Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Homeland Security was posted on May 22, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

USCGC KIBALL VENT FAN REPAIRS

Closed
70Z08524P0004964Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336611
New
Federal
COLUMBIA Class Tailcone Manufacture
Solicitation # N0016726R1005
The Naval Surface Warfare Center Carderock Division is soliciting proposals for the manufacture and acquisition of COLUMBIA Class submarine propulsor tailcones. The scope of work involves the procurement of materials, machining, assembly, painting, and delivery of up to eight tailcone kits, with a minimum of one kit required in the first year and options for seven additional kits. The contract also includes requirements for engineering support services, such as design reviews and the development of a manufacturing plan and final certification package. This is a DPAS rated DX-A3 order utilizing a combination of Fixed Price Incentive Firm Target for hardware, Cost Plus Fixed Fee for engineering services, and Cost No Fee for data requirements. Award will be determined via a best value tradeoff process evaluating technical capability, cost proposal, past performance, and small business participation, with technical capability being the most significant factor. Proposals must be submitted electronically through the PIEE Solicitation Module and organized into five distinct volumes. Key deliverables include a variety of Contract Data Requirements List items, such as monthly status reports, performance and cost reports, and conference minutes. The contract mandates strict adherence to security protocols for classified and unclassified data, compliance with ISO 9001:2008 or AS9100 quality standards, and the use of the Wide Area WorkFlow system for invoicing.
Nswc Carderock

POSTED

about 5 hours ago

DEADLINE

in 3 months
NAICS: 336611
New
SLED
F&W, 2018 Munson Packman Boat Repower project
Solicitation # 2018 Munson Packman Boat Repower
The Confederated Tribes of the Colville Reservation Fish and Wildlife Department is seeking a factory-certified marine contractor to perform a complete propulsion repower and helm system integration on a 30 foot Munson Packman landing craft. The project involves the decommissioning and removal of two existing Honda BF250A outboard engines and legacy iST components, followed by the installation of two new Honda BF250D Drive-by-Wire outboards. The scope of work includes comprehensive digital rigging, the installation of new Honda iST electronic control heads at dual helm stations, integration with the existing NMEA 2000 backbone and SeaStar Power Assist steering system, and a full fuel system overhaul using USCG Type A1-15 lines. The project concludes with factory diagnostic checks and a minimum two hour sea trial to validate performance and safety protocols. To ensure quality and warranty coverage, the contractor must be an authorized Honda Marine Dealer or Service Center and employ technicians with at least five years of experience with commercial aluminum vessels and complex marine networks. Proposals must be submitted as a PDF by November 13, 2026, and must provide a firm-fixed price. Award selection is based on a 100 point evaluation criteria, with a preference for responsible Indian Offerors. The contract requires the contractor to maintain significant insurance coverages, including 1 million dollars per occurrence in general liability, and mandates a 25 percent retainage or a performance bond for contracts exceeding 100,000 dollars. All disputes are subject to the jurisdiction of the Colville Tribal Court and tribal law, and contractors must comply with the Colville Tribal Employment Rights Ordinance.
Confederated Tribes of the Colville Reservation

POSTED

about 16 hours ago

DEADLINE

in 15 days
NAICS: 336611
New
DIBBS
TRAINING SET, FIRE FIGH
Solicitation # SPE8E6-27-T-0421
Solicitation SPE8E6-27-T-0421 is a fixed-price procurement by the Defense Logistics Agency for 39 kits of Fire Fighting and Damage Control training sets, identified by NSN 6930-01-585-8179. The contract is designated as a Service-Disabled Veteran-Owned Small Business Set-Aside, though some sections of the documentation contain conflicting notes regarding small business status. Key delivery requirements include a 76-day delivery window after award, with a need ship date of October 9, 2026, and an original required delivery date of March 30, 2027. Shipping is FOB Origin, with the destination being the DLA Distribution DDSP New Cumberland Facility in Pennsylvania. The contractor must adhere to strict packaging and marking standards, specifically MIL-STD-2073-1E for packaging and MIL-STD-129 for marking. Palletization must comply with DLA requirement RP001. Special material restrictions are in place, prohibiting the intentional addition of mercury or mercury-containing compounds, except where functionally required and specified by NAVSEA. The contract incorporates various federal regulations, including the Buy American and Balance of Payments Program, safeguarding of covered defense information, and hazardous material labeling per 29 CFR 1910.1200. Inspection and acceptance will occur at the destination, and all invoicing must be processed electronically through the Wide Area WorkFlow system.
DDSP NEW CUMBERLAND FACILITY

POSTED

about 24 hours ago

DEADLINE

in 11 days
NAICS: 336611
New
DIBBS
LAMINATED CONDUCTO
Solicitation # SPE7M2-27-T-0463
Solicitation SPE7M2-27-T-0463 is a small business set-aside issued by the DLA Weapons Support Nuclear Reactor Program for the procurement of 13 units of Laminated Conducto, identified by NSN 6145-01-524-6075. The requirement is classified under NAICS code 336611. Key delivery milestones include a need ship date of April 26, 2027, and an original required delivery date of January 5, 2028, with a delivery lead time of 167 days after receipt of order. Shipping is designated as FOB Origin, with the destination for both inspection and acceptance being the DLA Distribution DDSP New Cumberland Facility in Pennsylvania. The contract mandates strict adherence to technical and quality requirements found in the DLA Master List, specifically referencing RA001, RC001, RP001, and RQ011. Packaging and marking must comply with MIL-STD-2073-1E and MIL-STD-129, while palletization must follow RP001. A critical environmental restriction prohibits the intentional addition of mercury or mercury-containing compounds to the hardware, except for specific functional exceptions. Administrative requirements include the use of the Wide Area WorkFlow system for electronic invoicing and payment. The solicitation incorporates various FAR and DFARS clauses covering cybersecurity, the Buy American Act, and the prohibition of covered defense telecommunications equipment.
DLA WEAPONS SUPPORT NUCLEAR REACTOR PROGRAM

POSTED

about 24 hours ago

DEADLINE

in 11 days

General Info

NAICS

336611 - Ship Building and Repairing

Place of Performance

Honolulu, HI, 96819, USA

Set-Aside

NONE

Documents

1

Vaneaxial Fan Renewal - Cutter 418

DOC, High priority: read this first4 pages · sow
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Sflc Procurement Branch 2(00085)
Contacts2 people available
OfficeALAMEDA, CA, 94501, USA

Full Description

Show more
ITEM 1: Vaneaxial Fan, Renew 1. SCO 1.1 Intent. This work item describes the requirements for the Contractor to renew vaneaxial fan listed in the Table 1 with GFP on the Cutter. TABLE 1 - vaneaxail fan RENEW SYSTEM / FAN NUMBER model number LOCATION dimension / WEIGHTS coast guard DRAWING SS-53 / 2-26-2 XA11A4W5 Fan Space 2-26-2-Q 40 Inches X 36 Dia/ 934 Lbs. 750-WSML-512-019 1.2 Government-furnished property. MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED COST ($/UNIT) Y Fan Vaneaxial, 12.5 HP, 1800/1200 RPM, 440 Volt / 3 Phase 60 Hz 015614145/ XA11A4W5 1 ea. 24030.00 2. REFERENCES Coast Guard Drawings Coast Guard Drawing 418A-WMSL-100-001, Rev B, General Arrangements Coast Guard Drawing 418A-WMSL-801-001, Rev A, Booklet of General Plans Coast Guard Drawing 750-WMSL-512-001, Rev E, HVAC System Diagram Coast Guard Drawing 750-WMSL-512-014, Rev B, Vent & Air Cond Arr 2nd Dk Unit 1330 (ASC512017) (UNSIGNED) Coast Guard Drawing 750-WMSL-512-053, Rev A, HVAC Equipment List (ASC512001H) Coast Guard Publications Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2020, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2020, Requirements for Preservation of Ship Structures Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2020, Shipboard Electrical Cable Test Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2020, Shipboard Electrical Cable Removal, Relocation, Splice, Repair, and Installation Coast Guard Technical Publication (TP) 7148, 24-AUG-07, Standard XA Vaneaxail Fan Other References Code of Federal Regulations (CFR) Title 29, Part 1915, Subpart E, Sep 2015, Scaffolds, Ladders and Other Working Surfaces International Standard Organization (ISO) 2953, 1999, Mechanical Vibration, Balancing Machines, Description and Evaluation 3. REQUIREMENTS 3.1 General. 3.1.1 CIR. None. 3.1.2 Tech Rep. Not Applicable 3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).. 3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following: Electrical wiring Piping Ventilation Duct Work Overhead Lights Van Axial Fan Assembly Foundation 3.1.5 Electrical requirements. The Contractor must accomplish all electrical work in accordance with SFLC Std Spec 3042, and test cables in accordance with SFLC Std Spec 3041. 3.1.6 Work locations. The concerned work area is listed in Table 1. See Coast Guard Drawings and Tech Pub in Section 2 above for guidance, locations, and details. 3.1.7 Scaffolding. The Contractor must, in accordance with CFR Title 29, Part 1915, Subpart E, erect suitable staging or scaffolding, as required, to facilitate work. The Contractor must provide hoists to remove and re-install the vaneaxial fan assembly in Table 1. 3.1.8 Rigging. The Contractor is responsible for rigging of all and necessary tools, materials, including GFP form and to the pier as well as from and to work compartment. When necessary, the Contractor must provide crane service to move materials, tools and GFE to and from pier, deck and work compartment. The Contractor may coordinate with COR if Coast Guard crane is available to rig equipment and tools onto the cutter. NOTE Coast Guard personnel will operate all shipboard machinery and equipment. 3.1.8 Operational test, initial. Prior to commencement of work, the Contractor must witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR. 3.2 Vanaxial fan removal. Vanaxial fan installation is shown on the following Coast Guard Drawings: Coast Guard Drawing 750-WMSLl-512-014 3.2.1 The Contractor must disconnect electric cables to vaneaxial fan in accordance with the SFLC Std Spec 3042. Pull back cables and temporarily insulate cable ends for safety. Record wiring information for later re-connection and submit a CFR. 3.2.2 The Contractor must remove vaneaxial fan from ventilation duct in accordance with Tech Pub 7148. The Contractor must temporary support ventilation duct on each side of removed vaneaxial fan. 3.2.3 The Contractor must remove vaneaxial fan from mounting in accordance with drawings referenced Para 2. 3.2.4 The Contractor must vacuum clean each side of ventilation duct work to a distance of three feet on either side of the vaneaxial fan assembly installation. 3.2.5 The Contractor must inspect vibration mount of vaneaxial fan and submit a CFR. 3.3 Vaneaxail fan renewal. The Contractor must renew vaneaxial fan with GFP using new stainless steel hardware in its original operating condition in accordance with TP 7148 and Coast Guard Drawings listed in the Reference 2. 3.3.1 The Contractor must fabricate new flexible duct assembly in accordance with Coast Guard Drawing 750-WMSL-512-004. 3.3.2 The Contractor must re-mount vaneaxial fan to its original operating condition in accordance with Coast Guard Drawings referenced in Para 2 and TP 7148. 3.3.3 The Contractor must reinstall vaneaxial fan with new Contractor-furnished rubber vibration dampers, gaskets and/or resilient mounts and fasteners as applicable in the ducting. Restore all ventilation ductwork to original configuration as shown on Coast Guard Drawing listed in Reference 2. 3.3.4 The Contractor must re-connect cables to electric motor with previously recorded information in accordance with SFLC std Spec 3042. 3.3.6 The Contractor must test cables in accordance with SFLC Std Spec 3041 and submit CFR. 3.4 Coatings. Prepare and coat the fan casing surfaces in using the system specified for - Machinery, Operating Temperatures Under 200 Degree F, Unmachined Surfaces in SFLC Std Spec 6310, Appendix B (Cutter and Boat Interior Paint Systems). Select finish/top coat color to match existing adjacent surfaces. Submit CFR. 3.5 Verification. Prior to re-energization, a final closeout inspection must be performed in the presence of the Coast Guard Inspector. The contractor must submit a signed completed copy of the inspection checklist to the Coast Guard Inspector for affected by the work. The checklist must contain, at a minimum, the following attributes: Verification that each disturbed electrical connection is tight and properly terminated. Certification that no foreign material was found in the panel sections affected by the work. Certification that all rerouted wiring is properly labeled and that all new/rerouted cables are properly marked. Perform a phase rotation test on each disturbed circuit. Correct any improperly phased wiring and repeat the test. No loose hardware and Nothing lose in the duct work Before energization, Impeller rotates freely Submit a CFR. NOTE Coast Guard personnel will operate all shipboard machinery and equipment. 3.6 Operational test - post repairs. After completion of work, the Contractor must thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR. 3.6.1 Verify the motor runs quietly for an hour and without excessive vibration. 3.6.2 Verify direction of air flow. 3.7 Touch-up preservation. The Contractor must prepare and coat all new and disturbed surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs). 4. NOTES This section is not applicable.

More opportunities from Department Of Homeland Security → Sflc Procurement Branch 2(00085)

Same awarding agency

NAICS: 811210
Federal
TRS-3D /AN/SPS-75 Radar repairs/ overhaul services
Solicitation # 70Z08526RRJ001B00
The United States Coast Guard Surface Forces Logistics Center is soliciting repair and overhaul services for the AN/SPS-75 Air Search Radar System, specifically for the 418-foot Legend-class National Security Cutter fleet. This is a sole-source acquisition awarded to Northern Defense Industries, LLC, as they are the only authorized U.S. service provider for these proprietary OEM parts and technical data. The scope of work includes the disassembly, inspection, testing, repair, preservation, packaging, and marking of various critical components, such as power supplies, circuit card assemblies, and radar set subassemblies. All repairs must adhere to Original Equipment Manufacturer specifications to maintain operational readiness and system warranties. The contract is structured as a requirements contract with fixed-price delivery orders, consisting of a base period and three one-year ordering periods, with an additional six-month extension option. Performance is primarily conducted at the contractor's facilities, with a strict requirement for items to be preserved for at least two years of warehouse storage and packaged according to military standards. Award is based on technical capability and fair and reasonable pricing, with evaluations focusing on resources, quality assurance, and past performance. Administrative requirements include electronic invoicing via the Invoice Processing Platform and the provision of a dedicated Project Manager to serve as the primary point of contact.
Electronic and Precision Equipment Repair and Maintenance

POSTED

2 months ago

DEADLINE

in about 1 month
View Details
NAICS: 333995
Federal
APPLETON CYLINDER
Solicitation # 70Z08526Q40200B00
Solicitation 70Z08526Q40200B00 is a combined synopsis and request for quote issued by the U.S. Coast Guard Surface Forces Logistics Center for the procurement of specific brand name components from Appleton Marine Inc. This is a Brand Name Only solicitation with no substitutions authorized; therefore, interested vendors must be authorized distributors and provide an authorized distributor letter from the Original Equipment Manufacturer with their quotation. The requirement is a total small business set-aside under NAICS code 333995 and will result in a firm-fixed-price purchase order. The procurement consists of three line items: three Jib Cylinders (NSN 3040 01-F12-2745), four Luff Cylinders (NSN 3040 01-F12-2743), and ten Sheaves (NSN 3020 01-F12-2750). Strict packaging and marking standards apply, including MIL-STD-2073-1E Method 10 for cylinders and ASTM D5118 fiberboard boxes for sheaves, with all items requiring marking per MIL-STD-129R and barcoding per ISO/IEC-16388-2007. Delivery is required by September 30, 2026, to the USCG Surface Forces Logistics Center in Baltimore, Maryland, with shipping terms set as FOB Destination. Offers will be evaluated based on price and the ability to meet the brand name and authorized distributor requirements. Successful contractors must submit invoices through the Invoice Processing Platform with payment terms of Net 30. All submissions must include the vendor's Unique Entity Identifier and CAGE code, and offerors must maintain current representations and certifications in the System for Award Management.
Fluid Power Cylinder and Actuator Manufacturing

POSTED

3 months ago

DEADLINE

in 9 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS