Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Sources Sought opportunity from Department Of Veterans Affairs was posted on April 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

6515--Replace LEDs Pwr Supp ZMC sign (VA-26-00063679)

Closed
36C25226Q0435Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 339950
New
SLED
Parks Entrance Sign Rebranding
Solicitation # 20260259
The City of Port St. Lucie has issued Invitation for Bid 20260259 for the rebranding of 41 Parks and Recreation entrance signs. The project focuses on creating a unified visual identity across the park system by replacing topper and middle panels on existing sign structures. The scope of work includes the fabrication of high-density urethane panels, painting with specific PMS color matching and satin finishes using Matthews Paint products, and the addition of park establishment dates. The project involves various sign types, including single-face and double-face neighborhood and community signs, as well as a specialized panel for Jessica Clinton Community Park. The initial contract term is 180 calendar days, with work permitted from 7:00 a.m. to sundown, Monday through Friday. Bids must be submitted electronically via the OpenGov portal by October 8, 2026, at 3:30 p.m. Requirements for submission include a bid bond of at least 5 percent of the bid total, which can be submitted as a hard copy or an electronic bond through Surety2000. The City will award the contract based on the best value, considering cost, contractor capability, and local preference, though the lowest price is not the sole determining factor. Performance and payment bonds are required for projects exceeding 200,000 dollars. Payment is subject to a 5 percent retainage and follows the Florida Prompt Payment Act, with invoices submitted monthly. Contractors must also certify compliance with drug-free workplace laws, anti-human trafficking regulations, and Florida's scrutinized companies lists.
Parks & Recreation

POSTED

2 days ago

DEADLINE

in 26 days

AI Contract Overview

Show more

This notice is a sources sought announcement issued by the Department of Veterans Affairs through the 252-NETWORK Contract Office 12 for market research purposes only, with no intent to obligate funds or initiate a formal procurement at this time. The requirement seeks to assess the capability and interest of small businesses and other than small businesses, including verified Veteran-Owned Small Businesses (VOSB) and Service-Disabled Veteran-Owned Small Businesses (SDVOSB), to provide labor, equipment, and materials for the complete replacement of 486 LED modules and nine power supplies on the exterior signage at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. The work includes removal and disposal of existing components, installation of new 12-volt white LED modules spelling out “CLEMENT J. ZABLOCKI VA MEDICAL CENTER,” installation of new power supplies, system testing, jobsite cleanup, and full compliance with all applicable safety and facility regulations. The estimated performance period is 90 days following the Notice to Proceed, with work restricted to Monday through Friday, 7:00 AM to 3:30 PM, excluding federal holidays and weekends when a holiday falls on those days. Contractors must furnish all personnel, tools, equipment—including lift access—and materials without government support. All workforce members must be trained and directly employed by the contractor, under the continuous supervision of an on-site job superintendent. Subcontractors require prior approval from the Contracting Officer. Compliance with OSHA, NEC, NFPA, and local safety codes is mandatory, and all PPE and equipment must be OSHA-approved. Contractors are fully liable for any damage to government property and must repair or replace it at no cost. Strict security protocols apply: all personnel must be fingerprinted, complete a Site Access Certification form, and obtain a VA-issued PAC badge valid for 90 days; smoking and weapons are prohibited on campus; enclosed containers are subject to search; and parking is the contractor’s responsibility with no reimbursement allowed. Prework orientation on fire safety, infection control, disaster procedures, and security is required. Responses must be submitted via email to Vernise L. Newton by 8:00 AM Central Time on May 13, 2026, and must include business size status, relevant experience, and manufacturer authorization documents. VOSB and SDVOSB status must be verified in the VIP database to be eligible for set-aside consideration. No pricing is requested or required at this

General Info

Market research for LED signage replacement at Milwaukee VA Medical Center targeting VOSB/SDVOSB contractors.

Agency

Department Of Veterans Affairs → 252-NETWORK Contract Office 12 (36C252)View Agency

NAICS

339950 - Sign ManufacturingView NAICS

Place of Performance

5000 W National Avenue Milwaukee WI 53295, WI

Set-Aside

NONE

Documents

(1)

36C25226Q0435.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Response Deadline

Deadline has passed

Posted

Sources Sought

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 252-NETWORK Contract Office 12 (36C252)
Contacts1 person available
OfficeMILWAUKEE, WI, 53214, USA
Organization / Agency
Department Of Veterans Affairs → 252-NETWORK Contract Office 12 (36C252)
View Agency Profile
Office AddressMILWAUKEE, WI, 53214, USA
Contacts
Vernise L NewtonContract Specialist

Full Description

Show more
This Sources Sought Notice is for informational and planning purposes only and shall not be construed as a solicitation or as an obligation or commitment by the Government at this time. This notice is intended strictly for market research. The purpose of this Sources Sought notice is to determine interest and capability of Other than Small Businesses and/or Small Businesses, including VIP-Verified Veteran-Owned Small Business (VOSB) or Service-Disabled Veteran-Owned Small Business (SDVOSB) prospective contractors relative to the North American Industry Classification System (NAICS) Code 339950. This sources sought notice is to determine interest and capability of authorized vendors able to fulfill the following requirement: The Contractor shall provide labor, equipment and materials to replace all LEDs and power supplies in "Clement J. Zablocki VA MEDICAL CENTER" signage at the VA Medical Center (VAMC), 5000 W National Avenue Building 111, Milwaukee, WI 53295 in accordance with the Statement of Work. REPLACE LIGHT EMITTING DIODES (LEDs) AND POWER SUPPLIES FOR CLEMENT J. ZABLOCKI SIGNAGE STATEMENT OF WORK
The Contractor shall provide labor, equipment and materials to replace all LEDs and power supplies in Clement J. Zablocki VA MEDICAL CENTER signage at the VA Medical Center (VAMC), 5000 W National Avenue Building 111, Milwaukee, WI 53295 in accordance with the Statement of Work.
Item No. DESCRIPTION QTY UNIT UNIT COST TOTAL
1 Replace (486) four hundred and eighty-six LED modules and (9) nine power supplies
1 JB $__________ $__________
DESCRIPTION OF SERVICES
The Contractor shall:
Provide necessary equipment (lift) to access the existing Clement J. Zablocki VA MEDICAL CENTER signage. Remove and dispose of all existing LEDs and power supplies. Provide (9) nine new power supplies including all accessories. Provide (486) four hundred and eighty-six new 12 Volts White LEDs modules including all accessories. LED modules are required for ls: Letters Cle Letter m Letters en Letters t J. Letters Za Letters bl Letters oc Letters ki Letters VA Letter M Letters ED Letters IC Letters AL Letters CE Letters NT Letters ER Perform testing to verify proper operation of the signage for fully functional system. Use appropriate personal protective equipment (PPE). Ensure all work is performed by qualified personnel. Clean up jobsite.
PERIOD OF PERFORMANCE
Period of performance shall begin on the award date of the contract and continue until the Government determines that all deliverables described herein are complete. The estimated period of performance is 90 days after the Notice to Proceed (NTP). The exact dates are to be determined upon award and agreed upon by both the VA and the Contractor.
HOURS OF OPERATION
Normal hours of coverage are Monday through Friday from 7:00 AM to 3:30 PM, including federal holidays as listed below. Service/repairs may be performed outside of normal working hours.
Federal Holidays observed by the VAMC that are considered normal hours of coverage for this contract:
New Year s Day Birthday of Martin Luther King, Jr. Inauguration Day Washington s Birthday Memorial Day Juneteenth National Independence Day Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas Day
When one of the above designated Federal Holidays falls on a Sunday, the following Monday shall be observed as a Federal Holiday. When a Federal Holiday falls on a Saturday, the preceding Friday shall be observed as a Federal Holiday by United States Government agencies. If different times shall be needed, this shall be discussed and mutually agreed upon with the Zablocki VAMC Point of Contact (POC) and shall still be considered normal business hours. No work by the Contractor on Federal Holidays and no work on the weekend when the Federal Holiday is on the respective Monday or Friday shall be done.
COMPLIANCE WITH THE GENERAL SAFETY REGULATIONS
All Contractors and Subcontractors performing services for the Government shall comply with all Occupational Safety and Health Administration (OSHA), National Electrical Code (NEC) Latest Edition, National Fire Protection Association (NFPA) Latest edition, local, State, County Municipal Safety and Occupational Health Standards & codes and any other applicable rules and regulations. Also, all Contractors and Subcontractors shall be held responsible for the safety of their employees and any unsafe acts or conditions that may cause injury or damage to any persons or property within and around the work site area under this contract.
All ladders, scaffolding, tools, equipment, personal protective equipment, etc. shall be OSHA approved for the work to be performed. Contractor shall use caution signs as required by OSHA Regulations. Caution signs shall be on-site on commencement of Contract.
PROTECTION OF GOVERNMENT PROPERTY
During work execution, the Contractor shall take special care to protect Government property including furniture, walls, baseboards, and other surfaces. Accidental splashes shall be removed immediately. Damage resulting from the Contractor operations shall be repaired by the Contractor, including painting, refinishing, or replacement, if necessary, at no additional cost to the Government. The Contractor shall be responsible to meet OSHA/Safety requirements in the performance of the work. This shall include, but not limited to, taking all the necessary precautions to protect the patients, visitors, and/or staff at each location. The Contractor shall be held responsible for any injuries and /or damage, which may be caused as a result of the Contractors failure to adhere to these requirements.
PROTECTION OF GOVERNMENT PROPERTY
Extreme caution shall be exercised to prevent damage to the building and its contents. Any damage shall be reported to the COR immediately for appropriate action. Any damage caused by the contractor shall be repaired and/or replaced to the satisfaction of the VA at the Contractor s expense.
UNAUTHORIZED USE OF GOVERNMENT EQUIPMENT The Contractor shall not allow his/her employees, including Subcontractors employees, to open desk drawers, cabinets, or to use office equipment, including the use of non-pay telephones for any purpose other than a local emergency call.
The Contractor shall be responsible to provide all necessary equipment, tools, parts, and materials to perform the work. The Government shall not be obligated to provide any equipment, tools, parts, and materials to assist the Contractor in performing the work.
SECURITY REQUIREMENTS
The Contractor s employees shall wear visible identification and company uniforms, approved by the POC, at all times while on the premises of the VAMC. It is the responsibility of the Contractor to park in the appropriate designated parking areas. Information on parking is available from the VA Police Section or the POC. The VAMC shall not invalidate or make reimbursement for any parking violations of the Contractor under any conditions. Smoking is prohibited inside any buildings at the VAMC. Possession of weapons is prohibited. Enclosed containers, including tool kits, shall be subject to a search. Violations of VA regulations may result in citations answerable in the United States (Federal) District court, not a local district, state, or municipal court.
FACILITY CHECK-IN REQUIREMENTS
The Contractor shall be required to report to the Facilities Management Office Building 70 E-250 or the Graphics Center, Bldg 113 to check in for services performed under this contract. This check-in is mandatory.
VA Contact Person(s): POC: Plumbing & Electric Shop Supervisor Alternate POC: Plumbing and Electric Shop Work Lead Telephone Number & Extension: 414-384-2000 ext. 43931 414-384-2000 ext. 41032
Contractor Provide telephone number(s) to call for your service:________________ Provide name(s) of authorized contact person(s): _____________________________
REPORT OF SERVICES AND DEFECTIVE EQUIPMENT
Upon completion of inspection, any defects of other equipment needing repair or replacement shall be submitted to the Contracting Officer Representative (COR) prior to any work being performed outside of the general requirements.
PREWORK ORIENTATION The Contractor employees shall attend a pre-work orientation meeting prior to the commencement of work on site. The COR shall schedule this meeting and it shall include discussions of the following topics: (The VA shall provide information to the Contractor regarding these topics and shall document the meeting.)
Fire and Safety Infection Control Disaster Procedures Security
COMPETENCY OF PERSONNEL SERVICING EQUIPMENT
All work under this contract shall be performed by trained and experienced personnel directly employed by the Contractor. The Contractor shall assign a job superintendent who shall supervise and be directly responsible for the accomplishment of the work. The superintendent assigned shall physically remain at the job site at all times while all work is being performed
If subcontractor(s) are used, they shall be approved by the CO; the Contractor shall submit any proposed change in subcontractor(s) to the CO for approval/disapproval
IDENTIFICATION, PARKING AND VA REGULATIONS
The Contractor's FSEs shall always wear visible identification while on the premises of the VAMC. It is the responsibility of the contractor to obtain and pay for parking. The VAMC does not provide parking. The VAMC shall not invalidate or make reimbursement for parking violations or charges for the Contractor under any conditions. Effective January 1, 2019, smoking is prohibited on the Milwaukee VA Campus. Possession of weapons is prohibited. Enclosed containers, including tool kits, shall be subject to search. Violations of VA regulations may result in citation answerable in the United States (Federal) District Court, not a local district, state, or municipal court.
BADGES
All contractors working at Milwaukee VAMC shall be fingerprinted prior to being allowed to work on campus. The contractor shall submit required paperwork to get all non-badged employees fingerprinted and badged. Contractor ID badges can be obtained from PIV office typically 3-5 days after approved SAC form is received and fingerprints clear. ID badges are required for contractor employees working at VAMC Milwaukee.
Contractor
Furnish SAC form to each employee and subcontractor employee, regardless of how long they shall be on site and even if already badged and have them fill out the form. Blank SAC form is included as appendix to this specification. When form is legibly completed by hand, scan each form with file name as above then dash then employee name (e.g., 08 SAC FORM John Doe). Regarding SSN: last four only. Email form to VA project manager (a.k.a., COR)
VA and Requestor
VA COR signs form, then emails Fingerprinting Office (fingerprinting) and PIV Office (badging) of pending visit from person named, forwarding form as email attachment. Contractor/Requestor visits Fingerprinting/PIV Office, building 70, E-wing south, ground floor. VA Fingerprinting Office shall check to ensure proper form was received.
VA Processing
Fingerprinting begins background check process. Assuming background check allows, then within 3 to 10 business days, VA shall send to Contractor/Requestor notice that they may now obtain their Physical Access Control (PAC) badge. VA PIV Office staff take photo and issue PAC badge.
Badge Usage
Wear badge, readily visible, above waist level, not on head or hard hat, when on grounds doing work. Lanyards and clips are not included but may be purchased at Canteen Store. Superintendent shall inspect personnel badge (shall be visible). Badges allow keyless entry into restricted areas. Names, dates, and times of access are recorded by VA Police. Badges shall be valid for 90 days. The COR shall notify PIV office to extend badge access for another 90 days if appropriate. Badge wearer, not anyone else, shall get badge issues taken care of. For example, it is not allowed to hand over badge to superintendent to walk them down to FM or PIV for entering code on back of badge, into SAM box system. Violations may result in suspension or revocation of construction access.
RECORD RETENTION AND STORAGE
Federal Records related to this policy, regardless of medium, shall be created, maintained, and disposed of in accordance with the VHA Records Control Schedule (RCS) 10-1, General Records Schedule (GRS) or other NARA-approved records schedule, if applicable. Federal Records shall be stored per the National Archives & Records Administration (NARA) Facility Standards.
DEFINITIONS / ACRONYMS
Acceptance Signature VA employee who is authorized to sign-off on the ESR, which indicates that the PM has been concluded or is still pending completion, or that the Emergency Repair has been accomplished or is still in a pending status.
Authorization Signature the COR s signature; indicates that the COR accepts work status as stated on the ESR.
CO Contracting Officer
COR Contracting Officer s Representative
FSE Field Service Employee - A person who is authorized by the Contractor to perform services on the VAMC premises.
LED Light Emitting Diode
NARA - National Archives & Records Administration
POC Point of Contact
VAMC Department of Veterans Affairs Medical Center Place of Performance Equipment shall be delivered to the Clement J. Zablocki VA Medical Center. 5000 W National Avenue, Milwaukee WI 53295
Qualifications, capabilities, and experience for providing this product; Business size/Socioeconomic status; Memo or correspondence from manufacturer to distribute their products.
This is not a Request for Proposal/Quote or an announcement of a solicitation and no solicitation package exists at this time. Responses will be used solely for market research purposes of the Government. The Government will not pay for any materials provided in response to this notice and submissions will not be returned to the sender. VOSBs and SDVOSBs must be registered and verified in VIP for set-aside consideration. The applicable North American Industry Classification System (NAICS) Code for this requirement is 339950 responses should be submitted by e-mail to Vernise L. Newton at vernise.newton@va.gov. The information requested must be received no later than 8:00 am Central Standard Time on 05/13/2026.

More opportunities from Department Of Veterans Affairs → 252-NETWORK Contract Office 12 (36C252)

Same awarding agency

NAICS: 517111
New
Federal
FHCC Satellite TV Installation and Programming
Solicitation # 36C25226Q0706
The Department of Veterans Affairs Great Lakes Acquisition Center is soliciting quotes for the installation and annual programming of a DirecTV COM3000 Advanced Entertainment Platform system at the Captain James A. Lovell Federal Health Care Center in North Chicago, Illinois. The project involves upgrading television services in Building 133 to provide high-quality linear satellite and broadband over-the-top content for patients, staff, and visitors. Key technical requirements include the installation of 100 Pro:Idiom converter boxes and a system capacity of 92 channels, consisting of 86 cable channels and 6 in-house channels. The programming package must include DTV Locals, a Regional Sports Package, and a VIP Service Plan, supporting a total of 263 units. The contract structure consists of a base year running from September 15, 2026, to August 31, 2027, with four optional one-year extensions through August 31, 2031. Installation must be completed within 60 calendar days of the award. This is a HUBZONE Small set-aside procurement, and the government will evaluate quotes based on technical capability and the best benefit to the government, with preference given to SDVOSB/VOSB entities. All work must comply with OSHA, NFPA, and VA safety and infection control standards. Payments are processed monthly in arrears via electronic funds transfer through the Tungsten Network e-Invoicing system.
Wired Telecommunications Carriers

POSTED

1 day ago

DEADLINE

in 2 days
View Details
NAICS: 238290
New
Federal
Z1DA--Construction of Ogden Elevator Cab Interiors Jesse Brown Medical Center
Solicitation # 36C25226B0033_1
Solicitation 36C25226B0033 is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) to perform interior upgrades for four elevators—P-7B, P-8B, P-9B, and freight S-10B—located in Building 11B of the Ogden Pavilion at the Jesse Brown VA Medical Center in Chicago, Illinois. The project objective is to match the design of elevator cab P-6B, which features ViviGraphix Graphica Cairo Slate Blue panels, diamond finish stainless steel ceilings with 3,200K LED downlights, and Nurazzo tile flooring. The scope includes the potential raising of elevator sills and doors to ensure flush tile installation. The project magnitude is estimated between $250,000 and $500,000, with a total performance period of 154 calendar days from the notice to proceed. Award will be granted to the responsible bidder providing the lowest priced responsive bid. Bidders must provide a bid guarantee of at least 20 percent of the bid price and submit current Experience Modification Rate (EMR) data and OSHA 300/300a forms. The contractor is required to adhere to the Davis-Bacon Act wage determinations for Cook County and maintain compliance with ASME A17.1 safety codes for elevators and escalators. Strict infection control measures are required per the ICRA renewal permit, and all construction debris must be removed daily. Key administrative requirements include the submission of daily contractor production reports (VA Form 10101) and the provision of performance and payment bonds upon award.
Other Building Equipment Contractors

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS