Water+ Treatment Plants Resiliency and Improvements Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Water+ Treatment Plants Resiliency and Improvements Project, managed by the City of Sacramento, focuses on critical infrastructure upgrades at the Sacramento River Water Treatment Plant (SRWTP) and the E. A. Fairbairn Water Treatment Plant (FWTP). The primary objectives are to replace aging infrastructure, enhance treatment resiliency through the integration of ozone treatment, and transition from chlorine gas to sodium hypochlorite for disinfection. A major component of the project is the capacity expansion of the SRWTP, which will increase from 160 million gallons per day to 235 million gallons per day in the initial phase, with a long-term goal of reaching 310 million gallons per day by 2050 to meet projected water demand. The scope of work includes the construction of a secondary intake in the Sacramento River, the installation of associated pipelines, and the expansion of treatment processes such as grit basins, filtration, and finished water storage. Additionally, the project involves improving the water transmission and distribution system near the SRWTP to resolve hydraulic constrictions. Recent modifications to the project include the acquisition of a two-acre adjacent parcel to relocate gravity thickeners and improve maintenance access, along with the implementation of stormwater management swales. This project is currently listed as a forecast with a posted date of July 15, 2026, under NAICS code 237990, and has been certified for environmental compliance under CEQA.

General Info

Modernize Sacramento water plants, expand capacity to 235 MGD, add ozone, replace chlorine gas, upgrade infrastructure through 2050.

Agency

California → City of Sacramento

Place of Performance

Sacramento, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Sacramento
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Sacramento
Office AddressN/A
Contacts
Megan ThomasSenior Engineer
Scott JohnsonPrincipal Planner

Full Description

Show more
The project consists of significant improvements at both of the City's drinking water treatment plants: Sacramento River Water Treatment Plant (SRWTP), located north of downtown, and E. A. Fairbairn Water Treatment Plant (FWTP), located east of Sacramento State University. These improvements replace critical treatment infrastructure past its useful life, improve resiliency to address environmental and regulatory changes impacting drinking water, and increase the drinking water treatment capacity at the Sacramento River Water Treatment Plant in order to ensure sufficient water supply to support projected water use increases through 2050. The initial phase would improve treatment reliability by replacing facilities at the end of their effective lives. This phase of work would also provide treatment resiliency through the addition of ozone treatment to both the E. A. Fairbairn Water Treatment Plant (FWTP) and the Sacramento River Water Treatment Plant (SRWTP). In parallel with the initial reliability and resiliency improvements at both water treatment plants, the SRWTP raw-water supply and treatment capacity would be increased from 160 million gallons per day (MGD) to 235 MGD. Timing of the components of this phase will depend on available funding and project timing. Additional phases would be staged to meet the increasing City potable water demand through 2050 for an ultimate capacity of3 IO MGD at the SRWTP. No expansion of treatment capacity at the FWTP would be implemented due to limitations placed on withdrawal amounts from the American River. Specifically, implementation of the proposed project would involve the following components: • Replacement of aging infrastructure at both FWTP and SRWTP; • Integration of ozone into the treatment process at both FWTP and SRWTP; • Conversion from chlorine gas to sodium hypochlorite as the primary chemical for disinfection of the water at both FWTP and SR WTP; • Construction and operation of a secondary intake in the Sacramento River and pipelines for transferring water to SR WTP; • Expansion of existing treatment processes at SR WTP to accommodate the additional capacity (including the grit basins, flocculation and sedimentation basins, filtration, and finished water storage); • Installation of pipe Iines between the existing Sacramento River Intake and the replacement intake and SRWTP; and • Improvement of the water transmission and distribution system in the vicinity of SRWTP to address critical hydraulic constrictions. Since certification of the EIR and project approval, the City proposes changes to the approved project that include an expansion of the existing eastern boundary of the SRWTP property to incorporate an adjacent City-owned parcel (Assessor Parcel Number 00 l-0061-026-0000), approximately two acres in size. The proposed changes also include the relocation, construction and operation of the new gravity thickeners infrastructure at this new area. The new gravity thickeners would be moved to the new area to provide additional space between this infrastructure and to improve access. The new area would include hardscape to accommodate the gravity thickeners and support maintenance activities. In addition, new vegetated areas or swales would be established along the perimeter of the new area to provide stormwater management. No new treatment infrastructure is proposed to be constructed and operated at the SRWTP. All other components of the approved project remain unchanged.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
San Vicente and Mt. Olivette Reservoir Improvements Project - Construction
Solicitation # SP2797-CT
The San Vicente and Mt. Olivette Reservoir Improvements Project (SP2797-CT) is a construction solicitation issued by the City of Santa Monica's Public Works Engineering Division. The project involves addressing civil, mechanical, structural, and electrical deficiencies for four water reservoirs located at the Mt. Olivette Reservoir and the San Vicente Reservoir. With a project estimate of $27,344,000, the work requires a contractor holding a Class A General Engineering license. The estimated contract duration is 730 calendar days, although some contract documents reference a term of 520 days from the notice to proceed. Liquidated damages for delays are set at $13,200 per day. Bids must be submitted electronically via the OpenGov Procurement portal, with a final deadline of October 29, 2026, at 3:00 PM PT. Submission requirements include a bid guarantee of at least 10 percent of the bid amount and certification of a mandatory pre-bid job walk. Awarded contractors must provide Labor and Material Payment and Performance Bonds for 100 percent of the contract sum. The scope of work includes strict adherence to local noise ordinances, prevailing wage requirements, and technical specifications for potable water materials and electrical labeling. Performance is subject to inspection by the City and its designated engineers at both the project site and the place of manufacture.
D500 PUBLIC WORKS - ENGINEERING DIVISION

POSTED

about 10 hours ago

DEADLINE

in 9 days
View Details
NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 16 hours ago

DEADLINE

in 15 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS