Work Order 15 for the SisTel Broadband Capital Oversight Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Work Order 15 of the SisTel Broadband Capital Oversight Project involves the installation of a 4-way microduct carrying two 288-count fiber optic cables—one for the California Department of Technology and one for Siskiyou Telephone Company—with two spare ducts remaining, stretching approximately 89 miles along key roads in Siskiyou and Humboldt Counties. The project includes rock saw trenching, open trenching, and horizontal directional drilling to place the conduit approximately 4 to 8 inches from the pavement edge or within the shoulder, avoiding sensitive environmental areas as directed by Caltrans, Humboldt County, and Six Rivers National Forest. Access vaults or handholes will be installed every 1,500 to 2,400 feet, with every fifth vault enlarged for splicing, and all will be flush with or buried beneath the ground. Pullboxes may be added near vaults at roughly one-mile intervals, and fiber cables will be mounted on existing bridges where feasible. Marker posts made of fiberglass will be placed at mile intervals, and all numbering will be clearly labeled in black on orange backgrounds. Construction will occur primarily within existing right-of-way, with a temporary corridor of up to 30 feet narrowing to a permanent 10-foot width centered on the conduit. Staging areas for equipment and materials will utilize existing land without new grading or vegetation removal, and erosion controls like silt fences will be implemented if bulk materials are stored on-site. This project supports the statewide Middle-Mile Broadband Network initiative established under California Senate Bill 156, signed into law in July 2021, which aims to provide universal high-speed broadband access across the state. By laying critical backbone infrastructure along state and county roads, the project enables connectivity to last-mile networks that deliver internet service to homes, businesses, schools, and public institutions in underserved rural communities. The work directly addresses the lack of middle-mile infrastructure that has historically hindered broadband deployment in remote regions of Northern California. Managed by Caltrans District 1 and coordinated with Siskiyou Telephone Company, the project is deemed to have independent utility and qualifies for a CEQA exemption and NEPA categorical exclusion. It is part of a broader state effort to ensure all Californians have affordable, reliable high-speed internet, fulfilling a foundational goal of digital equity and economic inclusion.

General Info

Install 89-mile fiber optic microduct with two cables for state and telecom, avoiding environmental zones, within existing rights-of-way.

Agency

California → Caltrans, District 2 - Redding

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

Noe-Sistel Broadband Work Order 15 Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 2 - Redding
Contacts3 people available
OfficeN/A
Organization / Agency
California → Caltrans, District 2 - Redding
Office AddressN/A
Contacts
Stephen CrawfordProject Manager

Full Description

Show more
The SisTel Broadband Capital Oversight Project is part of the statewide Middle-Mile Broadband Network (MMBN) project which would install about 10,000 miles of broadband infrastructure across the State of California. The SisTel Broadband Capital Oversight Project is located within Siskiyou and Humboldt counties, California and extends approximately 89 miles along portions of State Route (SR) 3, SR 96, SR 263, Salmon River Road, Sawyers Bar Road, Hawkinsville-Humbug Road, Humbug Creek Road, Klamath River Road, Quartz Valley Road, and various streets in the city of Yreka. Work Order 15 of the SisTel Broadband Capital Oversight Project has been determined to meet the CEQA and NEPA definitions for independent utility and is considered as a standalone project. This CEQA Exemption / NEPA Categorical Exclusion Determination Form addresses Work Order 15 (i.e., the Project) which is located on SR 96 in Humboldt County. The Project is on land managed by Caltrans District 1, Humboldt County, and Six Rivers National Forest. The Project would involve the construction and installation of one (1) 4-way microduct owned by the California Department of Technology (CDT) with two (2) 288-count Loose Tube Fiber Optic Outdoor Cable 12 Element All Dielectric Dry Core Design MiDia®200 Micro GX microfiber cables (one [1] each for CDT and Siskiyou Telephone Company [STC]) maintained by STC leaving two (2) spare ducts. Installation would involve rock saw trench, open trench, and horizontal directional drilling (HDD). The new conduit would be placed approximately 4–8 inches off the edge of the pavement, or within the outside paved shoulder when the terrain or environmental conditions are not suitable, unless adjustments are necessary to avoid sensitive resources or per the requirements of approving agencies (e.g., Caltrans, Humboldt County, Six Rivers National Forest). Access vaults or handholes would be installed approximately every 1,500–2,400 feet. Vaults are typically 30 inches by 48 inches by 36 inches. However, every fifth vault may be larger for splicing (48 inches by 48 inches by 48 inches). Vaults would be flush with the ground or buried. Separate Caltrans pullboxes may be installed adjacent to vaults spaced approximately 1 mile apart. Where available and applicable, the fiber optic cable would be attached to existing bridges to span across rivers and streams. Cable marker posts may be installed at approximately 1-mile intervals to note the presence of fiber optic cable. The markers would be made of fiberglass and would be either flat or in the dimensions of 4 inches by 4 inches by 8 feet. All route and handhole numbers would be in black on an orange background, self-adhesive, and 1 inch in height. The construction corridors would typically be confined to existing right of way (ROW), up to approximately 30 feet wide. Once construction is completed, the permanent ROW would be reduced to a 10-foot width, extending 5 feet on either side of the conduit centerline. Multiple locations have been identified as potential staging areas for the project. The staging areas are locations adjacent to or near the project alignment that would be used for staging and storage of construction equipment and materials (e.g., vehicles, trailers, cable and duct reels, vaults, bulk materials). No new roads or road improvements would be required for the establishment of the staging areas, and no grading or removal of woody vegetation within the staging areas would be required. If bulk materials (e.g., rock, sand) are temporarily stored within the staging area, best management practices (BMPs) such as silt fences would be implemented to contain the materials and prevent erosion and runoff. Purpose: The Project would support the Middle-Mile Broadband Network project which will install the broadband infrastructure along the State Highway System (SHS) and County/City roads necessary to connect to a third-party operated Last Mile Broadband Network which will bring internet connectivity to homes, businesses, and community institutions. Need: In July 2021, California Governor Gavin Newsom signed into law Senate Bill (SB) 156 to create an open-access middle-mile network to bring high-speed broadband service to all Californians. The lack of available middle-mile broadband infrastructure has been a major issue in connecting California’s communities. The statewide open-access middle-mile network included in SB 156 is a foundational investment to ensure every Californian has access to broadband Internet service that meets the connectivity needs of today, and well into the future. This project intends to support providing critical statewide broadband infrastructure to enhance access to and increase the affordability of high-speed internet for all Californians.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
UTILITY & BACKUP POWER INDEPENDENCE, MISSION CONTROL STATION
Solicitation # utility-backup-power-independence-mission-control-station
The contract seeks small businesses to deliver comprehensive multi-disciplined support services for the construction and ongoing maintenance of an independent backup power plant at a facility in Colorado. The scope encompasses a wide range of critical systems including plumbing, HVAC, fire suppression, mechanical equipment and piping, electrical controls, telecommunications, fire alarm systems, lightning protection, cybersecurity, security escorts, and system commissioning, with a specific emphasis on generator infrastructure. All work is to be performed under a Small Business Set Aside, open exclusively to SBA-certified entities such as Small Businesses, Small Disadvantaged Businesses, Women-Owned Small Businesses, HUBZone Small Businesses, Veteran-Owned Small Businesses, and Service-Disabled Veteran-Owned Small Businesses. The NAICS code 237130 indicates this is a construction-related procurement focused on utility system installation. The solicitation was posted on August 10, 2026, with a mandatory response deadline of September 1, 2026. The contracting entity is BSGI-Weston JV, LLC, and all inquiries should be directed to Erica Vecchio, the primary point of contact, via email or phone. Performance is limited to Colorado, and the project is mission-critical, requiring integration of physical security, cyber protection, and operational reliability for a mission control station. Participation is restricted to certified small business concerns meeting specified SBA designations, and the contract aims to ensure long-term, self-sufficient power resilience through skilled, vetted small business partners.
BSGI-Weston JV, LLC

POSTED

about 7 hours ago

DEADLINE

in 21 days
View Details
NAICS: 237130
New
Federal
ADOT SR303 EXTENSION PROJECT (LIBERTY ¿ LONE BUTTE, LIBERTY ¿ PHOENIX 230-kV TRANSMISSION LINE)The Western Area Power Administration, under the U.S. Department of Energy, has forecasted a future acquisition for the ADOT SR303 Extension Project, which involves the construction of a 230-kV transmission line spanning from Liberty to Lone Butte and from Liberty to Phoenix. This project falls under NAICS code 237130, indicating it is related to electric power transmission and distribution system construction. The anticipated work will support transmission infrastructure expansion to meet regional energy demands and enhance grid reliability. The contract is not yet solicited, with the forecast posted on August 10, 2026, and no solicitation number or set-aside details available at this time. The place of performance is located in Arizona, though specific city and zip details are not provided. Small business outreach is supported through two designated Small Business Program Managers, both reachable via email at tetrault@wapa.gov and setzel@wapa.gov, who are the primary contacts for inquiries and engagement. The project is part of broader efforts by the Department of Energy to modernize and expand the national power transmission network. No information is available regarding contract value, timeline, or anticipated award date, but the forecast suggests this opportunity is in the planning phase. Interested parties should monitor official DOE channels for the upcoming solicitation.
Western Area Power Administration

POSTED

about 13 hours ago

DEADLINE

N/A
View Details
NAICS: 237130
New
Federal
Tracy 500kV Substation Shunt Cap Breaker and Switch Replacement Bay T8The Western Area Power Administration, under the Department of Energy, has forecasted a procurement for the replacement of the shunt capacitor breaker and switch in Bay T8 at the Tracy 500kV Substation. This project involves the upgrade of critical high-voltage infrastructure to ensure continued reliability and operational efficiency of the transmission system. The work is classified under NAICS code 237130, indicating it falls within the electric power transmission and distribution construction sector, and will require specialized electrical and substation construction expertise. The contract is not yet solicited, with a posted date of August 10, 2026, suggesting it is in the planning phase ahead of a future competitive bidding process. Small business engagement is a key focus, as indicated by the designation of two Small Business Program Managers as primary points of contact, both reachable via email through the Western Area Power Administration. No specific set-aside type has been designated, and there is no information yet on the physical location of performance beyond the substation site in Tracy. The contract will likely demand adherence to strict safety and operational protocols typical of high-voltage substation work, and interested parties should monitor official channels for the eventual solicitation, as details on scope, timeline, and requirements will be formally released in a future procurement notice.
Western Area Power Administration

POSTED

about 13 hours ago

DEADLINE

N/A
View Details