Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

5G41 Walker-Bryan Rebuild Work Order 18-PacifiCorp

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project involves replacing a single wooden electric utility pole located at 860 Sawyer’s Bar Road in Etna, Siskiyou County, California, under Work Order 18-PacifiCorp, identified by the project title 5G41 Walker-Bryan Rebuild. The work is strictly limited to the replacement of existing infrastructure with no expansion of service capacity and is classified under CEQA categorical exemption §15302(c), which permits such replacements provided they conform to current design standards and do not increase environmental impact. The State Water Resources Control Board, Division of Water Quality, serves as the lead agency overseeing the project and has approved the exemption, but no formal contract type, pricing, or estimated value has been disclosed. Performance is expected to occur on-site at the designated location with inspection and acceptance likely occurring there as well, though specific inspection criteria, quality standards, or acceptance protocols are not outlined in the documentation. The primary point of contact is Nimisha Patel, Environmental Scientist, with Emily Newell of PacificCorp acting as a secondary contact. No contract clauses from the Federal Acquisition Regulation (FAR), packaging or marking requirements, payment or invoicing details, accounting codes, or evaluation factors for award have been provided. There are no specified delivery schedules, FOB terms, contract administration representatives with official designations, or certifications from the offeror such as UEI, CAGE codes, or socioeconomic status. The solicitation was posted on July 16, 2026, but no submission deadlines, proposal formatting instructions, or electronic portal details are included, and no attachments or amendments are referenced beyond the certified exemption document. The project appears to be a low-complexity infrastructure replacement executed under streamlined environmental compliance procedures without standard procurement documentation typically associated with federal contracts.

General Info

Replace wooden utility pole at 860 Sawyer’s Bar Road under CEQA exemption, no service expansion, State Water Board oversees.

Agency

California → SWRCB, Division of Water Quality

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

Unincorporated land at 860 Sawyer’s Bar Road, Etna, CA

Set-Aside

NONE

Documents

(1)

Notice of Exemption for 5G41 Walker-Bryan Rebuild Work Order 18

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → SWRCB, Division of Water Quality
Contacts2 people available
OfficeN/A
Organization / Agency
California → SWRCB, Division of Water Quality
Office AddressN/A
Contacts
Nimisha PatelEnvironmental Scientist
Emily NewellT&D Environmental Manager

Full Description

Show more
The Project purpose is to replace a wooden electric utility pole.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
SLED
Public Safety DAS UpgradeThe contract entails the demo and installation of a Distributed Antenna System (DAS) designed to enhance public safety communications across critical facilities managed by the Port of Seattle. The scope includes deploying Bi-Directional Amplifiers, antennas, cabling, fiber optic infrastructure, patch panels, and all other components specified in the engineered design to ensure a fully redundant and reliable system. The work must align with stringent public safety requirements, ensuring uninterrupted signal coverage in high-risk or high-traffic areas. Post-installation, comprehensive coverage testing and system commissioning are required to validate performance against established design standards, ensuring the DAS meets operational thresholds for emergency response communications. The project is managed by the Aviation Project Management Group under the Port of Seattle, with Leila Gonzalez-Rigatto serving as the primary point of contact and Rishiraj Savita as the project manager. The North American Industry Classification System code 237130 indicates it falls under Communication and Data Services for Public Safety Infrastructure. Although the solicitation number and set-aside details are not provided, the forecasted posting date of July 20, 2026, signals preparation for future procurement. The physical performance location is not specified but is implied to be within Port of Seattle aviation facilities requiring enhanced radio frequency coverage for first responders and operational personnel.
Aviation Project Management Group

POSTED

about 4 hours ago

DEADLINE

N/A
View Details
NAICS: 237130
New
SLED
Packaged SubstationPublic Utility District No. 1 of Lewis County is soliciting bids for a packaged substation including all associated equipment and delivery as specified in Exhibit C, with the project scoped for Phase 1 only and requiring the entire system to fit within a 294'x144' fence while complying with NESC code and referencing design standards JH-E-100 and JH-C-101 to 110. The substation must include transmission and distribution equipment such as circuit breakers, potential transformers, disconnect switches, bus conductors, insulators, ground grid, conduit, control enclosure, and foundation designs for all steel structures. Deliverables are split into two shipping packages: Package 1 containing anchor bolts, templates, and foundation drawings must be delivered by April 30, 2027, to 124 Habein Rd, Chehalis, WA, and Package 2 with steel structures, pipe bus, switches, and components by July 16, 2027, to 2844 Jackson Hwy, Chehalis, WA, with final delivery of the complete system required on or before February 2028. All equipment must be packaged to prevent damage, labeled with the purchase order number on every document and container, accompanied by packing lists and MSDS for hazardous materials, and shipped F.O.B. destination with risk of loss transferring upon district acceptance. Bids must be submitted by August 4, 2026, in sealed physical form to 321 N.W. Pacific Avenue, Chehalis, WA, via the procurement system, with electronic submissions allowed only through the portal and no faxes, emails, or informal quotes accepted. The solicitation requires submission of the vendor bid form, detailed bid data spreadsheet, and optional alternates on separate sheets. For bids totaling $120,000 or more, a bid guarantee of five percent of the bid amount is required, and awardees must furnish a ten percent performance bond within ten business days, acceptable as certified check, cashier’s check, irrevocable letter of credit, performance bond, or savings account assignment issued by a Washington-admitted insurer with a Best’s Rating of A-, Class VII or better. The contractor must maintain general liability insurance of $1,000,000 per occurrence and $2,000,000 general aggregate, workers’ compensation as required by law, and automobile
Public Utility District No. 1 of Lewis County

POSTED

2 days ago

DEADLINE

in about 1 month
View Details
NAICS: 237130
New
SLED
IFB 2026-01 Fork Union Community Center Generator ProjectThe Offeror is responsible for delivering a complete turnkey solution for the Transitional Shelter generator project at the Fork Union Community Center in Virginia, encompassing all labor, materials, equipment, and services required from procurement to final commissioning. This includes ordering and delivering the generator, pouring and preparing a concrete pad, securing all necessary building code inspections, coordinating Dominion Power downtime, excavating and trenching for electrical conduits, burying and protecting wiring, restoring the site with seeding and recovery, terminating all electrical connections, and performing comprehensive testing to ensure full operational functionality. The Offeror must also provide hands-on operational training for Fluvanna County staff to ensure proper and safe use of the system. All work must be completed in accordance with local and state regulations, including compliance with VA 811 utility location requirements and proper coordination with utility providers. The solicitation, identified as IFB-2026-01 with reference number IFB-124625, was posted on July 17, 2026, and responses are due by August 4, 2026. The project is managed by Fluvanna County through the Virginia state government, with Linda Mills as the point of contact for inquiries. Performance is required at the Fork Union Community Center located at 5725 James Madison Highway, Fork Union, VA 23055, and the successful bidder must be prepared to manage every aspect of the project from start to finish with full accountability for timelines, quality, and regulatory compliance.
Fluvanna County

POSTED

3 days ago

DEADLINE

in 15 days
View Details
NAICS: 237130
New
Federal
U.S. ARMY 63RD READINESS DIVISION MILCON ERCIP MICROGRIDThis procurement, identified as solicitation W9123826RA016, is a total small business set-aside under NAICS code 237130 with a size standard of $45,000,000 for the U.S. Army 63rd Readiness Division MILCON ERCIP Microgrid project located in Mountain View, California. The objective is to design, install, and commission a fully operational microgrid system capable of providing 14 or more days of energy resilience for mission-critical functions at the reserve center. The system includes a 750kW ground-mounted photovoltaic solar array, a 750kWh battery energy storage system, an 800kW diesel backup generation unit with a 10,000-gallon fuel storage tank, a master microgrid controller, and automatic smart switches to manage power distribution. The microgrid must operate autonomously in island mode, seamlessly connect to and disconnect from the utility grid, and be installed on a closed restricted network requiring an Authority to Operate under DODI 8510.01 with cybersecurity design aligned to UFC 4-010-06. All proposals must be submitted electronically through the Procurement Integrated Enterprise Environment (PIEE) by July 31, 2026, at 7:00 PM PDT, following strict formatting guidelines that require two separate volumes: a technical volume limited to 15 pages and a price volume containing the SF 1442 and supporting documentation. Offerors and subcontractors must be actively registered in both SAM.gov and PIEE, with registration completed at least one week prior to the solicitation release. Proposals will be evaluated using the Lowest Price Technically Acceptable method, with technical acceptability determined by past performance and schedule narrative, and a firm fixed-price contract is anticipated. No contract award will be made until appropriated funds become available, as noted under FAR 52.232-18. Liquidated damages of $3,100 per calendar day of delay for construction are specified, and the period of performance is set at 732 days from notice to proceed. Key compliance requirements include adherence to MIL-STD-161 for piping and tank marking, use of NATO symbol F-34 for JP-8, mandatory manufacturer nameplates with serial and model numbers, compliance with ASTM D709 for field-fabric
W075 Endist San Fran

POSTED

3 days ago

DEADLINE

in 11 days
View Details
NAICS: 237130
New
Federal
Tower Maintenance IDIQ Radar Operations CenterThe U.S. Department of Commerce, NOAA, is seeking to establish a five-year Indefinite Delivery, Indefinite Quantity (IDIQ) contract for comprehensive maintenance services supporting the Next Generation Weather Radar (NEXRAD) WSR-88D radar tower network, exclusively set aside for small businesses under FAR 19.5. The contract will be awarded through three contract line items: CLIN 0001 for tower inspection and engineering evaluations, CLIN 0002 for structural repair, replacement, and galvanic coating restoration, and CLIN 0003 for engineering data and change proposals related to tower coatings. All work will be performed across 160 designated WSR-88D tower sites nationwide, with the primary point of coordination based in Norman, Oklahoma. Offerors must submit a complete proposal package including Volume I (Price Quote), Volume II (Technical Proposal), and Volume III (Past Performance) as detailed in Section L, with failure to provide all required documentation resulting in a nonresponsive submission. Proposals must include a comprehensive safety plan adhering to OSHA CFR 1910-268, ANSI Z359 and Z490, and NATE CTS standards, along with verifiable certifications for all tower climbers and equipment, and must be submitted by the extended deadline of July 29, 2026. All personnel performing tower work must use OSHA CFR 1926.954 compliant personal protective equipment, and contractors must notify the Contracting Officer Representative at least seven days in advance of arriving at any site, except in urgent cases. Once awarded, the contractor will be responsible for delivering all materials in new, unused condition and ensuring that repair work restores towers to a “like new” state, including foundation replacements, lightning system repairs, corrosion mitigation, bird proofing, and power washing of chloride deposits. Non-OEM parts may be used if proven interchangeable and of equal quality. Reports for inspections and engineering evaluations must be submitted digitally via email to the COR within 30 days of completion, including contract number, CLIN, date of completion, and on-site POC, with a requirement of fewer than two errors per report and responses to government clarifications within three business days. Quality assurance site completion checklists, signed by both contractor and government personnel, must be submitted with each task order, verifying all work was completed, soluble salt tests were conducted, and the site was returned to its original
Department Of Commerce Noaa

POSTED

3 days ago

DEADLINE

in 9 days
View Details
NAICS: 237130
New
Federal
Nez Perce-Clearwater NF - Seed Orchard Disconnect and Electrical Life Safety RehabThe contract solicitation 1240LU26Q0068 for the Seed Orchard Disconnect and Electrical Life Safety Rehab project at the Salmon River Seed Orchard Pump Station in Idaho is a total small business set-aside under NAICS code 237130, with a size standard of $45 million, restricting eligibility exclusively to small business concerns. The scope of work involves relocating existing overhead power to underground service, installing a new 400A, 480V, three-phase Type 4 electrical disconnect and post, replacing outdated pump controls and electrical backboards with new NEMA Type 4 Motor Control Center mounting assemblies, and addressing hazardous electrical deficiencies to ensure operational safety. Performance must begin within 10 calendar days of notice to proceed and be completed within 250 calendar days, with the revised period of performance now spanning from August 15, 2026, to October 15, 2026. The project requires full compliance with NFPA 70-2020 (NEC), NESC, NECA, and UL standards, along with OSHA regulations, and mandates third-party inspections, quality assurance reports, and submission of closeout documentation including wiring diagrams, test reports, and a written certification of completion. A firm fixed price contract is anticipated, and all quotations must include pricing for base items to be considered responsive. Quotations are due by July 22, 2026, at 12:00 p.m. Mountain Time and must include the completed SF-1442, Schedule of Items, Experience Questionnaire (Attachment 7), and acknowledgment of any amendments. A mandatory site visit is scheduled for July 7, 2026, to assess site conditions and accessibility under inclement weather. Performance and payment bonds at 100% of the contract value are required if the award exceeds $150,000, while payment protection bonds or irrevocable letters of credit are required if the contract value is between $35,000 and $150,000, both due within 10 days of award. The contractor must be registered in SAM.gov at the time of submission and award, and is responsible for securing all permits, providing safety equipment including first aid kits and fire extinguishers, and ensuring site security against theft and vandalism. Evaluation will prioritize experience, past performance, and fair and reasonable pricing
Csa Intermountain 9 Usda-Fs

POSTED

3 days ago

DEADLINE

in 2 days
View Details
NAICS: 237130
New
SLED
Burbank Grid Forward 4kV to 12kV Distribution System UpgradeThe Burbank Grid Forward project by Burbank Water and Power will modernize the city’s aging 4kV electrical distribution system by upgrading it to a 12kV system across two priority corridors in Burbank, California. This initiative involves the sequential decommissioning and safe removal of existing 4kV lines and equipment, followed by the installation of new overhead and, in select areas, underground 12kV feeder circuits spanning 30 circuit miles. The upgrade includes installing 2,121 poles, 913 transformers, switchgear, protective relays, vaults, and conduit systems to support the enhanced infrastructure. Once construction is complete, all new components will go through a thorough commissioning process to ensure safe and reliable operation. The project will result in the retirement of two outdated 4kV substations—Victory and Winona—leading to long-term reductions in operational and maintenance expenses. By transitioning to a more resilient 12kV system, Burbank aims to significantly improve grid reliability, accommodate future growth, and better serve communities identified as California Climate Investments priority areas. The initiative is managed by the City of Burbank, with Michael Wang, Principal Electrical Engineer, serving as the primary point of contact for project-related inquiries. The project is forecasted and publicly listed with a posted date of July 17, 2026.
City of Burbank

POSTED

3 days ago

DEADLINE

N/A
View Details