USCGC MUNRO GAS TURBINE BLEED AIR HOSE INSULATION
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
USCGC MUNRO requires replacement insulation covers for its Gas Turbine Bleed Air Hose due to damage caused by oily water contamination, which prevents the Main Gas Turbine from operating when external temperatures exceed 40 degrees Fahrenheit. The insulation must be replaced with new, reusable covers designed to restore full mission capability, as the turbine’s current non-operational status severely impacts the vessel’s readiness. The covers must precisely match the dimensions of the existing inner and outer layers—34” by 22” by 2” and 45” by 28” by 2”—and be constructed in compliance with ASTM F683-99, using layered glass fiber felt for thermal protection up to 450 degrees Fahrenheit. The inner surfaces and ends must be enclosed with wire-inserted knitted mesh or fibrous glass cloth, while the outer surface must be covered with fibrous glass cloth and sewn and quilted to ensure uniform thickness, strength, and rigidity. The work must be completed by the contractor at their facility and delivered to USCG Base Alameda in California by July 15, 2026, with performance required between July 1 and July 15, 2026. The contract is a total small business set-aside under NAICS code 336611, with a response deadline of July 1, 2026. The contractor is responsible for supplying all materials, equipment, and services to meet technical and functional requirements. References to Coast Guard drawings 750-WMSL-508-001 Rev C and 750-WMSL-259_023 Rev C are included to guide fabrication, and contacts for procurement and technical inquiries are provided to support smooth execution. The urgency of this task is emphasized due to the operational impact on the vessel’s mission readiness.
General Info
Agency
NAICS
Place of Performance
CA, 94501, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
Mofification 1 to this solicitation was to correct the POP in the attached SOW.
Correct: period of performance for this contract shall be between 01JUL2026 & 15JUL26.
STATEMENT OF WORK (SOW)
FOR
GAS TURBINE BLEED AIR HOSE INSULATION
CGC MUNRO has a need to replace insulation covers on the Gas Turbine Bleed Air Hose. The ship’s Main Gas Turbine is currently non-operational and has an immediate need for new insulation materials as outlined in this Statement of Work (SOW).
1.0 GENERAL
-
- Background
USCGC MUNRO inadvertently soaked the insulation surrounding GTBA-HOSE-1 with an oily water. The hose is for the anti-icing bleed air system located underneath the Main Gas Turbine Module. Inundated insulation causes smoking when the Gas Turbine is operated in external temperatures above 40 degrees; preventing operation of the turbine.
-
- Scope
The scope of this contract is defined by the efforts and tools required to support USCGC MUNRO (WMSL 755). The Contractor shall manufacture new removeable insulation covers to the dimensions and specs provided.
-
- OBJECTIVE
The goal is to return CGC MUNRO to Fully Mission Capable (FMC) status. This is a critical need and shall be completed as soon as possible, in order to minimize negative operational impact to MUNRO’s Operational Commander.
-
- APPLICABLE DOCUMENTS
-
-
- Reference Documents
-
The following documents may be helpful to the Contractor in performing the work described in this document:
Coast Guard Drawing (CGDWG) 750-WMSL-508-001, Rev C, JUNE 2009, Piping And Machinery Insulation Schedule And L/M (ASC508001)
Coast Guard Drawing (CGDWG) 750-WMSL-259_023, Rev C, OCTOBER 2014, Bleed Air Piping & Joint Ident (P1 System) Unit 2210
- SPECIFIC REQUIREMENTS/TASKS
Existing insulation cover dimensions are as follows:
Length
Width
Thickness
Inner Layer
34”
22”
2”
Outer Layer
45”
28”
2”
Fabrication of reusable covers shall comply with ASTM F683-99, PARA 8, PAGE 8. For temperature 450 degrees Fahrenheit and over the covers shall be made up of layers of glass fiber felt to make up the required thickness. The inside and ends shall be wrapped with knitted wire mesh or fibrous glass cloth “wire-inserted”. The outside shall be covered with fibrous glass cloth. Covers shall be sewn and quilted with thread to provide a uniform thickness, strength and ridigity.
3.0 OTHER APPLICABLE CONDITIONS
3.1 Period of Performance
-
The period of performance for this contract shall be between 01JUL2026 & 15JUL26.
3.2 PLACE OF PERFORMANCE
The primary place of performance will be at the contractor’s facility. After completion, contractor will deliver to USCG Base Alameda, 1 Eagle Rd, Alameda CA 94501
4.0 CONTRACTOR FURNISHED PROPERTY
The Contractor shall furnish all materials, equipment, and services necessary to fulfill the requirements of this contract.
5.0 Points of Contact
USCG-SFLC-LREPL, Asset Manager: LTJG Justin Waters, 206-827-5766, justin.l.waters@uscg.mil
6.0 Imagery
Outer Lagging Inner Lagging
