Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from California was posted on August 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Wastewater System Flow Monitoring Services

Closed
2026-09State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221320
New
Sioux City Wastewater Treatment Plant Facility Plan - Phase 1 Improvements Project
Solicitation # sioux-city-wastewater-treatment-plant-facility-plan-phase-1-improvements-project
The Sioux City Wastewater Treatment Plant Facility Plan Phase 1 Improvements Project, managed by Rice Lake Construction Group, involves extensive upgrades and rehabilitations to critical plant infrastructure in Iowa. Key mechanical and process improvements include the replacement of preliminary treatment equipment, primary clarifiers, and the RAS pump station, alongside the conversion of aeration tanks to a three-stage process and the rehabilitation of an anaerobic digester for sludge storage. The project also encompasses the construction of a new secondary control building, the installation of plant-wide odor control systems, and comprehensive electrical upgrades including new main switchgear, SCADA system enhancements, and standby emergency power generators. The scope of work requires a wide array of specialized services and materials, ranging from hazardous material abatement and concrete work to the installation of high-pressure wash systems and process gas and liquid handling equipment. Additionally, the project involves the demolition of several unused structures, including old primary clarifiers, pump houses, and storage buildings, to make way for modernized facilities. All work must adhere to NFPA 820 and other safety-related standards, integrating new HVAC, plumbing, and fire detection systems throughout the site.
Rice Lake Construction Group

POSTED

about 19 hours ago

DEADLINE

in 20 days
NAICS: 221320
New
SLED
Wastewater Treatment Services Management
Solicitation # DOC OZARK 0000000004SL
The Missouri Department of Corrections is soliciting bids for wastewater treatment services management at the Ozark Correctional Center in Fordland, Missouri. The selected contractor will provide oversight, management, and consulting services, which include furnishing all necessary labor, materials, equipment, and supplies. A primary requirement is the provision of a Class C wastewater operator to oversee the sewer treatment plant, ensuring operations and testing comply with Department of Natural Resources regulations 10 CSR 20-9-010 and 10 CSR 20-9-020. The contractor is also responsible for routine maintenance oversight and the submission of required permits and disposal notifications within 15 working days of the award. The contract period runs from December 1, 2026, through November 30, 2027, with options for up to two renewal periods. Award will be granted to the lowest responsive and reliable vendor based on firm fixed pricing. Bidders must be registered in MissouriBUYS and comply with various state and federal mandates, including the Prison Rape Elimination Act, the Americans with Disabilities Act, and Missouri tax compliance laws. All proposals must be submitted electronically via the MissouriBUYS portal by October 30, 2026. The contractor must maintain comprehensive insurance coverage and adhere to strict security protocols regarding Criminal Justice Information.
DOC OZARK CORRECTIONAL CENTER

POSTED

3 days ago

DEADLINE

in 23 days
NAICS: 221320
New
SLED
Dickenson County Public Service Authority Haysi Wastewater Treatment Plant
Solicitation # RFP-129272
The Dickenson County Public Service Authority is seeking proposals for a five year turn key operational contract, starting January 1, 2026, to manage the Haysi Wastewater Treatment Plant in Virginia. The primary objective is to ensure 100 percent regulatory compliance and protect public health through the 24/7/365 management of a conventional secondary treatment plant utilizing a rotating biological contactor process. Interested parties must submit separate proposals for two options: one for the operation of the Publicly Owned Treatment Works only, and another for the combined operation of the plant and seven off site pump stations. The selected contractor will be responsible for providing all skilled labor, supervision, and specialized equipment, including a qualified operator for emergency responses and a staff electrician experienced in VFD operation and level transducers. Key duties include sludge management using a 0.5 meter belt filter press, interior and exterior groundskeeping, and performing routine repairs up to 2,000 dollars per event. All process control testing and compliance sampling must adhere to the State of Virginia operating permit and be conducted by an accredited laboratory, with monthly Discharge Monitoring Reports submitted to the DEQ. Proposals are due by November 16, 2026, via the Commonwealth of Virginia eVA Portal.
Dickenson County

POSTED

7 days ago

DEADLINE

in about 1 month
NAICS: 221320
Federal
Maintenance, Repair, And Operation Of Incinerator Plant, Weight Scales, Potable Water Tanks, Wastewater Treatment Plants To Include Operation, And Granular Activated Carbon (GAC) Filtering Systems at CFA Yokosuka
Solicitation # N4008426R1011
Solicitation N4008426R1011 is a single-award Indefinite Delivery Indefinite Quantity (IDIQ) service contract for the preventative maintenance, repair, and operation of critical infrastructure at Commander Fleet Activities (CFA) Yokosuka, Japan. The scope of work encompasses the incinerator plant and segregation yard, weight scales, potable water tanks, and wastewater treatment plants, including granular activated carbon (GAC) filtering systems. The contractor is responsible for providing all necessary labor, supervision, management, tools, materials, equipment, and incidental engineering. Services are categorized as recurring work, divided into emergency, urgent, and routine tasks, as well as non-recurring incidental work. The contract is performance-based, utilizing measurable standards and OEM maintenance manuals to assess success. Financial terms include a base period and four option periods, with a total estimated government obligation ranging between 73,488,230.67 USD and 75,936,006.97 USD. Non-recurring work limits have been adjusted via amendment, with some periods capped at 800,000,000 JPY and others at 850,000,000 JPY. Order limitations are set with a minimum of 400,000 JPY and a maximum of 50,000,000 JPY per single item. Contractors must be authorized to conduct business in Japan and comply with all local laws, decrees, and labor standards. Notably, the U.S. Government will not grant United States Official Contractor status under the U.S.-Japan Status of Forces Agreement (SOFA). Invoicing is processed electronically through the Wide Area WorkFlow (WAWF) system. Offerors are subject to a 2 percent tax on certain foreign procurements unless an exemption is claimed via IRS Form W-14.
Navfacsyscom Far East

POSTED

7 days ago

DEADLINE

in 6 days

AI Contract Overview

Show more

The City of Modesto Utilities Department is soliciting professional consultant services for wastewater system flow monitoring to support its operations, Wastewater Master Plan, and General Plan Update. The project involves the installation of up to 50 flow monitors in manholes across the city's collection system to capture wet and dry weather flows. Data collection must occur continuously at minimum 5-minute intervals over a four-month period during the winter and spring of 2027, specifically targeting the peak window from December through April. The total project duration, including data analysis and the delivery of a final flow monitoring report, is expected to last approximately one year. Selection will be based on a qualifications-based process, with scoring heavily weighted toward the proposed scope of services (45%) and the project team's experience (35%). Key deliverables include site assessment forms, field calibration documents, and raw and refined flow data in graphical and tabular formats. The final report must be ADA-compliant and verified via CommonLook software. Consultants are required to maintain professional liability insurance of at least 2 million dollars and workers' compensation as required by California law. Proposals and separate cost files must be submitted through the OpenGov Procurement portal by September 8, 2026.

General Info

City of Modesto seeks wastewater flow monitoring services; deadline is September 8, 2026.

Place of Performance

CA, USA

Set-Aside

NONE

Documents

1

RFP/RFQ 2026-09 Wastewater System Flow Monitoring Services

PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Utilities
Contacts2 people available
OfficeModesto, CA, 95353, USA
Organization / AgencyCalifornia → Utilities
Office AddressModesto, CA, 95353, USA
Contacts
Juan OchoaAssociate Engineer
Mary OgasAdministrative Services Technician II

Interested Companies (27)

Multiple Pump ServicesSacramento, CA
Shaffer Business Forms
EntramPORT CHARLOTTE, FL

See All 27 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The City was first incorporated in 1870 and operates as a Charter City. The City encompasses approximately 42 square miles in Stanislaus County and has approximately 225,000 wastewater customers. The wastewater system is comprised of approximately 680 miles of sewer pipes ranging from 6-in to 66-in diameter, 43 lift stations, and two treatment plants with primary treatment at Sutter Campus and Secondary and Tertiary Treatment at Jennings Campus.

More opportunities from California → Utilities

Same awarding agency

NAICS: 513210
New
SLED
Electric Operations Outage Management and Electronic Logging Software
Solicitation # RFP197646
The City of Palo Alto Utilities (CPAU) is soliciting proposals under RFP197646 for a fully cloud-hosted Outage Management System (OMS), electronic operational logging platform, and switching order management suite. This project aims to replace manual, document-based procedures with a modern digital platform to improve situational awareness, ensure field crew safety through automated interlocking switching steps, and maintain compliance with NERC and WECC reliability standards. Key technical requirements include native, out-of-the-box API connectivity with CAISO and RC West systems to avoid third-party middleware, a guaranteed minimum system availability of 99.9 percent uptime, and adherence to SOC 2 Type II or FedRAMP cybersecurity frameworks. The resulting five-year, fixed-fee contract will include turnkey professional services estimated at 800 hours for implementation, asset ingestion, and configuration, as well as 24/7/365 emergency support for critical incidents. Proposals will be evaluated on a points-based system, with the highest weight placed on the proposed solution's technical capabilities and the firm's experience with municipal or regional electric utilities. Awarded contractors must meet comprehensive insurance requirements, including minimum limits of 1 million dollars for general, professional, and automobile liability, and comply with the City's environmentally preferred purchasing and zero waste requirements. Proposals are due by October 28, 2026.
Software Publishers

POSTED

5 days ago

DEADLINE

in 21 days
View Details
NAICS: 423610
SLED
Purchase and Delivery of Electric Parts for Inventory
Solicitation # RFQ199307
The City of Palo Alto, on behalf of the Electric Operations Department, Utilities Division, is soliciting quotes for the one-time purchase and delivery of various electric parts for inventory under RFQ 199307. The procurement includes items such as transformer and bushing covers, ground rods, non-concrete box lids and extensions, galvanized washers, strain clamps, extension links, insulators, and tap clamps. Bids must be submitted electronically by 3:00 pm on October 14, 2026. The contract will be awarded to the lowest responsive and responsible bidder based on the lowest total offer price for the base bid. If bidders propose alternate manufacturers, they must provide a corresponding data sheet, or the alternate will not be evaluated. Deliveries must be F.O.B. Destination, Freight Prepaid to Palo Alto, with the seller providing lead times for each line item. The City enforces strict environmentally preferred purchasing requirements, mandating FSC-certified paper packaging, recyclable materials, and the prohibition of expanded foam plastics. Failure to comply with these sustainability standards, including the requirement for the seller to take back reusable pallets at no cost, will result in liquidated damages ranging from 50 to 262 dollars per occurrence. Additionally, awarded contractors must meet comprehensive insurance requirements, naming the City as an additional insured, and provide a completed IRS Form W-9. Payment terms are established as Net 30 or greater.
Electrical Apparatus and Equipment, Wiring Supplies, and Related Equipment Merchant Wholesalers

POSTED

9 days ago

DEADLINE

in 7 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS