Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

AIRFIELD - AF - KUNTZ AVE ROAD REPAIR

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of The Navy → Navfac HawaiiView Agency

NAICS

N/A

Place of Performance

USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Hawaii
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Navy → Navfac Hawaii
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
**Maximo WO# HJF4K9 (DESIGN)** Scope: Area from Kuntz bridge all the way to Kuntz back gate needs to be inspected/surveyed for proper drainage, Base course and sub-grade stability. Additionally, the curbs and gutters need to be replaced to ensure proper drainage. Prior to design, a Topographical study will need to be completed to ensure the future design and execution of this project meets environmental standards for water run off and Sub grade stability to withstand heavy vehicular traffic. Justification: Currently their is approximately 30' wide/5,280' long/4'depth of asphalt riddled with potholes and standing water in multiple locations due to poor drainage. Shops have completed multiple temporary repairs that have expanded out due to Alligator, longitudinal, and transverse cracking. A study needs to be completed to determine the root cause of the drainage and pavement issue. Ultimately, all pavement, as well as the curbs, gutters, and ADA ramps need to be replaced from Kuntz bridge to the back gate of Kuntz. See Pictures below.