Work Order 15 for the SisTel Broadband Capital Oversight Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Work Order 15 of the SisTel Broadband Capital Oversight Project involves the installation of a 4-way microduct carrying two 288-count fiber optic cables—one for the California Department of Technology and one for Siskiyou Telephone Company—with two spare ducts remaining, stretching approximately 89 miles along key roads in Siskiyou and Humboldt Counties. The project includes rock saw trenching, open trenching, and horizontal directional drilling to place the conduit approximately 4 to 8 inches from the pavement edge or within the shoulder, avoiding sensitive environmental areas as directed by Caltrans, Humboldt County, and Six Rivers National Forest. Access vaults or handholes will be installed every 1,500 to 2,400 feet, with every fifth vault enlarged for splicing, and all will be flush with or buried beneath the ground. Pullboxes may be added near vaults at roughly one-mile intervals, and fiber cables will be mounted on existing bridges where feasible. Marker posts made of fiberglass will be placed at mile intervals, and all numbering will be clearly labeled in black on orange backgrounds. Construction will occur primarily within existing right-of-way, with a temporary corridor of up to 30 feet narrowing to a permanent 10-foot width centered on the conduit. Staging areas for equipment and materials will utilize existing land without new grading or vegetation removal, and erosion controls like silt fences will be implemented if bulk materials are stored on-site. This project supports the statewide Middle-Mile Broadband Network initiative established under California Senate Bill 156, signed into law in July 2021, which aims to provide universal high-speed broadband access across the state. By laying critical backbone infrastructure along state and county roads, the project enables connectivity to last-mile networks that deliver internet service to homes, businesses, schools, and public institutions in underserved rural communities. The work directly addresses the lack of middle-mile infrastructure that has historically hindered broadband deployment in remote regions of Northern California. Managed by Caltrans District 1 and coordinated with Siskiyou Telephone Company, the project is deemed to have independent utility and qualifies for a CEQA exemption and NEPA categorical exclusion. It is part of a broader state effort to ensure all Californians have affordable, reliable high-speed internet, fulfilling a foundational goal of digital equity and economic inclusion.
General Info
Agency
NAICS
Place of Performance
CASet-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
