Wireless Communications Tower Upgrades Harbor Development Permit No. 26-031
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This forecast project involves Verizon Wireless upgrades to ground-based and tower-mounted equipment at the Port of Long Beach, California, under Harbor Development Permit No. 26-031. Tower modifications include the installation of three sector mounts, one standoff mount, one microwave dish, fifteen antennas, three remote radio units, over-voltage protection, outdoor units, and cabling. Ground-level improvements consist of installing power and battery cabinets, a generator with a tank, an emergency stop button, an ILC/ATC cabinet, and a GPS antenna. Additional infrastructure includes an H-frame extension, a fiber junction box, a telco vault, a fire knox padlock, and an LED lamp. The site will also be secured with a chain link fence measuring approximately 28 by 14 feet and a rolling gate.
General Info
Agency
NAICS
Place of Performance
Long Beach, CASet-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
