Water+ Treatment Plants Resiliency and Improvements Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Sacramento is undertaking a major initiative to modernize and expand its two primary drinking water treatment facilities—the Sacramento River Water Treatment Plant and the E. A. Fairbairn Water Treatment Plant—to ensure long-term reliability, resilience, and capacity to meet future demand through 2050. The initial phase focuses on replacing aging infrastructure at both plants, integrating ozone treatment to enhance water quality and resilience against environmental and regulatory shifts, and transitioning from chlorine gas to sodium hypochlorite for disinfection. A critical component is the expansion of the Sacramento River Water Treatment Plant’s raw-water intake and treatment capacity from 160 to 235 million gallons per day, achieved through new intake structures, pipelines, and upgrades to grit basins, flocculation and sedimentation systems, filtration, and finished water storage. Concurrent improvements include upgrades to the transmission and distribution network near the plant to eliminate hydraulic bottlenecks. A planned expansion of the Sacramento River Water Treatment Plant’s property by approximately two acres will accommodate the relocation of gravity thickeners to improve operational access and space between infrastructure, with new hardscape and vegetated swales added for stormwater management and maintenance efficiency. No additional treatment capacity will be added at the Fairbairn Plant due to constraints on American River withdrawals. Future phases will incrementally bring the Sacramento River Plant’s ultimate capacity to 310 million gallons per day, aligned with projected urban growth, while all other project components remain consistent with the originally approved plan. The initiative is designed to secure a sustainable, resilient water supply for the region without altering the environmental limits of existing water sources.

General Info

Modernize Sacramento water plants, expand capacity to 235 MGD, add ozone, replace chlorine gas, upgrade infrastructure through 2050.

Agency

California → City of Sacramento

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Sacramento, CA

Set-Aside

NONE

Documents

(1)

Notice of Determination for Water+ Treatment Plants Resiliency and Improvements Project Addendum

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Sacramento
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Sacramento
Office AddressN/A
Contacts
Megan ThomasSenior Engineer
Scott JohnsonPrincipal Planner

Full Description

Show more
The project consists of significant improvements at both of the City's drinking water treatment plants: Sacramento River Water Treatment Plant (SRWTP), located north of downtown, and E. A. Fairbairn Water Treatment Plant (FWTP), located east of Sacramento State University. These improvements replace critical treatment infrastructure past its useful life, improve resiliency to address environmental and regulatory changes impacting drinking water, and increase the drinking water treatment capacity at the Sacramento River Water Treatment Plant in order to ensure sufficient water supply to support projected water use increases through 2050. The initial phase would improve treatment reliability by replacing facilities at the end of their effective lives. This phase of work would also provide treatment resiliency through the addition of ozone treatment to both the E. A. Fairbairn Water Treatment Plant (FWTP) and the Sacramento River Water Treatment Plant (SRWTP). In parallel with the initial reliability and resiliency improvements at both water treatment plants, the SRWTP raw-water supply and treatment capacity would be increased from 160 million gallons per day (MGD) to 235 MGD. Timing of the components of this phase will depend on available funding and project timing. Additional phases would be staged to meet the increasing City potable water demand through 2050 for an ultimate capacity of3 IO MGD at the SRWTP. No expansion of treatment capacity at the FWTP would be implemented due to limitations placed on withdrawal amounts from the American River. Specifically, implementation of the proposed project would involve the following components: • Replacement of aging infrastructure at both FWTP and SRWTP; • Integration of ozone into the treatment process at both FWTP and SRWTP; • Conversion from chlorine gas to sodium hypochlorite as the primary chemical for disinfection of the water at both FWTP and SR WTP; • Construction and operation of a secondary intake in the Sacramento River and pipelines for transferring water to SR WTP; • Expansion of existing treatment processes at SR WTP to accommodate the additional capacity (including the grit basins, flocculation and sedimentation basins, filtration, and finished water storage); • Installation of pipe Iines between the existing Sacramento River Intake and the replacement intake and SRWTP; and • Improvement of the water transmission and distribution system in the vicinity of SRWTP to address critical hydraulic constrictions. Since certification of the EIR and project approval, the City proposes changes to the approved project that include an expansion of the existing eastern boundary of the SRWTP property to incorporate an adjacent City-owned parcel (Assessor Parcel Number 00 l-0061-026-0000), approximately two acres in size. The proposed changes also include the relocation, construction and operation of the new gravity thickeners infrastructure at this new area. The new gravity thickeners would be moved to the new area to provide additional space between this infrastructure and to improve access. The new area would include hardscape to accommodate the gravity thickeners and support maintenance activities. In addition, new vegetated areas or swales would be established along the perimeter of the new area to provide stormwater management. No new treatment infrastructure is proposed to be constructed and operated at the SRWTP. All other components of the approved project remain unchanged.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
North of River Sanitary District No. 1 WRRF Upgrades and Expansion
Solicitation # north-river-sanitary-district-no-1-wrrf-upgrades-expansion
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North of River Sanitary District No. 1 WRRF Upgrades and Expansion project located in Bakersfield, California. The scope of work is extensive, covering civil and site work such as aggregates, trucking, asphalt paving, and curb and gutter, as well as structural and finishing tasks including concrete reinforcing, masonry, welding, roofing, and electrical work. Interested firms must contact Kiewit to receive an Invitation to Bid through the Building Connected system, with a bid deadline of September 17, 2026, at 10:00 a.m. The project is partially financed by the Water Infrastructure Finance and Innovation Act (WIFIA) administered by the EPA, making it subject to the American Iron and Steel (AIS) Provisions, Davis-Bacon Related Acts, and DBE Program requirements. Qualified bidders must possess a valid California Contractor’s license and provide acceptable insurance. Additionally, responsible subcontractors may be required to provide bonding for 100 percent of their contract value, with Kiewit agreeing to reimburse bond premiums. The solicitation specifically encourages quotes from certified Disadvantaged Business Enterprises (DBE), including MBE, WBE, and SBE firms, and emphasizes the importance of maintaining labor harmony on the project.
Kiewit Infrastructure West Co.

POSTED

about 20 hours ago

DEADLINE

in 19 days
View Details
NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project, solicitation W9128A26BA002, is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District. The project is located in Haleiwa, Oahu, Hawaii, and is set aside for small businesses, including SDB, WOSB, HUBZone, and VOSB certifications. The estimated contract value ranges from 1,000,000 to 5,000,000 dollars, with a performance period of 200 calendar days from the date of the Notice to Proceed. The scope of work is divided into three primary components: mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material, and the repair of the revetted mole, which includes clearing, grubbing, and stone rework. The contract requires strict adherence to USACE EM 385-1-1 safety standards and ASTM international standards for stone materials. Key personnel requirements include a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer, all of whom must be approved by the Contracting Officer. Bidders must provide a bid guarantee and subsequent performance and payment bonds. Liquidated damages for construction delays are set at 2,297 dollars per calendar day. Quality control is managed through a three-phase inspection process, and final acceptance is contingent upon a certificate from the QC Manager attesting that all work complies with the contract specifications. Payment is handled via monthly invoices, and the contract is subject to Davis-Bacon Act prevailing wage requirements.
Healy Tibbitts Builders, Inc.

POSTED

about 20 hours ago

DEADLINE

in about 1 month
View Details