Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Wireless Communications Tower Upgrades– Harbor Development Permit No. 26-031

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This forecast project involves Verizon Wireless upgrades to ground-based and tower-mounted equipment at the Port of Long Beach, California, under Harbor Development Permit No. 26-031. Tower modifications include the installation of three sector mounts, one standoff mount, one microwave dish, fifteen antennas, three remote radio units, over-voltage protection, outdoor units, and cabling. Ground-level improvements consist of installing power and battery cabinets, a generator with a tank, an emergency stop button, an ILC/ATC cabinet, and a GPS antenna. Additional infrastructure includes an H-frame extension, a fiber junction box, a telco vault, a fire knox padlock, and an LED lamp. The site will also be secured with a chain link fence measuring approximately 28 by 14 feet and a rolling gate.

General Info

Verizon Wireless equipment and infrastructure upgrades at Port of Long Beach, California.

Agency

California → Long Beach, Port of

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

Long Beach, CA

Set-Aside

NONE

Documents

(1)

Notice of Exemption for Wireless Communications Tower Upgrades HDP 26-031

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Long Beach, Port of
Contacts2 people available
OfficeN/A
Organization / Agency
California → Long Beach, Port of
Office AddressN/A
Contacts
Arvin NorouziAgent Manager

Full Description

Show more
Verizon Wireless upgrades to modify ground-based and tower-mounted equipment. Tower-mounted equipment upgrades involve installing up to three (3) sector mounts, one (1) standoff mount, one (1) microwave dish, fifteen (15) antennas, three (3) remote radio units, three (3) over-voltage protection, two (2) outdoor units, and four (4) cables on tower. Ground-work consists of installing up to one (1) battery cabinet, one (1) power cabinet, one (1) generator with tank, one (1) emergency stop button, twelve (12) batteries, one (1) ILC/ATC cabinet, one (1) GPS antenna, one (1) H-frame extension, one (1) fiber junction box, one (1) telco vault, one (1) fire knox padlock, one (1) LED lamp, one (1) chain link fence, approximately 28-feet long by 14-feet wide and 9-feet tall, and (1) rolling gate, approximately 11-feet long and 9-feet tall.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
Federal
SOURCES SOUGHT ANNOUNCEMENT / INDUSTRY DAY FOR SENTINEL UTILITY CORRIDOR AT MALMSTROM AIR FORCE BASE, MONTANA
Solicitation # W9128F26SM024
The U.S. Army Corps of Engineers, Omaha District, is conducting a Sources Sought announcement for the Sentinel Utility Corridor project at Malmstrom Air Force Base, Montana. This high-value initiative has an estimated magnitude between $1.4 billion and $2.0 billion and will be executed using a Progressive Design-Build (PDB) framework under Other Transaction Authority (OTA) per 10 U.S.C. § 2808a. This non-traditional acquisition method bypasses standard Federal Acquisition Regulation (FAR) clauses in favor of custom-negotiated Agreement Articles and commercial practices. The project is structured in two primary phases: Agreement Phase 1, focusing on design and preconstruction, and Agreement Phase 2, covering final design and construction. The selection process utilizes a Qualifications-Based Selection (QBS) methodology, prioritizing team composition, past relevant experience, technical approach, problem-solving abilities, and innovation over price. Award is based on a trade-off process to identify the most qualified design-builder, with pricing negotiated after technical selection. Key deliverables include phased design packages (35%, 65%, and 100%), open-book cost estimates, and final facility turnover. Interested parties must submit an Industry Questionnaire via the provided portal and may submit a Statement of Qualifications (limited to 20 pages) or an optional Capability Statement (limited to 12 pages) by the response deadline of September 24, 2026.
W071 Endist Omaha

POSTED

about 24 hours ago

DEADLINE

in about 1 month
View Details