This Combined Synopsis/Solicitation opportunity from Department Of Homeland Security was posted on April 30, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

USCGC STRATTON LOAD BANK

Closed
70Z08524P04543Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336611
New
Federal
COLUMBIA Class Tailcone Manufacture
Solicitation # N0016726R1005
The Naval Surface Warfare Center Carderock Division is soliciting proposals for the manufacture and acquisition of COLUMBIA Class submarine propulsor tailcones. The scope of work involves the procurement of materials, machining, assembly, painting, and delivery of up to eight tailcone kits, with a minimum of one kit required in the first year and options for seven additional kits. The contract also includes requirements for engineering support services, such as design reviews and the development of a manufacturing plan and final certification package. This is a DPAS rated DX-A3 order utilizing a combination of Fixed Price Incentive Firm Target for hardware, Cost Plus Fixed Fee for engineering services, and Cost No Fee for data requirements. Award will be determined via a best value tradeoff process evaluating technical capability, cost proposal, past performance, and small business participation, with technical capability being the most significant factor. Proposals must be submitted electronically through the PIEE Solicitation Module and organized into five distinct volumes. Key deliverables include a variety of Contract Data Requirements List items, such as monthly status reports, performance and cost reports, and conference minutes. The contract mandates strict adherence to security protocols for classified and unclassified data, compliance with ISO 9001:2008 or AS9100 quality standards, and the use of the Wide Area WorkFlow system for invoicing.
Nswc Carderock

POSTED

about 6 hours ago

DEADLINE

in 3 months
NAICS: 336611
New
SLED
F&W, 2018 Munson Packman Boat Repower project
Solicitation # 2018 Munson Packman Boat Repower
The Confederated Tribes of the Colville Reservation Fish and Wildlife Department is seeking a factory-certified marine contractor to perform a complete propulsion repower and helm system integration on a 30 foot Munson Packman landing craft. The project involves the decommissioning and removal of two existing Honda BF250A outboard engines and legacy iST components, followed by the installation of two new Honda BF250D Drive-by-Wire outboards. The scope of work includes comprehensive digital rigging, the installation of new Honda iST electronic control heads at dual helm stations, integration with the existing NMEA 2000 backbone and SeaStar Power Assist steering system, and a full fuel system overhaul using USCG Type A1-15 lines. The project concludes with factory diagnostic checks and a minimum two hour sea trial to validate performance and safety protocols. To ensure quality and warranty coverage, the contractor must be an authorized Honda Marine Dealer or Service Center and employ technicians with at least five years of experience with commercial aluminum vessels and complex marine networks. Proposals must be submitted as a PDF by November 13, 2026, and must provide a firm-fixed price. Award selection is based on a 100 point evaluation criteria, with a preference for responsible Indian Offerors. The contract requires the contractor to maintain significant insurance coverages, including 1 million dollars per occurrence in general liability, and mandates a 25 percent retainage or a performance bond for contracts exceeding 100,000 dollars. All disputes are subject to the jurisdiction of the Colville Tribal Court and tribal law, and contractors must comply with the Colville Tribal Employment Rights Ordinance.
Confederated Tribes of the Colville Reservation

POSTED

about 17 hours ago

DEADLINE

in 15 days
NAICS: 336611
New
DIBBS
TRAINING SET, FIRE FIGH
Solicitation # SPE8E6-27-T-0421
Solicitation SPE8E6-27-T-0421 is a fixed-price procurement by the Defense Logistics Agency for 39 kits of Fire Fighting and Damage Control training sets, identified by NSN 6930-01-585-8179. The contract is designated as a Service-Disabled Veteran-Owned Small Business Set-Aside, though some sections of the documentation contain conflicting notes regarding small business status. Key delivery requirements include a 76-day delivery window after award, with a need ship date of October 9, 2026, and an original required delivery date of March 30, 2027. Shipping is FOB Origin, with the destination being the DLA Distribution DDSP New Cumberland Facility in Pennsylvania. The contractor must adhere to strict packaging and marking standards, specifically MIL-STD-2073-1E for packaging and MIL-STD-129 for marking. Palletization must comply with DLA requirement RP001. Special material restrictions are in place, prohibiting the intentional addition of mercury or mercury-containing compounds, except where functionally required and specified by NAVSEA. The contract incorporates various federal regulations, including the Buy American and Balance of Payments Program, safeguarding of covered defense information, and hazardous material labeling per 29 CFR 1910.1200. Inspection and acceptance will occur at the destination, and all invoicing must be processed electronically through the Wide Area WorkFlow system.
DDSP NEW CUMBERLAND FACILITY

POSTED

1 day ago

DEADLINE

in 11 days
NAICS: 336611
New
DIBBS
LAMINATED CONDUCTO
Solicitation # SPE7M2-27-T-0463
Solicitation SPE7M2-27-T-0463 is a small business set-aside issued by the DLA Weapons Support Nuclear Reactor Program for the procurement of 13 units of Laminated Conducto, identified by NSN 6145-01-524-6075. The requirement is classified under NAICS code 336611. Key delivery milestones include a need ship date of April 26, 2027, and an original required delivery date of January 5, 2028, with a delivery lead time of 167 days after receipt of order. Shipping is designated as FOB Origin, with the destination for both inspection and acceptance being the DLA Distribution DDSP New Cumberland Facility in Pennsylvania. The contract mandates strict adherence to technical and quality requirements found in the DLA Master List, specifically referencing RA001, RC001, RP001, and RQ011. Packaging and marking must comply with MIL-STD-2073-1E and MIL-STD-129, while palletization must follow RP001. A critical environmental restriction prohibits the intentional addition of mercury or mercury-containing compounds to the hardware, except for specific functional exceptions. Administrative requirements include the use of the Wide Area WorkFlow system for electronic invoicing and payment. The solicitation incorporates various FAR and DFARS clauses covering cybersecurity, the Buy American Act, and the prohibition of covered defense telecommunications equipment.
DLA WEAPONS SUPPORT NUCLEAR REACTOR PROGRAM

POSTED

1 day ago

DEADLINE

in 11 days

General Info

NAICS

336611 - Ship Building and Repairing

Place of Performance

Alameda, CA, 94501, USA

Set-Aside

SBA

Documents

1

Ship Service Diesel Generator Load Testing Specification

DOCX, High priority: read this firstsow
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Sflc Procurement Branch 2(00085)
Contacts2 people available
OfficeALAMEDA, CA, 94501, USA

Full Description

Show more
This is a combined synopsis/solicitation for commercial items/services prepared in accordance with the format in FAR Subpart 12.6 as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotations are being requested and a written solicitation will not be issued. This Request for Quotations incorporates provisions and clauses in effect through Federal Acquisition Circular 2005-65 dated January 29, 2013. The NAICS Code is 336611. The small business size standard is 1250. This is a total small business set aside. All responsible sources may submit proposals that will be considered by the agency. The contract will be awarded on a firm-fixed-price basis using simplified acquisition procedures in accordance with FAR Part 13.5. The United States Coast Guard Surface Force Logistics Center has a requirement for the following: The CTR shall provide: 1. SCOPE 1.1 Intent. This work item describes the requirements for the Contractor to perform load testing of designated Ship Service Diesel Generator (i.e., SSDG) listed in Table 1. TABLE 1 - LIST OF SHIP SERVICE GENERATOR EQUIPMENT MANUFACTURER / MODEL NUMBER DESCRIPTION LOCATION / SWITCHBOARD SSDG No.3 Caterpillar 3512B 1360 kW, 450 VAC, 60 Hz, 3 phase, 1800 RPM, 0.8 power factor Diesel Generator Room (2-76-5-E) SS Switchboard No.3 S * LOAD TESTING OF DESIGNATED SSDG WILL BE IDENTIFIED BY COR 1.2 Government-furnished property. None. 2. REFERENCES Coast Guard Drawings Coast Guard Drawing 418A-WMSL-100-001, Rev A, General Arrangements Coast Guard Drawing 750-WMSL-501-002, Rev E, Machinery Arrangements (ASC501001) Coast Guard Publications Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Coast Guard Technical Publication (TP) 7119, Ship Service Diesel Generators - Model 3512B Coast Guard Technical Publication (TP) 7165B, Ship Service Switchboards 1S, 2S, 3S & 1SP Shore Power - Operation, Maintenance & Installation - Volume 1 Coast Guard Technical Publication (TP) 7166B, Ship Service Switchboards 1S, 2S, 3S & 1SP Shore Power - Operation, Maintenance & Installation - Volume 2 & 4 Coast Guard Technical Publication (TP) 7167, Ship Service Switchboards 1S, 2S, 3S & 1SP Shore Power - Operation, Maintenance & Installation - Volume 3 Other References COMDTINST 9077.1 (series) Equipment Lockout-Tags-Plus Instruction MIL-STD-1310, Sep 2009, Shipboard Bonding, Grounding, and Other Techniques for Electromagnetic Compatibility and Safety 3. REQUIREMENTS 3.1 General. 3.1.1 CIR. None. 3.1.2 Tech Rep. None. 3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection). 3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following: Piping Electrical Cables Switchboard Vent Ducting Motor Operated Valves 3.1.5 Background information. SSDG listed in Table 1 will be modified by the Coast Guard for the following task: Bearing Replacement Laser Alignment Pinning and Machine Work 3.1.5.1 After completion of above listed tasks by the Coast Guard, the intent of this Work Item is for the Contractor to perform load testing of designated SSDG listed in Table 1. 3.2 Work location. The concerned work area is listed in Table 1. See the applicable drawings in References in Paragraph 2 for guidance, locations, and details. 3.3 Grounding. The Contractor must bond and ground each cable in accordance with MIL STD-1310. (Note: If the load bank is placed on the Pier, then its frame must be insulated from the concrete. If the load bank is mounted on the flatbed truck, the tires will accomplish the isolation. An equipment ground (#4/0 Awg) conductor must be run from the load bank to the ship hull 3.4 Contractor Furnished Materials (CFM). The Contractor must furnish materials listed in the Table 2 for load testing of the SSDG listed in Table 1. TABLE 2 - CONTRACTOR furnish MATERIALS MATERIALS description SOURCE OF SUPPLY Load Bank 1500 KW, 450 Volt AC, 3 Phase, 60 Hz, Resistive Electrical Equipment's Rental Company Load Bank Cables Approximate length of 300 Feet Cables with ring tongue compression lugs (6 Paralleled #4/0 copper load bank conductors per phase (18 Total x 300 Feet) and one additional length for the equipment grounding conductor or Six LSTSGU-400, Two Cables at each Phase Tony Santiago Murray Benjamin Electric 397 West Ave. Stamford CT 06902 (+1 (555) 000-0000) OR Any Electrical Cable Supplier 3.4.1 The contractor must provide miscellaneous hardware required for electrical installation (i.e. Nylon Stuffing Tubes, Box Connectors, Lugs, Fasteners, Wire Nuts, Tapes, Cable ties & Cable Mounting Brackets, etc) of the electrical equipment. WARNING Complete Red Danger Tags In ACCORDANCE with COMDTINST 9077.1 (series). 3.5 Load testing. The Contractor must provide labor and crane services as necessary for placing load bank at suitable location (i.e., On the pier or the ship). After completion of load bank testing of SSDG, the Contractor must remove all installed equipment and cables used during testing. 3.5.1 Testing plan. The Contractor must submit a plan for load testing of the SSDG in accordance with Caterpillar Publication SEBF9011-26 and TP 7119. Submit the load testing plan no later than one week after the Arrival Conference in a CFR. 3.5.1.1 The plan must cover the following topics at a minimum: - Emergency shutdown procedures - Load bank specification and location - Cable locations for load bank - No-load tests - Loaded tests - Data to be collected during tests - All proposed connections, cable and load bank configurations 3.5.1.2 The Contractor must start testing of the SSDG after COR Approval of submitted Test Plan and official acceptance by the Contract Officer (KO). 3.5.2 After placing load bank at suitable location (i.e., On the pier or the ship) the Contractor must install the cables from the load bank to associated SS Switchboard bus bars (i.e. Back side of SS Switchboard No.1 or No.2S or No.3S). CAUTION THE BACK SIDE OF THE SWITCHBOARD SHOULD BE ROPED OFF AS A PERSONNEL EXCLUSION AREA (APPROXIMATELY 10 FOOT RADIUS FROM ANY VISIBLE LIVE BUS 3.5.2.1 The Contractor must route the cables from designated SSDG to load bank through hatches and passageway. The Contractor must run cables in overheads as much as possible to avoid trip hazards. NOTE Coast Guard personnel will operate all shipboard machinery and equipment. SAFETY At any point in the load test or operational testing period if the need presents itself the engine - Prime mover may be shut down by the Tech rep with communication to the USCG operational Engineer utilizing the local EOS, E stop or shut down from the switch gear. Any of the three options will automatically open the SSDG buss breaker 3.5.3 After warmup of SSDG until coolant temperature reaching 140 Degree F, the Contractor must perform the load testing of designated SSDG listed in Table 1 at following load condition. TABLE 3 - LOAD TESTING LOAD HOURS *No Load 0.5 Hrs 25 % Load 0.5 Hrs 50 % Load 0.5 Hrs 75 % Load 0.5 Hrs 100 % Load 2.0 Hrs No Load 0.5 Hrs * Running no load testing. No load testing will consist of running the engine at idle rpm until the engine coolant temperature reaches 140 deg. F during that warmup time safety testing will be performed for oil psi and temp warning and shut down and coolant temp. warning and shutdown. Shipboard alarm verification will be observed at that time as well. 3.5.3.1 Load bank readings must be taken every 15 minutes of the following parameters: Engine, Coolant temp, oil pressure, battery voltage, boost, intake air temp after the aftercooler, exhaust stack temp left and right bank In addition to the generator load test form a Caterpillar steady state engine performance file shall be recorded on the engine ECM all related available information. Generator information, voltage reading per phase, amperage readings per phase, HZ, bearing and winding temps if installed. Pre and post-test PSSRP shall be saved on the ECM to provide verification of all available diagnostic codes and events. All electronic files and reports must be sent to the COR and distributed through proper channel. 4 Load test documentation. After completion of testing, the Contractor must provide Data Sheet of load testing of SSDG to the Contracting Officer. 4. NOTES This section is not applicable to this work item. RDD/POP: 13-17MAY2024 Delivery address and ATTN to: CGC Stratton 1 Eagle Rd. Alameda, CA, 94501

More opportunities from Department Of Homeland Security → Sflc Procurement Branch 2(00085)

Same awarding agency

NAICS: 811210
Federal
TRS-3D /AN/SPS-75 Radar repairs/ overhaul services
Solicitation # 70Z08526RRJ001B00
The United States Coast Guard Surface Forces Logistics Center is soliciting repair and overhaul services for the AN/SPS-75 Air Search Radar System, specifically for the 418-foot Legend-class National Security Cutter fleet. This is a sole-source acquisition awarded to Northern Defense Industries, LLC, as they are the only authorized U.S. service provider for these proprietary OEM parts and technical data. The scope of work includes the disassembly, inspection, testing, repair, preservation, packaging, and marking of various critical components, such as power supplies, circuit card assemblies, and radar set subassemblies. All repairs must adhere to Original Equipment Manufacturer specifications to maintain operational readiness and system warranties. The contract is structured as a requirements contract with fixed-price delivery orders, consisting of a base period and three one-year ordering periods, with an additional six-month extension option. Performance is primarily conducted at the contractor's facilities, with a strict requirement for items to be preserved for at least two years of warehouse storage and packaged according to military standards. Award is based on technical capability and fair and reasonable pricing, with evaluations focusing on resources, quality assurance, and past performance. Administrative requirements include electronic invoicing via the Invoice Processing Platform and the provision of a dedicated Project Manager to serve as the primary point of contact.
Electronic and Precision Equipment Repair and Maintenance

POSTED

2 months ago

DEADLINE

in about 1 month
View Details
NAICS: 333995
Federal
APPLETON CYLINDER
Solicitation # 70Z08526Q40200B00
Solicitation 70Z08526Q40200B00 is a combined synopsis and request for quote issued by the U.S. Coast Guard Surface Forces Logistics Center for the procurement of specific brand name components from Appleton Marine Inc. This is a Brand Name Only solicitation with no substitutions authorized; therefore, interested vendors must be authorized distributors and provide an authorized distributor letter from the Original Equipment Manufacturer with their quotation. The requirement is a total small business set-aside under NAICS code 333995 and will result in a firm-fixed-price purchase order. The procurement consists of three line items: three Jib Cylinders (NSN 3040 01-F12-2745), four Luff Cylinders (NSN 3040 01-F12-2743), and ten Sheaves (NSN 3020 01-F12-2750). Strict packaging and marking standards apply, including MIL-STD-2073-1E Method 10 for cylinders and ASTM D5118 fiberboard boxes for sheaves, with all items requiring marking per MIL-STD-129R and barcoding per ISO/IEC-16388-2007. Delivery is required by September 30, 2026, to the USCG Surface Forces Logistics Center in Baltimore, Maryland, with shipping terms set as FOB Destination. Offers will be evaluated based on price and the ability to meet the brand name and authorized distributor requirements. Successful contractors must submit invoices through the Invoice Processing Platform with payment terms of Net 30. All submissions must include the vendor's Unique Entity Identifier and CAGE code, and offerors must maintain current representations and certifications in the System for Award Management.
Fluid Power Cylinder and Actuator Manufacturing

POSTED

3 months ago

DEADLINE

in 9 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS