Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Utility Line Construction and Reconstruction involves the physical replacement and reconstruction of utility poles, lines, and infrastructure for prime contractors on State Water Resources Control Board projects. Located in Etna, Siskiyou County, California, the scope of work includes removing existing structures, installing new poles, and stringing conductors to maintain existing capacity. The project requires the use of specialized equipment such as bucket trucks, line tensioners, and pole-setting machinery to deliver a fully operational utility system. The contract is managed by the SWRCB Division of Water Quality under NAICS code 237130 and mandates strict compliance with the California Public Resources Code. All activities are designed to ensure the successful reconstruction of utility infrastructure within the specified region of California.

General Info

Subcontract for utility line reconstruction and pole replacement in Etna, Siskiyou County, California.

Agency

California → SWRCB, Division of Water Quality

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

Etna, CA

Set-Aside

NONE

Documents

This scope was carved out of 5G41 Walker-Bryan Rebuild Work Order 18-PacifiCorp.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → SWRCB, Division of Water Quality
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → SWRCB, Division of Water Quality
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs physical replacement and reconstruction of existing utility poles, lines, and infrastructure for prime contractors on State Water Resources Control Board projects in Siskiyou County, CA. Removes existing utility structures, installs new poles, and strings conductors to match existing capacity. Uses bucket trucks, line tensioners, and pole-setting equipment. Complies with California Public Resources Code. Delivers a reconstructed and operational utility system.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
Kittrell Job Corps Center-12 Strand Fiber Optic Replacement- Bldg 2, Bldg 3, Bldg 4
Solicitation # kittrell-job-corps-center-12-strand-fiber-optic-replacement-bldg-2-bldg-3-bldg-4
Covenant Learning Solutions, operator of the Kittrell Job Corps Center in North Carolina, is soliciting sealed bids for the replacement of 12-strand aerial fiber optic cables and associated connectors between Buildings 2, 3, and 4. The contractor is responsible for providing all labor, materials, equipment, and supervision to install outdoor-rated fiber optic cable along existing aerial pathways and terminate them into existing network switches. A critical requirement of this project is that the existing network service must remain fully operational without interruption until the owner authorizes the final switch-over. The contractor must also provide a construction timeline for approval during a pre-construction meeting and adhere to standard work hours of 8:00 AM to 3:00 PM, Monday through Friday. The project requires strict adherence to industry standards, local codes, and manufacturer specifications regarding cable support and bend radius. Acceptance is contingent upon successful Optical Loss Testing, OTDR testing, continuity testing, and polarity verification, as well as the submission of a complete closeout package with as-built documentation. Bidders must hold a valid North Carolina General Contractor license and maintain all necessary Builder's Risk and Liability insurance. Proposals must be submitted via email to Rachelle Judkins by September 30, 2026, and must include a completed Mandatory Bid Document. Payment will be issued as a single lump sum upon project completion, provided all required purchasing documentation is submitted.
Covenant Learning Solutions operator of Kittrell Job Corps Center

POSTED

about 8 hours ago

DEADLINE

in 18 days
View Details
NAICS: 237130
New
SLED
FTTP-PHASE 4 -IFB 16
Solicitation # IFB 16
Shrewsbury Electric and Cable Operations (SELCO) is soliciting bids for the Fiber to the Premises (FTTP) Network Upgrade Phase 4 in Shrewsbury, Massachusetts. The project involves the installation of approximately 15 miles of single-mode aerial and underground fiber optic cable, including signal transmission laterals from the existing backbone ring to splitter cabinets and distribution laterals to public right-of-way access points. The scope of work encompasses fiber optic cable installation, splicing, and bi-directional testing, with specific technical requirements for fiber characterization and reporting using EXFO devices. The contract will be awarded to the lowest responsible and eligible bidder, requiring a 5% bid deposit and a payment bond for 100% of the total contract price. The project follows a strict performance timeline, with mobilization occurring within two weeks of the executed contract and full completion, including all deliverables and punch list items, required within 30 weeks. Compliance requirements include adherence to Massachusetts Prevailing Wage Laws, OSHA safety regulations, and the Massachusetts Anti-Discrimination Statute. Contractors must provide detailed close-out documentation, including as-built drawings and testing results, to receive final payment, as SELCO will withhold 25% of the total contract value until a final audit is completed. Bids are due by September 29, 2026, and must be submitted in sealed envelopes to the Town Manager's Office at Shrewsbury Town Hall.
SELCO1 - SELCO

POSTED

about 19 hours ago

DEADLINE

in 18 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS