Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Wastewater Treatment Facility Outfall and Diffuser Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The State Water Resources Control Board is funding the Wastewater Treatment Facility Outfall and Diffuser Project in Yuba City, California, under Project Number 8682-110, with the City of Yuba City serving as the lead agency. The project involves substantial infrastructure upgrades to improve effluent discharge from the wastewater treatment facility, including modifications to existing effluent pumps, installation of a bifurcation station with flow metering to direct flows between the new outfall and existing disposal ponds, and construction of approximately two miles of new pipeline leading to a 250-foot diffuser structure in the Feather River. The diffuser consists of a 36-inch diameter welded steel pipe with sixteen 12-inch risers equipped with discharge ports, designed for controlled effluent dispersion. At the levee crossing, a vacuum-assisted siphon priming system will be installed, comprising a building, valve vault, and trap structure to ensure reliable pipeline operation. Additional project elements include a permanent access ramp along the Feather River West Levee, new electrical connections to the bifurcation station and vacuum building, and acquisition of both permanent and temporary easements across private and public lands to facilitate construction and long-term operation. Environmental compliance is ensured through a Mitigated Negative Declaration under the California Environmental Quality Act, with oversight from both the City of Yuba City and the State Water Board. The procurement is currently in a forecast status, posted on July 16, 2026, with funding approved by the State Water Board on July 15, 2026. No formal solicitation number, contract value, pricing, or detailed performance timeline has been published, indicating the project remains in the planning or pre-solicitation phase. Key contacts include Katherine Willis, Environmental Compliance Manager for the City of Yuba City, and Cedric Irving, Environmental Scientist with the State Water Board. The place of performance is concentrated in Yuba City and the adjacent Feather River corridor, extending into unincorporated Sutter County. While the project scope is well defined in terms of engineering deliverables and environmental compliance, no contract clauses, evaluation factors, packaging requirements, special provisions, or offeror certifications have been specified in the available documentation. The absence of FAR sections, clause references, and formal procurement details suggests this is a preliminary announcement outlining project intent rather than a formal solicitation, with full contracting procedures expected to follow pending final planning and funding confirmation.

General Info

State funds Yuba City wastewater outfall project with new pipeline, diffuser, and easements for Feather River discharge.

Agency

California → Yuba City

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Yuba City, CA

Set-Aside

NONE

Documents

(1)

NOD June 2026 - Yuba City Wastewater Treatment Facility Project

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Yuba City
Contacts2 people available
OfficeN/A
Organization / Agency
California → Yuba City
Office AddressN/A
Contacts
Cedric IrvingEnvironmental Scientist
Katherine WillisEnvironmental Compliance Manager

Full Description

Show more
The State Water Resources Control Board (State Water Board) is funding the Project referred to internally as Wastewater Treatment Facility Outfall and Diffuser Project. The Project includes the following: • Modifications to the existing effluent pumps at the wastewater treatment facility (WWTF) to accommodate the new, longer outfall pipeline and a new surge control system to be located just south of the existing WWTF effluent pump station, • A bifurcation station and flow meter at the connection to the existing outfall pipeline to send and meter flows to the new outfall or to the disposal ponds, • Approximately two miles of new outfall pipeline, beginning at the bifurcation station and ending at the new diffuser, • A vacuum-assisted siphon priming system at the levee crossing, including vacuum primer building, priming valve vault, and primer trap structure, • Diffuser structure consisting of 250 linear feet of new 36-inch diameter welded steel pipe buried within the Feather River, with sixteen 12-inch diameter risers with ports extending above the riverbed, • An access ramp along the Feather River West Levee for use by the construction contractor and as a permanent access for the City, • New power connections to the bifurcation station and vacuum-assisted siphon building, and • Acquisition of easements to accommodate these project features on affected properties, as well as temporary construction easements. PROJECT NUMBER: 8682-110

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project, solicitation W9128A26BA002, is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District. The project is located in Haleiwa, Oahu, Hawaii, and is set aside for small businesses, including SDB, WOSB, HUBZone, and VOSB certifications. The estimated contract value ranges from 1,000,000 to 5,000,000 dollars, with a performance period of 200 calendar days from the date of the Notice to Proceed. The scope of work is divided into three primary components: mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material, and the repair of the revetted mole, which includes clearing, grubbing, and stone rework. The contract requires strict adherence to USACE EM 385-1-1 safety standards and ASTM international standards for stone materials. Key personnel requirements include a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer, all of whom must be approved by the Contracting Officer. Bidders must provide a bid guarantee and subsequent performance and payment bonds. Liquidated damages for construction delays are set at 2,297 dollars per calendar day. Quality control is managed through a three-phase inspection process, and final acceptance is contingent upon a certificate from the QC Manager attesting that all work complies with the contract specifications. Payment is handled via monthly invoices, and the contract is subject to Davis-Bacon Act prevailing wage requirements.
Healy Tibbitts Builders, Inc.

POSTED

about 10 hours ago

DEADLINE

in 29 days
View Details