Z--Notice of Intent to Sole Source
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The National Park Service intends to award a sole source procurement to E. Smith Heating & Air Conditioning, Inc. for the replacement of HVAC systems in the historic Ebenezer Baptist Church at the Martin Luther King Jr. National Historical Park, a structure built in 1922 and central to the park’s exhibits. The contract involves installing three new 3-ton Carrier HVAC systems in the church’s attic, including integration with existing ductwork, new refrigerant lines, electrical disconnects, programmable thermostats, condensate drainage, and system commissioning. All equipment must be Carrier-branded and include specific models such as the 27SCA560A005 heat pump, FJ5ANXD60L00 air handler, and FF-3001F15 heat strip, along with Redlink internet connectivity and central de-humidification where applicable. The work must comply with the International Building Code, ASHRAE standards, NFPA 101, NEC, OSHA regulations, and other applicable federal, state, and local codes, while ensuring all affected areas are restored to their original condition. The contractor is responsible for all travel, mobilization, and associated costs, and must submit a detailed safety plan approved before work begins, using environmentally compliant cleaning products and refrigerants per EPA guidelines. The installation includes a five-year compressor warranty, one-year parts and labor warranty, and manufacturer warranties, with required submittals, warranty documentation, and a quality assurance program to ensure compliance with commercial standards. This procurement is being conducted under the Revolutionary FAR Overhaul and FAR 6.103-2 as a sole source action, with no formal solicitation issued. Any firm wishing to challenge the sole source determination must submit a written interest letter by June 11, 2026, at 1:00 PM Eastern Daylight Time, demonstrating an equivalent capability to perform the work, with sufficient detail to prove qualification. Responses must be sent to Edward Dingle at edward_dingle@ios.doi.gov, and the government retains full discretion on whether to open the contract for competition based on received submissions. The North American Industry Classification System code for this procurement is 238220. The government is not obligated to award a contract, nor will it reimburse any costs incurred by respondents. No electrical wiring to panels or subpanels, structural modifications, or significant carpentry, drywall, or painting work is included beyond minimal access requirements
General Info
Agency
NAICS
Place of Performance
GASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Information received will be considered solely for the purpose of determining whether to conduct a competitive procurement. This notice in no way obligates the Government to award any contract nor is the Government responsible for any costs incurred by responding to this notice.
Required Services:
The work is to be done at the Martin Luther King Jr. National Historic Park Historic Ebenezer Church. This building supports the operations of the Martin Luther King Jr. National Historical Park district. This structure was built in 1922 in the neighborhood where Dr. Martin Luther King Jr. was born, it is a part of one of the parks main exhibits.
1. PROJECT OVERVIEW The Contractor shall provide all necessary labor, materials, equipment, and supervision to install three (3) 3-ton HVAC systems in the attic of Ebenezer Baptist Church. Work will include integration with portions of the existing ductwork system, installation of electrical disconnects, refrigerant lines, controls, and commissioning of equipment.
2. EQUIPMENT TO BE FURNISHED The Contractor will provide the following equipment (quantities listed apply to each of the three systems):
¿ Model 27SCA560A005 ¿ 5 Ton Heat Pump ¿ Model FJ5ANXD60L00 ¿ Carrier Air Handler ¿ Model FF-3001F15 ¿ 15 kW Heat Strip ¿ Thermostats: THM5320R1000 / THM6000R7001/U / TH6320R004 ¿ Redlink Internet Interface ¿ Accessories as indicated ¿ Carrier brand components throughout ¿ Central de-humidification (if applicable)
3. WORK INCLUDED The Contractor shall perform the following tasks: Remove and dispose of existing units as required.
¿ Install three (3) new HVAC systems in attic.
¿ Utilize a portion of the existing supply-air duct system
¿ Modify existing ductwork where necessary
¿ Insulate return duct as required
¿ Install equipment pads
¿ Install new condensate gravity drain (pump as needed)
¿ Install new refrigerant line sets
¿ Install new disconnect switches (208/230V, single phase)
¿ Gas line work as needed
¿ Install programmable thermostats
¿ Perform system startup, testing, and commissioning
4. ELECTRICAL SCOPE
¿ Electrical wiring to be provided by others (not included in this quote)
¿ Contractor will install required new disconnect switches
¿ Final connections to existing power supply where applicable
5. EXCLUSIONS
¿ New electrical wiring to panels or subpanels
¿ Structural modifications
¿ Carpentry, drywall, or painting beyond what is required for access
6. WARRANTY & SERVICE The installation includes the following warranties:
¿ 5-Year Compressor Warranty
¿ 1-Year Parts Warranty
¿ 1-Year Labor Warranty
¿ Manufacturer warranties per product documentation
7. Equipment:
8. Green Ecofriendly Cleaning products, up to code refrigerant per EPA guidelines.
9. 7. Deliverables:
10. Provide product submittals for all equipment to be used
11. Provide project specific safety plan.
12. Provide one hard-bound copy of all warranty information.
13. 8. GOVERNMENT-FURNISHED PROPERTY, MATERIAL, EQUIPMENT, OR INFORMATION (GFP, GFM, GFE, OR GFI): N/A
14. 9. Safety:
15. This contractor is to follow at a minimum all OHSA rules and procedures. All Green products are recommended to continue all safety precautions to the environment. A required safety plan must be submitted and approved before any work is to begin. This plan shall identify any hazards related to the work and provide measures to follow to mitigate risk.
16. 10. Security: N/A
17. 11. Travel:
18. Contractor shall be responsible for all travel related expenses for this project, including mobilization of equipment, tools, materials, manpower, lodging, meals, and per diem.
19. 12. Special Material Requirements: N/A
20. List any special material requirements or write N/A.
21. 13. Other Unique Requirements: N/A
22. 14. Quality Assurance Requirement:
23. The contractor shall develop and maintain a quality program to ensure services are performed in accordance with commonly accepted commercial practices. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. As a minimum, the contractor shall develop quality control procedures addressing the critical areas identified in this statement of work. The government will periodically evaluate the contractor¿s performance in accordance with the statement of work.
All new equipment must conform to the
24. manufacturer¿s instructions and guidelines for installation and start-up.
25. While performing work, the contractor shall comply with the latest applicable versions of the following:
26. International Family of Codes, primarily the IBC (International Building Code)
27. American Society of Heating, Refrigeration, and Air-Conditioning Engineers (ASHRAE) Standards and Guidelines
28. National Environmental Balancing Bureau (NEBB)
29. Associated Air Balance Council (AABC)
30. NFPA 101 (National Fire Protection Association's Life Safety Code)
31. Federal, State and Local Building Codes, Standards and Policies
32. Local codes only if required by utility companies for service connections.
33. National Electrical Code (NEC)
34. Occupational Safety and Health Administration (OSHA) requirements
35. Additional Requirements:
36. All affected areas must be restored to their original condition from before the work began. Any damages will be fixed and repaired at no cost to the government.
37. All new equipment must conform to the manufacturer¿s instructions and guidelines.
More opportunities from Department Of The Interior → Ser East MABO(51000)
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS