100.47 (series), United States Coast Guard Safety and Environmental Health Manual, Chapter 12 - Asbestos Awareness Program
    2. Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), General Requirements
    3. Coast Guard Drawing 282-WMEC_123_1, Rev -, Sewage Holding Tank Arrangement and Details
    4. Coast Guard Drawing 282-WMEC_601_2, Rev H, Booklet of General Plans
  2. Background. An industrial hygiene sample survey for asbestos was performed in October 2025. Lab results conducted by the United States Navy identified a section of pipe insulation exceeding the authorized threshold (1%) for asbestos-containing material (ACM). This requirement is for a qualified contractor to perform asbestos abatement to remove the identified ACM and leave the affected work area clean and safe in accordance with all federal, state, and local requirements.


  1. Tasks. The contractor shall provide material and labor services that includes the following:
    1. Once the Contractor is approved for services by a warranted Contracting Officer (KO), coordinate work with the USCG Technical Points of Contact (TPOCs).
    2. USCG personnel will operate all shipboard machinery and equipment. USCG personnel will secure and tag applicable shipboard machinery and equipment prior to the start of any work. Observe safety precautions when working with electrical and electronic equipment. Failure to comply exposes personnel to the danger of electrical shock and personal injury.
    3. Pre-Work Meeting. Attend a pre-abatement meeting with the Government to review work plan and procedures, if required. Attend fire and emergency procedures brief provided by cutter personnel before starting work, if required by the Government.
      1. Coordinate with cutter personnel before staging equipment, erecting containment, or routing hoses, cords, ducting, or waste such that watertight doors, hatches, scuttles, ladders, escape routes, firefighting equipment, damage control fittings, or fire-main components are obstructed.
      2. Ensure no containment, barrier, tool, material, or waste container blocks or degrades access through watertight or fire boundaries unless specifically approved by the Government and cutter personnel.
      3. Maintain immediate access to emergency egress routes and required shipboard safety equipment at all times.
      4. Stop work and secure the area as directed by cutter personnel in the event of a shipboard emergency, fire, drill, or casualty response.
    4. The contractor is not required to perform bulk sampling for ACM confirmation. This testing is completed and provided in section 10 of this document.
    5. Establish regulated areas, barriers, warning signs, access controls, containment, and decontamination procedures necessary to prevent the spread of asbestos fibers. Protect adjacent compartments, vessel equipment, shipboard systems, and personnel from contamination or damage during the work.
      1. Maintain the work area as a negative air pressure zone relative to adjacent areas and exhaust air with a suitable HPEA filter. Do not contaminate adjacent non-affected compartments or zones. Use of compressed air, conventional vacuum, and dry sweeping is not permissible, during abatement.
    6. Furnish all labor, tools, materials, PPE, HEPA-filtered equipment, wetting agents, bags, drums, labels, and other supplies necessary to safely perform the abatement.
    7. Remove confirmed asbestos-containing pipe insulation identified in Table 1 using compliant methods and approved asbestos work practices. Collect, package, label, containerize, store, transport, and dispose of asbestos waste in accordance with applicable law. All waste shall be disposed of at an approved facility authorized to receive asbestos-containing waste. Maintain the work area free of visible dust and debris throughout performance of the work.
      1. The contractor must comply with all applicable Federal, state and local laws, and regulations including 40 CFR 61.150 and 29 CFR 1915.1001. Provide all notices to the EPA, as required by 40 CFR 61.145 and other applicable state and local agencies, prior to commencing asbestos removal.
      2. The contractor shall provide written notice to the TPOCs and KO at least 24 hours prior to commencing asbestos abatement work, unless a longer notice period is required by law or local procedure. Additionally, each workday. notify the ship’s Quarterdeck and Officer of the Day (OOD) prior to starting any abatement task, to ensure a timely announcement to Coast Guard personnel to vacate the affected area. Coast Guard personnel are not permitted to be in the location of abated spaces while abatement is being performed. Each workday, notify ship’s Quarterdeck and OOD upon conclusion of abatement tasks.


LOCATION


SYSTEM


DESCRIPTION


General Issue & Storeroom, 4-18-2-A, Frame 20


Steam


2.5-inch piping, length of insulation for removal approx. 5-feet


Table 1



    1. Post-Abatement Clearance. Perform cleaning of the regulated area and all affected adjacent surfaces using asbestos-compliant cleaning methods. Perform steps outlined in SFLC Std Spec 0000 Appendix B, section 2.2.14.5.6.1 to ensure the work area meets the required acceptance criterion of less than 0.01 fibers per cubic centimeter, or stricter governing requirement if applicable. Submit a CFR with results.
      1. USCG personnel will be authorized to enter an abated space or location only after satisfactory aggressive air sample results. Upon satisfactory results, a visual inspection will be completed by designated USCG personnel or TPOCs.
      2. Re-clean and re-test any area that fails visual inspection or clearance criteria at no additional cost to the Government.
    2. Submittal Requirements. The contractor must submit closeout documentation, including waste shipment records, disposal manifests, final clearance documentation, and certificate of completion. If hidden or additional suspect ACM is encountered outside the scope, the contractor shall stop working in that area and notify the Contracting Officer. Submit via CFR.
      1. The certificate of completion manifest must be submitted, signed, and dated within 3 working days after hazardous materials removal work is complete.
      2. The final clearance air monitoring certification must be submitted, signed, and dated within 5 working days after testing.
    3. The contractor shall adhere to the following guidance for contract modifications and changes:
      1. Pricing for any additional travel costs, material, or labor hours will be requested and handled by the KO under the terms of the contract. Any repairs beyond the base scope identified shall be documented in a Condition Found Report (CFR) with a technical description of the recommended work. The CFR shall be provided to the TPOCs and the Contracting Officer.
      2. Any additional work will be authorized only by the KO through a written contract modification. The contractor shall not perform any repairs beyond the base scope until specifically authorized in writing by the KO. If the Government elects to proceed with additional work, the KO will issue a written contract modification that identifies the authorized additional work and associated firm fixed price. The contractor shall base any proposal for additional work on the findings in the CFR.
    4. The contractor shall include the following as part of their contract proposal to the Government’s solicitation.
      1. Site-specific asbestos hazard abatement plan/work plan.
      2. Provide all required permits, notifications, licenses, worker certifications, supervisor certifications, transporter qualifications, disposal facility documentation, proof of insurance for asbestos abatement, and testing laboratory information.


  1. Government Furnished Property. The Government will furnish and provide the following to the contractor under this requirement:
    1. None


  1. Security Requirement. Access to government facilities is required. Contractors shall have a valid government issued ID (or driver’s license) and show identification at the security gate. Contractor must provide full name, date of birth, and driver’s license #. Only REAL ID Act compliant driver’s licenses and ID cards are authorized for base access. For security processing, USCG recommends contractors with U.S. citizenship.


  1. Place of Performance. USCGC Alex Haley at USCG Base Kodiak. Address: Albatross Ave, Kodiak, AK 99615


  1. Period of Performance. 1-May to 10-May 2026


  1. Technical Points of Contact.
    1. USCG-SFLC-LREPL, Asset Manager: LT Mikael Axelsson, contact@example.gov
    2. USCG-SFLC-LREPL, Asset Manager: LTJG Igor Guerrero, contact@example.gov
    3. USCG-SFLC-LREPL, Port Engineer: CWO Carsten Stoeckler, contact@example.gov
    4. USCGC Alex Haley, Engineer Officer: LT Alex Murdoch, contact@example.gov
  2. Notes.
    1. This scope is for asbestos abatement of confirmed asbestos-containing pipe insulation only. Sampling for asbestos confirmation is not required for the identified pipe insulation in this scope. Replacement insulation, painting, lagging restoration, pipe repair, or other restoration work is not included unless specifically added elsewhere in the contract.
    2. List of Enclosures
      1. Enclosure 1: Photos of asbestos-containing pipe insulation locations
      2. Enclosure 2: Ship drawing(s) of compartment
      3. Enclosure 3: Prior asbestos test results

ENCLOSURE 1: Photos of asbestos-containing pipe insulation locations




Figure 1. Wide area view of affected area. Red arrow points to the area of pipe insulation containing asbestos.















Figure 2. Close up of asbestos containing insulation.





ENCLOSURE 2: Ship drawing of compartment







ENCLOSURE 3: Prior asbestos test results



Asbestos survey results, lab ID # 347536



More opportunities from Department Of Homeland Security → Sflc Procurement Branch 2(00085)

Same awarding agency

NAICS: 811210
Federal
TRS-3D /AN/SPS-75 Radar repairs/ overhaul services
Solicitation # 70Z08526RRJ001B00
The United States Coast Guard Surface Forces Logistics Center is soliciting repair and overhaul services for the AN/SPS-75 Air Search Radar System, specifically for the 418-foot Legend-class National Security Cutter fleet. This is a sole-source acquisition awarded to Northern Defense Industries, LLC, as they are the only authorized U.S. service provider for these proprietary OEM parts and technical data. The scope of work includes the disassembly, inspection, testing, repair, preservation, packaging, and marking of various critical components, such as power supplies, circuit card assemblies, and radar set subassemblies. All repairs must adhere to Original Equipment Manufacturer specifications to maintain operational readiness and system warranties. The contract is structured as a requirements contract with fixed-price delivery orders, consisting of a base period and three one-year ordering periods, with an additional six-month extension option. Performance is primarily conducted at the contractor's facilities, with a strict requirement for items to be preserved for at least two years of warehouse storage and packaged according to military standards. Award is based on technical capability and fair and reasonable pricing, with evaluations focusing on resources, quality assurance, and past performance. Administrative requirements include electronic invoicing via the Invoice Processing Platform and the provision of a dedicated Project Manager to serve as the primary point of contact.
Electronic and Precision Equipment Repair and Maintenance

POSTED

2 months ago

DEADLINE

in about 1 month
View Details
NAICS: 333995
Federal
APPLETON CYLINDER
Solicitation # 70Z08526Q40200B00
Solicitation 70Z08526Q40200B00 is a combined synopsis and request for quote issued by the U.S. Coast Guard Surface Forces Logistics Center for the procurement of specific brand name components from Appleton Marine Inc. This is a Brand Name Only solicitation with no substitutions authorized; therefore, interested vendors must be authorized distributors and provide an authorized distributor letter from the Original Equipment Manufacturer with their quotation. The requirement is a total small business set-aside under NAICS code 333995 and will result in a firm-fixed-price purchase order. The procurement consists of three line items: three Jib Cylinders (NSN 3040 01-F12-2745), four Luff Cylinders (NSN 3040 01-F12-2743), and ten Sheaves (NSN 3020 01-F12-2750). Strict packaging and marking standards apply, including MIL-STD-2073-1E Method 10 for cylinders and ASTM D5118 fiberboard boxes for sheaves, with all items requiring marking per MIL-STD-129R and barcoding per ISO/IEC-16388-2007. Delivery is required by September 30, 2026, to the USCG Surface Forces Logistics Center in Baltimore, Maryland, with shipping terms set as FOB Destination. Offers will be evaluated based on price and the ability to meet the brand name and authorized distributor requirements. Successful contractors must submit invoices through the Invoice Processing Platform with payment terms of Net 30. All submissions must include the vendor's Unique Entity Identifier and CAGE code, and offerors must maintain current representations and certifications in the System for Award Management.
Fluid Power Cylinder and Actuator Manufacturing

POSTED

3 months ago

DEADLINE

in 9 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS