Minor Alteration No. WA2026036 – Irrigation Pipe Replacement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract authorizes the continued operation and maintenance of an existing 14-inch diameter irrigation pipe that passes through the Sacramento River right bank levee near West Sacramento, California, at Station 104+12. Originally constructed in 1965, the system includes a slant pump on a support structure, a corrugated metal pipe enclosure with a positive closure device on the waterside levee shoulder, a 12-inch intake pipe housed within a 20-inch steel sleeve, a 2-inch electrical conduit, and a siphon breaker on the landside shoulder. The project is classified as a minor alteration to an existing facility under CEQA Class 1 exemption, meaning no expansion of use or environmental impact is anticipated, and no new construction is permitted. All work must conform to the original as-built design documented in the 1965 Operation and Maintenance Manual for Bank Protection, specifically sheets 6.3, 15.6, and 17.2. The project is administered by the Central Valley Flood Protection Board, with Jane T. Tamano, Trustee of the Tamano Revocable Survivor’s Trust, designated as the applicant responsible for execution. The place of performance is clearly identified as levee mile 2.72 on the Sacramento River right bank in Yolo County, with coordinates provided for precision. No pricing, contract value, or financial terms are disclosed, as the document is labeled as a forecast and serves primarily as an authorization for maintenance under existing regulatory exemptions. There is no defined period of performance, delivery schedule, invoicing method, or contract administration personnel assigned, and no FAR clauses or federal procurement specifications are applicable or cited. The sole point of contact for the project is Jordan Robbins, Senior Environmental Scientist, who also serves as the primary liaison for regulatory and environmental compliance.

General Info

Authorization for maintenance of existing 14-inch irrigation pipe through Sacramento River levee under CEQA Class 1 exemption.

Agency

California → Central Valley Flood Protection Board

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

West Sacramento, CA

Set-Aside

NONE

Documents

(1)

Notice of Exemption for Permit No. 20091 - Irrigation Pipe Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Central Valley Flood Protection Board
Contacts2 people available
OfficeN/A
Organization / Agency
California → Central Valley Flood Protection Board
Office AddressN/A
Contacts
Jordan RobbinsSenior Environmental Scientist
Jane T. Tamano TrusteeSenior Environmental Scientist

Full Description

Show more
To authorize an existing 14-inch diameter irrigation pipe through the levee with a slant pump on a support structure, a corrugated metal pipe enclosure with positive closure device on the waterside levee shoulder, a 12-inch intake pipe within a 20-inch steel sleeve, a 2-inch conduit with electrical conductors, and a siphon breaker on the landside levee shoulder. This pipe structure was constructed in 1965 and is shown on the Operation and Maintenance Manual As Builts “Bank Protection, Right Bank Sacramento River from Monument Bend to Sacramento Weir, in 18 sheets, 1965”, file 50-04-3756, on sheets 6.3, 15.6, and 17.2 for Station 104+12.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
North of River Sanitary District No. 1 WRRF Upgrades and Expansion
Solicitation # north-river-sanitary-district-no-1-wrrf-upgrades-expansion
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North of River Sanitary District No. 1 Water Resource Recovery Facility Upgrades and Expansion project located in Bakersfield, California. The scope of work is extensive, covering civil and site work such as aggregates, trucking, asphalt paving, and curb and gutter, as well as structural and finishing tasks including concrete reinforcing, masonry, welding, roofing, and electrical work. The bid deadline is September 17, 2026, at 10:00 a.m., and interested firms must contact Kiewit to receive an Invitation to Bid through the Building Connected system. Because the project is partially financed by the Water Infrastructure Finance and Innovation Act administered by the EPA, it must comply with the American Iron and Steel provisions, Davis-Bacon Related Acts, and DBE Program requirements. Eligible bidders include certified DBE, MBE, WBE, SBE, and other disadvantaged or small business enterprises. Qualified subcontractors must possess a valid California Contractor's license, provide acceptable insurance, and may be required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Kiewit also emphasizes the importance of labor harmony and will consider quotes from bidders capable of maintaining positive human relations on the project.
Kiewit Infrastructure West Co.

POSTED

about 10 hours ago

DEADLINE

in 18 days
View Details
NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project, solicitation W9128A26BA002, is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District. The project is located in Haleiwa, Oahu, Hawaii, and is set aside for small businesses, including SDB, WOSB, HUBZone, and VOSB certifications. The estimated contract value ranges from 1,000,000 to 5,000,000 dollars, with a performance period of 200 calendar days from the date of the Notice to Proceed. The scope of work is divided into three primary components: mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material, and the repair of the revetted mole, which includes clearing, grubbing, and stone rework. The contract requires strict adherence to USACE EM 385-1-1 safety standards and ASTM international standards for stone materials. Key personnel requirements include a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer, all of whom must be approved by the Contracting Officer. Bidders must provide a bid guarantee and subsequent performance and payment bonds. Liquidated damages for construction delays are set at 2,297 dollars per calendar day. Quality control is managed through a three-phase inspection process, and final acceptance is contingent upon a certificate from the QC Manager attesting that all work complies with the contract specifications. Payment is handled via monthly invoices, and the contract is subject to Davis-Bacon Act prevailing wage requirements.
Healy Tibbitts Builders, Inc.

POSTED

about 10 hours ago

DEADLINE

in about 1 month
View Details