AIRFIELD LEAKING TRANSFORMER
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contractor is required to remove and replace four existing airfield lighting transformers at U.S. Coast Guard Base Cape Cod on Joint Base Cape Cod in Buzzards Bay, Massachusetts, with refurbished, certified, and warrantied units, while also addressing an optional fifth unit. The transformers to be replaced include two McGraw Edison units (413 and 523), each 37.5 KVA, single-phase, 60 Hz, located near building 614 and runways 23 and 14 respectively; one ABB transformer (138613), a three-phase 1000/1120 KVA unit located near hangar 3181 and taxiway Delta; and an optional Southeastern Transformer Co unit (575), a 15 KVA single-phase transformer near building 195 and runway 5. All replacements must be in-kind or equal, with full compliance to manufacturer specifications, and the contractor must secure power, remove and dispose of the old units off-base at their own expense, install the new units per manufacturer guidelines, restore power, and conduct operational tests. The work must be completed within 45 calendar days of the Notice to Proceed and includes strict adherence to NFPA 70, FAA regulations, OSHA standards, and Joint Base Cape Cod safety directives, including obtaining hot work permits and following the Fire Prevention Standard 911-1. Environmental and hazardous material protocols require documentation of oil disposal via bill of lading, landfill receipts, and recycler permits, with immediate notification to the Contracting Officer’s Representative (COR) if hazardous substances are encountered. All personnel must be skilled, and qualified, on-site supervision is mandatory, including a designated foreman who can approve minor modifications under $2,000 and communicate in English. The contractor must maintain daily logs, protect all government property from damage, and bear full liability for any damage incurred. The contract includes a one-year warranty on all workmanship, materials, and equipment, effective from final acceptance by the COR. Invoicing must be submitted through IPP.GOV, and the solicitation is a 100% Small Business Set-Aside, also open to HUBZone, SDVOSB, WOSB, EDWOSB, and 8(a) entities. The Davis-Bacon Act applies, requiring payment of prevailing wages in Barnstable County, and Executive Order 13706 mandates paid sick leave
General Info
Agency
NAICS
Place of Performance
Buzzards Bay, MA, 02542, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
SCOPE: The Contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to remove and dispose of existing airfield lighting transformers and replace with refurbished, certified, and warrantied transformers (Fig. 1-11) at the U.S. Coast Guard, Base Cape Cod, on Joint Base Cape Cod, Buzzards Bay, MA, 02542.
1.1.1 Existing transformers: Contractors shall verify transformer specifications. 1) Transformer 413 (Fig. 1-3), adjacent to building 614 and runway 23. MANUFACTURER - McGraw Edison, Power System Division, Canonsburg, PA, 15317, single phase, 60 hertz, KVA 37 ½, 65° RISE, serial number 74ZD743004, voltage rating 4160GRD.Y/2400x12470GRD.Y/7200x13800GRD.Y/7970 240/120, cat nc. AAVL 115079A-37-K1, class OA, % IMP. 1.9 - 1.8, WDG MAT L.V. AL HV CU, wt.lb. 855, H.V. CONNECTION: VOLTAGE 2400 – SWITCH POSITION 2.4, VOLTAGE 7200 – SWITCH POSITION 7.2, VOLTAGE 7970 – SWITCH POSITION 7.9. Replace transformers in kind, or equal.
2) Transformer 523 (Fig. 4-6), adjacent to building 614 and runway 14, MANUFACTURER - McGraw Edison, Power System Division, Canonsburg, PA, 15317, single phase, 60 hertz, KVA 37 ½, 65° rise, serial number 73ZE858030, voltage rating 4160GRD.Y/2400x12470GRD.Y/7200x13800GRD.Y/7970 240/120, cat nc. AAVL 115079A-37-K1, class OA, % imp. 1.9 - 1.8, WDG MAT L.V. AL HV CU, wt.lb. 855, H.V. CONNECTION: VOLTAGE 2400 – SWITCH POSITION 2.4, VOLTAGE 7200 – SWITCH POSITION 7.2, VOLTAGE 7970 – SWITCH POSITION 7.9. Replace transformers in kind, or equal.
3) Transformer 138613 (Fig. 7-9), adjacent to hangar 3181 and taxiway Delta, Manufacturer ABB Jefferson City, MO, Style F25E017L67, Serial # 11JC573270001, KVA 1000/1120, AT CONTINUOUS RISE °C 55/65, MFG DATE JULY-2011, HIGH VOLTAGE 4160GRDY/2400, HV BIL KV 60, HV MTL AL, 5 IMPEDANCE 5.80, LOW VOLTAGE 480Y/277, LV BIL KV 30, LV MTL AL, GALLONS OIL 329, TOTAL WEIGHT IN POUNDS 7466. Replace transformers in kind, or equal.
1) Transformer 575 (Fig. 10-12), adjacent to building 195 and runway 5, Manufacturer Southeastern Transformer Co, Dunn, NC, single phase, 60 hertz, KVA 15, % imp. 3.6, serial number 1019102, volts 12470GRDY/7200-240/120. Replace transformers in kind, or equal.
SEE UPDATED SOW FOR FULL REQUIREMENTS
More opportunities from Department Of Homeland Security → Base Cape COD(00052)
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS