This Solicitation opportunity from Department Of Defense was posted on June 2, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Weeks Brook Bridge Railing Repair, Franklin Falls Dam, Sanbornton, NH
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The U.S. Army Corps of Engineers - New England District is preparing to solicit bids for the Weeks Brook Bridge Railing Repair project located at Franklin Falls Dam in Sanbornton, New Hampshire. The contract work involves the complete removal of existing bridge railings and posts, followed by the installation of a new railing system anchored to the bridge superstructure as specified in the project drawings. The new components must meet New Hampshire Department of Transportation standards, with particular attention to the connection details which will be unique to this project. The estimated contract value falls between $25,000 and $100,000, and the opportunity is specifically set aside for small business vendors under the NAICS code 237310, with a size standard of $45 million. Solicitation documents and submission instructions will be available online around May 18, 2026, exclusively through the SAM.gov website. No questions will be addressed during the presolicitation phase; inquiries should be directed to the contract specialist after the solicitation posting. All interested vendors must have an active SAM.gov registration at the time of submission to be considered responsive. This project emphasizes compliance with federal acquisition regulations for small business set-asides and mandates strict adherence to specified procedural requirements for obtaining and submitting the solicitation package.
General Info
Agency
NAICS
Place of Performance
MASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
THE WORK CONSISTS OF: The Contractor shall furnish all labor, materials, and equipment for the complete removal of the existing bridge railing and posts at Weeks Brook Bridge. The work includes the installation of a new railing system, anchored to the superstructure as detailed in the contract drawings. The new railing posts and guardrails shall conform to the standard details and specifications of the New Hampshire Department of Transportation (NHDOT). However, the connections of these components to the existing bridge superstructure shall be executed in accordance with the project-specific designs.
The magnitude of construction is between $25,000 and $100,000. For additional information on construction contracts awarded to small businesses please visit: Partnering With Us (army.mil)
This procurement is set-aside for small business vendors. The applicable NAICS code is 237310 with a Small Business Size Standard of $45 Million.
ALL VENDORS MUST HAVE AN ACTIVE REGISTRATION IN SAM.GOV AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDERED. ANY VENDOR THAT DOES NOT HAVE AN ACTIVE SAM.GOV REGISTRATION WILL BE REJECTED AS NON RESPONSIVE.
