Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Vermont was posted on May 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

VSARA Electrical Distribution Upgrades

Closed
73803State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
SLED
Existing Generators Replacement Aguadilla, PR
Solicitation # 872298
This project involves the complete replacement of two existing power generators at the Aguadilla Detention Facility in Aguadilla, Puerto Rico. The scope of work requires the installation of one 100 kW and one 150 kW Perkins diesel generator, both featuring stainless-steel enclosures to protect against salt air and moisture. The installation includes two new NEMA 3R automatic transfer switches, securing the units to the existing concrete slab with Grade 5 or higher galvanized anchor bolts, and performing comprehensive generator load tests. The project is estimated to have a magnitude between $250,000 and $300,000, with a total period of performance of 270 calendar days from the Notice to Proceed. The contract is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) IDIQ. Award will be based solely on the lowest total evaluated price, provided the offeror demonstrates technical understanding, a sound implementation approach, and a robust safety and quality control program. Key compliance requirements include adherence to the Buy American Act, Davis-Bacon prevailing wage rates per determination PR20260001, and strict security protocols, including PIV card issuance and non-disclosure agreements for personnel. All work must be performed during regular business hours, Monday through Friday, and must comply with NFPA 70, the International Building Code, and NEC Article 445.
Bristol Alliance of Companies

POSTED

about 13 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
SLED
LED Lighting and Occupancy Sensor Upgrades DRAFT
Solicitation # 872291
The LED Lighting and Occupancy Sensor Upgrade project is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) for the Buffalo Federal Detention Facility in Batavia, New York. The project involves providing all engineering, labor, equipment, and materials to upgrade the facility with energy-efficient LED lighting fixtures and occupancy sensors, including the removal and disposal of existing fluorescent fixtures, lamps, and ballasts. The estimated magnitude of the contract is between 2 million and 2.3 million dollars, with a period of performance of 180 calendar days from the notice to proceed. Award will be based solely on the lowest total evaluated price. The contractor is required to adhere to Davis-Bacon Act wage determinations and comply with standards from OSHA, ADA, NFPA, and the International Building Code. Key deliverables include a Quality Control Plan due within 15 days of award, a site survey within 30 days, and a final closeout package consisting of as-built drawings, warranty documentation, and 5 percent attic stock. The contractor must also provide a minimum two-hour training session for facility maintenance personnel and a detailed commissioning report verifying that 100 percent of fixtures and controls were tested. Payment requests must be submitted electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 13 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
SLED
Conex Offices for Forensics Personnel - St. Thomas
Solicitation # 872300
This project involves a Firm-Fixed-Price task order under an 8(a) Multiple Award Construction Contract for the provision and installation of two 40ft steel FLEXTAINER conex offices for forensics personnel at the St. Thomas HSI Facility in the US Virgin Islands. The scope of work includes the construction of 3k PSI reinforced concrete slabs, installation of the units, and equipping each office with two split-system A/C units, R-11 insulation, vinyl flooring, LED lighting, and a steel door with a Cypher lock. Each unit must also include four security windows and a 5-pound ABC fire extinguisher. Electrical connectivity must be established via 2-inch PVC or uPVC conduit to the nearest circuit. The contract has an estimated magnitude between 250,000 and 300,000 dollars, with a period of performance of 364 calendar days from the Notice to Proceed. Award will be based on the lowest total evaluated price, considering technical approach, safety, and quality control plans. Key requirements include compliance with the Buy American Act, adherence to Davis-Bacon prevailing wage rates for the Virgin Islands, and strict security protocols, including the signing of DHS Non-Disclosure Agreements and mandatory cybersecurity training. Contractors must conduct a site survey prior to proposal submission and provide a detailed project schedule within 15 days of the Notice to Proceed. All invoicing must be processed through the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 13 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
IE JCC Fire Alarm Repairs
Solicitation # Inland Empire Fire Alarm Deficiencies (169706,169708,169733,169736 & 16937)
Management & Training Corporation (MTC), operator of the Inland Empire Job Corps Center in San Bernardino, California, is soliciting subcontractor bids for a fixed-price, single lump sum contract to address fire alarm deficiencies. The scope of work includes the installation of manual pull stations, horn/strobe notification appliances, and the replacement of six existing fire alarm bells with new horn/strobe units. All new devices must be integrated into the existing fire alarm system and undergo complete functional testing. The project must be completed within 90 consecutive business days following a written Notice to Proceed, with work beginning within five business days of an agreed-upon start date. Bids are due by 3:00 pm PT on September 16, 2026. Submissions must include the MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, a completed MTC Supplier Packet (W-9, self-certification, and terms acceptance), and proof of insurance. For bids equal to or greater than $25,000, a bid bond guarantee of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds totaling 100% of the contract price. The contract is subject to Construction Wage Rate Requirements (CWRR), requiring compliance with California prevailing wage determinations and the submission of weekly certified payroll. Award will be based on overall best value.
Inland Empire Job Corps

POSTED

about 13 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The Vermont Department of Buildings & General Services is soliciting bids for the Vermont State Archives & Records Administration (VSARA) Electrical Distribution Upgrades project at 1078 US Route 2, Middlesex, Vermont. The scope of work includes replacing the existing uninterruptible power supply (UPS) system along with all circuit breakers, wiring, and panelboards, demolition of the current UPS setup, reworking branch wiring to connect to new panelboards, and providing factory start-up, commissioning, and owner training. Interested contractors can access project documents through Blueprints, Etc., with a non-refundable fee applicable for each set purchased. A non-mandatory pre-bid meeting is scheduled for June 10, 2026, and all questions must be submitted in writing by June 19, with responses posted shortly afterward. Bids must be submitted electronically by June 26, 2026, via email to the designated state address, with clear reference to the project title. Any clarifications or exceptions to the RFP must be submitted prior to the question deadline, as late submissions will not be considered. The project is managed by James Meyers, State Senior Purchasing Agent, who can be contacted via email for inquiries. All official notices, addendums, and Q&A will be posted on the Blueprints, Etc. website, ensuring transparency throughout the bidding process. This solicitation emphasizes electronic bid submission adhering to specified instructions to participate in this important electrical upgrade for a key state facility.

General Info

Vermont seeks bids for VSARA electrical upgrades, including UPS replacement; electronic submission by June 26, 2026.

Agency

Vermont → Department of Economic DevelopmentView Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

VT, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVermont → Department of Economic Development
Contacts1 person available
OfficeVT, USA
Organization / Agency
Vermont → Department of Economic Development
View Agency Profile
Office AddressVT, USA

Full Description

Show more
CONSTRUCTION INVITATION TO BID ISSUED BY: Department of Buildings & General Services Vermont State Archives & Records Administration (VSARA) Electrical Distribution Upgrades ISSUE DATE: May 26, 2026 BIDDERS CONFERENCE: There will be a non-mandatory pre-bid meeting at the site on June 10, 2026 – 10:00 AM (EST). QUESTIONS DUE: June 19, 2026 – 4:30 PM (EST) RESPONSES DUE BY: June 26, 2026 – 4:30 PM (EST) STATE CONTACT: James Meyers, State Senior Purchasing Agent E-MAIL : BGS.OPCVendorDocs@vermont.gov Contractors are invited to bid on the Vermont State Archives & Records Administration (VSARA) Electrical Distribution Upgrades for Buildings and General Services at 1078 US Route 2 in Middlesex, Vermont. This project consists of, but is not limited to: The Work includes the replacement of the existing uninterruptible power supply (UPS), including all circuit breakers, wiring, panelboards and associated demolition of the existing UPS and associated wiring and rework of existing branch wiring to be fed from new panelboards, and includes the factory start-up and commissioning of the UPS along with Owner training. Blueprints, Etc. is the official source of information for documents concerning this Invitation to Bid. Documents may be obtained from Blueprints, Etc., 20 Farrell Street, South Burlington, VT 05403, by phone at 802.865.4503, by fax at 802.865.0027 or email to: orders@blueprintsetc.com. Project Manuals and Plans are available for preview at: http://www.blueprintsetc.com in the Private Plan Room. A password is required to access this project and may be obtained from Blueprints, Etc.. Any and all notifications, releases and addendums associated with this project will be posted at http://www.blueprintsetc.com. There is a non-refundable fee, plus applicable taxes and shipping costs for each set of documents purchased. QUESTION AND ANSWER PERIOD: Any vendor requiring clarification of any section of this RFP or wishing to comment or take exception to any requirements of the RFP must submit specific questions in writing to BGS.OPCVendorDocs@vermont.gov no later than 4:30 PM on June 19, 2026,All questions should include Vermont State Archives & Records Administration (VSARA) Electrical Distribution Upgrades Project in the subject line. Any comments, questions, or exceptions not raised in writing on or before the last day of the question period are waived. At the close of the question period a copy of all questions or comments and the State's responses will be posted at http://www.blueprintsetc.com. Every effort will be made to post this information as soon as possible after the question period ends, contingent on the number and complexity of the questions. ELECTRONIC BIDS ONLY: 8.2.1. All bids under this RFP must be submitted electronically in accordance with the submission requirements herein. Electronic bids will be accepted via email submission to BGS.VTBids@vermont.gov. The subject line of the email submission must reference the Project Title as indicated on the front page of this RFP.

More opportunities from Vermont → Department of Economic Development

Same awarding agency

NAICS: 485991
New
SLED
RFP_FSD_Transportation_9.11.26
Solicitation # FSD-Transportation-9.11.26
The Vermont Agency of Human Services, Department for Children and Families (DCF), Family Services Division is seeking to establish contracts with one or more providers to deliver Standard Transportation and Supported Family Time services for children and youth in state custody. These services include 24/7 transportation to schools, appointments, and visitations, as well as the provision of safe environments for supported family time with guidance and modeling for parents. While services are required statewide and potentially out-of-state, there is a specific need for contractors in the Bennington, Brattleboro, and Springfield districts. The period of performance is scheduled from January 1, 2027, through December 31, 2031, with options for three additional one-year extensions. Awards will be made based on the best interest of the State, with preference given to resident bidders and those promoting clean energy. Evaluation criteria include the bidder's project approach, five-year experience in transportation or supported family time, geographic reach, and previous experience with DCF. Selected contractors must ensure vehicles meet Vermont inspection standards and provide documentation of services to state workers within 30 days of contact. Payment terms are Net 30 days following the submission of detailed monthly invoices. The contract includes strict compliance requirements regarding non-discrimination, conflict of interest disclosures, and worker classification reporting for bids exceeding 250,000 dollars.
Special Needs Transportation

POSTED

1 day ago

DEADLINE

in 6 days
View Details
NAICS: 541199
New
SLED
Secondary Due Process Review Hearing Officer
Solicitation # 75145
The Vermont Department for Children and Families, through the Agency of Human Services, is seeking one or more qualified individuals or entities to serve as Secondary Due Process Review Hearing Officers. The selected contractor will act as an arbitrator for hearings involving children and youth, typically aged 13 to 17, who are appealing administrative placements in secure facilities. The primary objective is to determine if the individual meets the criteria for continued placement beyond eight days, utilizing a preponderance standard of evidence. The contract period runs from February 1, 2027, through January 31, 2032, with a requirement for the officer to maintain availability on Tuesday and Friday afternoons and issue written decisions within three business days. The procurement process requires a comprehensive bid submission including a technical response, price schedule, and a signed certificate of compliance. Awards are made based on the best interest of the State, with preference given to resident bidders and those promoting clean energy. Compensation includes a weekly base payment regardless of the number of hearings, as well as hourly rates for training and mandatory meetings. Contractors must adhere to strict confidentiality and non-disclosure agreements, maintain required insurance, and comply with federal and state non-discrimination laws. Invoicing is processed on a net 30-day basis, provided that a current W-9 and certificate of insurance are on file.
All Other Legal Services

POSTED

1 day ago

DEADLINE

in 16 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS