Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 8 at 2:00 PM EDT

Register Free →

USS JOHN CANLEY Mid Term Availability. FY 27

Active
N6264926RL015Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The USS JOHN CANLEY (ESB 6) Mid-Term Availability (MTA) solicitation, identified as N6264926RL015, is a hybrid firm-fixed-price and time-and-materials contract issued by the Navsup Fleet Logistics Center Singapore Office under the Department of Defense for Fiscal Year 2027. The work requires comprehensive alterations, repairs, maintenance, and routine shipyard tasks to be performed aboard the vessel within the U.S. 7th Fleet Area of Responsibility, with a primary performance period from March 1, 2027, to April 15, 2027, and an optional extension through April 30, 2027. The contract is governed by a strict pass/fail evaluation system for technical and past performance factors, with award determined solely on the lowest evaluated price provided both non-price factors are rated acceptable. Offerors must hold an MSRA/ABR certification and submit proposals electronically via email to Kesavan.krishnansingh.ln@us.navy.mil, with large files transmitted through DoD SAFE, ensuring compliance with detailed formatting requirements including English-language submissions in Times New Roman 12-point font, A4 or letter-size paper, one-inch margins, and Microsoft Office or Adobe Acrobat compatibility without password protection. The contract includes extensive attachments such as the Work Item Specification Package (MSC SSU 27-008 and SRF SING 005-27), Government-Furnished Property listings, contractor price breakdowns, quality assurance surveillance plans, and contract administration plans. The contract mandates strict adherence to military and industry standards including MIL-STD-129 for packaging and shipping labels, MIL-STD-130 for Unique Item Identification with machine-readable data, and ABS standards for critical quality requirements. All testing and inspection equipment must be calibrated against National Bureau of Standards traceable references, and subcontractor quality systems are subject to government monitoring. Payment will be processed exclusively through Wide Area Work Flow (WAWF), requiring specific document types such as cost vouchers for labor-hour items and invoice/receiving reports for fixed-price line items, with payments routed to the Navy ERP Accounts Payable office in Mechanicsburg, PA. Contractors must submit invoices and Material Inspection and Completion Reports to designated email addresses and confirm compliance with numerous DFARS and FAR clauses including Prompt Payment, Only One Offer, Annual Representations and Certifications (Alternate A), Critical Safety Items, and Limitations on

General Info

Mid-Term Availability maintenance for USS JOHN CANLEY FY 2027 requires MSRA/ABR certification, submit by July 20, 2026.

Agency

Department Of Defense → Navsup Flt Logistics Ctr Singapore OfficeView Agency

NAICS

336611 - Ship Building and Repairing View NAICS

Place of Performance

AP

Set-Aside

NONE

Documents

(6)

Answers to Clarification 0001 for Ship Services and Materials

PDFq-and-a

Amendment 0002 to Solicitation N6264926RL0150002

PDFamendment

FY-27 Standard Work Item Index

PDFwork-item-index

Amendment 0001 to Solicitation N6264926RL015

PDFamendment

USS JOHN L. CANLEY Work Item Index Report

PDFwork-item-index-report

Solicitation N6264926RL015 for USS JOHN CANLEY Mid-Term Availability

PDFifb

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseSolicitation
Amendment 1

Contract was updated

Posted

Solicitation

Amendment 2

Contract was updated

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Flt Logistics Ctr Singapore Office
Contacts1 person available
OfficeFPO, AP, 96534-2150, USA
Organization / Agency
Department Of Defense → Navsup Flt Logistics Ctr Singapore Office
View Agency Profile
Office AddressFPO, AP, 96534-2150, USA

Full Description

Show more

USS JOHN CANLEY  (ESB 6) Mid-Term Availability (MTA). Contractor must be MSRA/ABR holder. Please see attached solicitation. If interested in submitting a proposal, please contact via email at Kesavan.krishnansingh.ln@us.navy.mil for the solicitation attachments, including the specifications and references to be sent separately via DoDSafe email.


The purpose of this amendment is to make correction to POC contact info to Kesavan.krishnansingh.ln@us.navy.mil


The purpose of this amendment is to answer clarifications 0001. 

Similar Contracts

NAICS: 336611
New
Federal
USCGC MUNRO GAS TURBINE BLEED AIR HOSE INSULATIONThe U.S. Coast Guard is seeking a small business contractor to manufacture removable insulation covers for the Gas Turbine Bleed Air Hose on USCGC MUNRO (WMSL 755), following damage caused by oily water saturation that has rendered the main gas turbine inoperable above 40-degree ambient temperatures. The insulation components must replicate two distinct layers—an inner layer measuring 34 inches in length, 22 inches in width, and 2 inches in thickness, and an outer layer measuring 45 inches in length, 28 inches in width, and 2 inches in thickness—both constructed in compliance with ASTM F683-99, Paragraph 8, Page 8. The materials must consist of layered glass fiber felt for thermal resistance at temperatures of 450 degrees Fahrenheit and above, with the interior surfaces and ends wrapped in knitted wire mesh or wire-inserted fibrous glass cloth, and the exterior fully covered with fibrous glass cloth. All covers must be sewn and quilted with thread to ensure structural integrity, uniform thickness, and rigidity. The work must adhere to referenced Coast Guard drawings CGDWG 750-WMSL-508-001 and CGDWG 750-WMSL-259_023. The contract is a total small business set-aside under NAICS code 336611, with performance primarily taking place at the contractor’s facility and final delivery required at USCG Base Alameda, California. The period of performance is strictly limited to July 1, 2026, through July 15, 2026, reflecting the urgency to restore the vessel to fully mission-capable status. The contractor is responsible for supplying all materials, tools, and labor, with no government-furnished equipment or funding details specified. Proposals must be submitted by July 1, 2026, and technical inquiries should be directed to LTJG Justin Waters.
Sflc Procurement Branch 2(00085)

POSTED

2 days ago

DEADLINE

in 3 days
View Details