DEPERMING PIER AND PIER 5002 PILE REPLACEMENT

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves the replacement of timber fender piles at the Deperming Pier and Pier 5002 in San Diego, California, with fiberglass reinforced plastic (FRP) piles to improve durability and reduce environmental impact. A minimum of 123 fender piles will be removed and replaced at the Deperming Pier, with an additional three fender piles at Pier 5002, and up to 192 timber piles total may be replaced across both locations. Alongside this, 38 dolphin piles will be removed and replaced, and 28 new piles will be installed within the Electro Roll Magnetic Garden to support operational and structural needs. The work is being managed by the Regional Water Quality Control Board, Region 9 - San Diego, with environmental compliance as a central concern. The project is forecasted to be posted on July 16, 2026, and performance will occur at the 92106 zip code in San Diego. Primary point of contact is Alan Monji, Environmental Scientist, reachable via phone or email for coordination and inquiries.

General Info

Replace timber with FRP fender and dolphin piles at San Diego piers for durability and environmental compliance.

Agency

California → Regional Water Quality Control Board, Region 9 - San Diego

Place of Performance

ROSECRANS AND TAYLOR RD, San Diego, CA, 92106

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Regional Water Quality Control Board, Region 9 - San Diego
Contacts1 person available
OfficeN/A
Organization / Agency
California → Regional Water Quality Control Board, Region 9 - San Diego
Office AddressN/A
Contacts
Alan Monji- RWQCBENVIRONMENTAL SCIENTIST

Full Description

Show more
The Discharger proposes to remove and replace a minimum of 123 fender piles at the Deperming Pier and three fender piles at Pier 5002. Timber piles will be replaced with fiberglass reinforced plastic (FRP) piles. Up to a maximum of 192 timber piles will be removed and replaced. The project includes the removal and replacement of 38 dolphin piles and the installation of 28 additional piles within the Electro Roll Magnetic Garden.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Federal
Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island.
Solicitation # W912WJ27X1CUP
The U.S. Army Corps of Engineers, New England District, is seeking information from small and large businesses for a dredging project in Providence, Rhode Island, under NAICS code 237990. The project is estimated to cost between $80,000,000 and $100,000,000, with a solicitation expected around March 15, 2027. Construction is scheduled to begin in September 2027 and last approximately two years, spanning two dredging seasons from September 1, 2027, to August 31, 2029. The work is divided into two primary sequences: the construction of a new Confined Aquatic Disposal (CAD) cell at Edgewood Shoals North, including an access channel, and the subsequent maintenance dredging of the Providence River and Harbor Federal Navigation Project to a depth of -40 feet MLLW plus two feet of allowable overdepth. The total scope involves mechanically dredging approximately 5,500,000 cubic yards of material using closed clamshell buckets. Specifically, 3,200,000 cubic yards will be removed to create the CAD cell, with material placed at Port Edgewood Basin, Fox Point Reach CAD cells, Prudence Island, and the Rhode Island Sound Disposal Site. The remaining 2,300,000 cubic yards of maintenance material will be placed within the newly constructed Edgewood Shoals North CAD cell. To meet strict environmental windows and project timelines, the contractor must maintain a production rate of at least 300,000 cubic yards every 30 calendar days, operating 24 hours a day, 7 days a week. Interested firms must submit a capabilities package by November 26, 2026, demonstrating experience with these production rates and open water placement in New England during winter months.
W2SD Endist New England

POSTED

about 2 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
San Vicente and Mt. Olivette Reservoir Improvements Project - Construction
Solicitation # SP2797-CT
The San Vicente and Mt. Olivette Reservoir Improvements Project (SP2797-CT) is a construction solicitation issued by the City of Santa Monica Public Works Engineering Division. The project involves comprehensive upgrades and improvements to the San Vicente and Mt. Olivette reservoirs, with an estimated contract value of $27,344,000. Bidders are required to hold a Class A General Engineering license. The scope of work includes civil, structural, and electrical improvements, such as the installation of flexible expansion joints, meter and valve vaults, and concrete-lined swales, as well as cathodic corrosion protection and SCADA integration. The contract specifies a performance period of 730 calendar days, though the sample contract mentions substantial completion within 520 calendar days from the Notice to Proceed. Bids must be submitted electronically via the OpenGov portal by November 5, 2026, at 3:00 pm. Key requirements include the provision of Labor and Material Payment and Performance Bonds for 100% of the contract sum, compliance with prevailing wages, and adherence to the Santa Monica Living Wage Ordinance. Liquidated damages for delays are set at $13,200 per day. The project is subject to rigorous inspection standards, including ASTM and CBC requirements, with the Prime Contractor responsible for contracting and billing Enterprise Automation for specific integration services.
D500 PUBLIC WORKS - ENGINEERING DIVISION

POSTED

about 15 hours ago

DEADLINE

in 8 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS