Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Wilshire and Cloverdale Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Wilshire and Cloverdale Project is a mixed-use development located on a 1.4-acre site in Los Angeles, California, spanning 5350-5376 Wilshire Boulevard, 706-716 Cloverdale Avenue, and 721-725 Detroit Street. The project involves the construction of a 46-story tower with a total floor area of 420,201 square feet, featuring 419 residential units, including 47 units for Extremely Low-Income households, and 2,645 square feet of ground-floor restaurant space. A key component of the development is the preservation of four existing buildings that contribute to the Miracle Mile Historic District, including Los Angeles Historic-Cultural Monument No. 451, while removing existing surface parking and 6,137 square feet of rear additions. The project is subject to extensive environmental oversight under the California Environmental Quality Act, with a Draft Environmental Impact Report analyzing impacts on air quality, greenhouse gas emissions, transportation, and utility infrastructure. Key requirements include compliance with LADOT and ADA standards for pedestrian access, the implementation of a Stormwater Pollution Prevention Plan, and adherence to SCAQMD Rule 1146.2. Specialized oversight is required for paleontological and archaeological resources, including the use of qualified professionals to monitor excavations and the adherence to AB 52 confidentiality protocols regarding tribal cultural resources. Construction is also subject to strict noise and vibration monitoring, with requirements to halt activity and conduct structural inspections if specific vibration thresholds are exceeded.

General Info

46-story mixed-use tower with 419 units, 47 affordable, commercial space, historic preservation, 1.4 acres, Los Angeles.

Place of Performance

Wilshire Boulevard, Cloverdale Avenue, Detroit Street, Los Angeles, CA, 90036

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Los Angeles
Contacts3 people available
OfficeN/A
Office AddressN/A
Contacts
Erin StrelichCity Planning Associate
Stephanie Eyestone-JonesOwner

Interested Companies (1)

CEQA ConsultantEl Segundo, CA

Full Description

Show more
The Wilshire and Cloverdale Project (Project) would construct a 46-story tower with 419 residential units, including 47 units for Extremely Low-Income households, and 2,645 square feet of ground floor restaurant uses. The Project would retain four existing buildings designated as contributors to the Miracle Mile Historic District, containing 42,092 square feet of commercial uses and including Los Angeles Historic-Cultural Monument (HCM) No. 451; and remove existing surface parking and 6,137 square feet of rear additions to these buildings. At completion, the Project would result in a total floor area of 420,201 square feet, on an approximately 1.4-acre site.

Similar Contracts

Same NAICS industry code

NAICS: 236116
New
SLED
RFQ.RFP #2-2627 Saw Mill Rd Affordable Housing Project
Solicitation # 2-2627
The Town of Guilford is seeking competitive proposals from qualified firms to develop affordable housing on an 11.33-acre parcel of land located on Saw Mill Road, identified as parcel Map 79 Lot 9, zone R-5. The project, which adjoins Hubbard Park in the West River area, requires a comprehensive development concept including zoning approach, density, unit types, affordability goals, energy efficiency strategies, and a detailed financing model. Proposals must be submitted by December 1, 2026, and include a statement of interest, applicant qualifications from the past ten years, a project team organizational chart with resumes, property management experience, and at least three professional references. A fee proposal must be submitted in a separate sealed envelope. Award selection is based on a 100-point scale evaluating the quality of the response, the firm's capacity to provide services, professional reputation, and financial resources. Bonus points are available for expanded commitments to sustainability and affordability, such as ensuring 25% of households are at or below 50% AMI or achieving Zero Energy Ready and EnergyStar certifications. The contract requires compliance with the Little Miller Act for payment bonds on projects over $100,000 and adherence to Connecticut prevailing wage laws for public works. Additionally, respondents must provide an Affirmative Action/EEO Affidavit and a Non-Collusive/Non-Conflict Affidavit, certifying compliance with the Americans with Disabilities Act and the Guilford Code of Ethics.
Town of Guilford

POSTED

1 day ago

DEADLINE

in 25 days
View Details
NAICS: 236116
New
SLED
City of Flagstaff Public Housing Siler Site Scope of Work
Solicitation # 2027-563
The City of Flagstaff is seeking qualified co-developers for the redevelopment of the Siler Homes public housing site as part of a broader effort to address a declared housing emergency and fulfill the goals of the Flagstaff 10-Year Housing Plan. The project aims to utilize the HUD Rental Assistance Demonstration (RAD) program to transform the existing 100-unit public housing development into a mixed-income neighborhood. The primary objective is to more than double the total number of residential units while integrating community spaces, administrative offices, and Headstart facilities, all while minimizing the relocation of current residents. Under solicitation number 2027-563, the selected developer will be responsible for the design, financing, and construction of the site. Proposals must include a comprehensive site concept, a detailed project timeline through occupancy, and a financial plan identifying funding sources and any requested City participation. The project must comply with various federal and state regulations, including the Fair Housing Act, ADA Section 504, NEPA, and the Davis-Bacon Act. The contract will be awarded to the highest-scoring proposal, with a response deadline of February 2, 2027. All agreements will be governed by the laws of the State of Arizona and the regulations of the City of Flagstaff.
Housing - Administration

POSTED

2 days ago

DEADLINE

in 3 months
View Details
NAICS: 236116
SLED
Pasteur Court Apartments - 33-Unit Affordable & Supportive Housing
Solicitation # 20261028041
Pasteur Court LP is soliciting proposals for preconstruction and construction services to develop the Pasteur Court Apartments, a 33-unit affordable and supportive housing community in Ventura, California. The project consists of a three-story, U-shaped residential building featuring 30 one-bedroom units and 3 two-bedroom units, including a manager's unit, along with approximately 2,838 square feet of common areas such as a community room and supportive services offices. Key project requirements include CALGreen compliance, Green Point Gold Rating, and adherence to California Tax Credit Allocation Committee (TCAC) standards. Sustainability goals include solar PV targeting 100% energy offset, EV charging, and Dark Sky-compliant lighting. At least 15% of the units must be fully accessible. The contract will be awarded based on a weighted point system evaluating firm capacity, project team experience, past performance, and the proposed Guaranteed Maximum Price (GMP). The project will be delivered via a Cost of the Work Plus a Fee with a GMP on a 100% open-book basis, utilizing AIA A102-2017 and A201-2017 documents. Construction is anticipated to begin in March 2027 with an estimated 22-month duration, targeting completion by February 2029. Selected contractors must provide performance and payment bonds for 100% of the contract sum and hold a California CSLB Class B license. Proposals are due by November 18, 2026, and must include a detailed plan for site security and staging due to the project's proximity to occupied housing.
Pasteur Court LP

POSTED

8 days ago

DEADLINE

in 12 days
View Details

More opportunities from California → City of Los Angeles

Same awarding agency

NAICS: 237310
SLED
City of Los Angeles Sidewalk Repair Program (Project)The City of Los Angeles Sidewalk Repair Program is a citywide initiative covering approximately 467 square miles, designed to improve accessibility for persons with mobility disabilities in compliance with local, state, and federal requirements. This project is implemented pursuant to the Willits Settlement and is governed by ordinance LAMC 62.104.1, which streamlines the review and approval process for sidewalk repairs. The scope of work includes curb ramp repairs, crosswalk paving, utility work, and comprehensive street tree management involving retention, removal, replacement, canopy pruning, and root pruning. The program is scheduled to include applicable utility work for a duration of 30 years. To facilitate efficiency, the new ordinance establishes parameters for ministerial approvals to avoid further environmental reviews for most repairs, while providing a streamlined discretionary process for projects falling outside those parameters or those involving the removal of three or more street trees. The project adheres to Mandatory Project Design Features and a revised Street Tree Retention, Removal and Replacement Policy. Official approval was granted by the City Council and Mayor on August 6, 2026, following the certification of the Recirculated Environmental Impact Report and the 2021 Environmental Impact Report to fulfill California Environmental Quality Act requirements. The primary point of contact for the program is Environmental Supervisor II Lauren Rhodes.
Highway, Street, and Bridge Construction

POSTED

21 days ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS