This Government Contract opportunity from Department Of Defense was posted on May 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Airfield Raised Light Removal and Reinstallation

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
SLED
Existing Generators Replacement Aguadilla, PR
Solicitation # 872298
This project involves the complete replacement of two existing power generators at the Aguadilla Detention Facility in Aguadilla, Puerto Rico. The scope of work requires the installation of one 100 kW and one 150 kW Perkins diesel generator, both featuring stainless-steel enclosures to protect against salt air and moisture. The installation includes two new NEMA 3R automatic transfer switches, securing the units to the existing concrete slab with Grade 5 or higher galvanized anchor bolts, and performing comprehensive generator load tests. The project is estimated to have a magnitude between $250,000 and $300,000, with a total period of performance of 270 calendar days from the Notice to Proceed. The contract is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) IDIQ. Award will be based solely on the lowest total evaluated price, provided the offeror demonstrates technical understanding, a sound implementation approach, and a robust safety and quality control program. Key compliance requirements include adherence to the Buy American Act, Davis-Bacon prevailing wage rates per determination PR20260001, and strict security protocols, including PIV card issuance and non-disclosure agreements for personnel. All work must be performed during regular business hours, Monday through Friday, and must comply with NFPA 70, the International Building Code, and NEC Article 445.
Bristol Alliance of Companies

POSTED

about 9 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
SLED
LED Lighting and Occupancy Sensor Upgrades DRAFT
Solicitation # 872291
The LED Lighting and Occupancy Sensor Upgrade project is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) for the Buffalo Federal Detention Facility in Batavia, New York. The project involves providing all engineering, labor, equipment, and materials to upgrade the facility with energy-efficient LED lighting fixtures and occupancy sensors, including the removal and disposal of existing fluorescent fixtures, lamps, and ballasts. The estimated magnitude of the contract is between 2 million and 2.3 million dollars, with a period of performance of 180 calendar days from the notice to proceed. Award will be based solely on the lowest total evaluated price. The contractor is required to adhere to Davis-Bacon Act wage determinations and comply with standards from OSHA, ADA, NFPA, and the International Building Code. Key deliverables include a Quality Control Plan due within 15 days of award, a site survey within 30 days, and a final closeout package consisting of as-built drawings, warranty documentation, and 5 percent attic stock. The contractor must also provide a minimum two-hour training session for facility maintenance personnel and a detailed commissioning report verifying that 100 percent of fixtures and controls were tested. Payment requests must be submitted electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 9 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
SLED
Conex Offices for Forensics Personnel - St. Thomas
Solicitation # 872300
This project involves a Firm-Fixed-Price task order under an 8(a) Multiple Award Construction Contract for the provision and installation of two 40ft steel FLEXTAINER conex offices for forensics personnel at the St. Thomas HSI Facility in the US Virgin Islands. The scope of work includes the construction of 3k PSI reinforced concrete slabs, installation of the units, and equipping each office with two split-system A/C units, R-11 insulation, vinyl flooring, LED lighting, and a steel door with a Cypher lock. Each unit must also include four security windows and a 5-pound ABC fire extinguisher. Electrical connectivity must be established via 2-inch PVC or uPVC conduit to the nearest circuit. The contract has an estimated magnitude between 250,000 and 300,000 dollars, with a period of performance of 364 calendar days from the Notice to Proceed. Award will be based on the lowest total evaluated price, considering technical approach, safety, and quality control plans. Key requirements include compliance with the Buy American Act, adherence to Davis-Bacon prevailing wage rates for the Virgin Islands, and strict security protocols, including the signing of DHS Non-Disclosure Agreements and mandatory cybersecurity training. Contractors must conduct a site survey prior to proposal submission and provide a detailed project schedule within 15 days of the Notice to Proceed. All invoicing must be processed through the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 9 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
IE JCC Fire Alarm Repairs
Solicitation # Inland Empire Fire Alarm Deficiencies (169706,169708,169733,169736 & 16937)
Management & Training Corporation (MTC), operator of the Inland Empire Job Corps Center in San Bernardino, California, is soliciting subcontractor bids for a fixed-price, single lump sum contract to address fire alarm deficiencies. The scope of work includes the installation of manual pull stations, horn/strobe notification appliances, and the replacement of six existing fire alarm bells with new horn/strobe units. All new devices must be integrated into the existing fire alarm system and undergo complete functional testing. The project must be completed within 90 consecutive business days following a written Notice to Proceed, with work beginning within five business days of an agreed-upon start date. Bids are due by 3:00 pm PT on September 16, 2026. Submissions must include the MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, a completed MTC Supplier Packet (W-9, self-certification, and terms acceptance), and proof of insurance. For bids equal to or greater than $25,000, a bid bond guarantee of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds totaling 100% of the contract price. The contract is subject to Construction Wage Rate Requirements (CWRR), requiring compliance with California prevailing wage determinations and the submission of weekly certified payroll. Award will be based on overall best value.
Inland Empire Job Corps

POSTED

about 9 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

This contract involves the physical removal, handling, storage, and subsequent reinstallation of 98 raised airfield lights, consisting of 60 runway lights and 38 taxiway lights. The work is necessary to facilitate the movement and restoration of B-52 aircraft, ensuring compliance with Federal Aviation Administration (FAA) and military standards throughout the process. The contract is a subcontract issued by the Department of Defense under the office code FA3016 502 Cons Cl, designated as a Total Small Business Set-Aside in accordance with FAR 19.5, with the NAICS code 238210. The contract location is specified as DWG with the zip code 78236. The solicitation was posted on May 13, 2026, and responses are due by May 26, 2026, at 4:00 PM. This project requires specialized handling to ensure that all lighting equipment is managed correctly and reinstalled to support airfield operations without compromising safety or regulatory compliance. The scope highlights the importance of precision in managing infrastructure tied to military aviation and airfield operational standards.

General Info

Removal, storage, and reinstallation of 98 airfield lights for B-52 aircraft compliance project.

Agency

Department Of Defense → FA3016 502 Cons ClView Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

DWG, TX, 78236, USA

Set-Aside

SBA

Documents

This scope was carved out of FA301626Q0118.

The full solicitation package (8 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

B-52J Commercial Engine Replacement Program Airfield Runway/Taxiway Light Removal and Replacement

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA3016 502 Cons Cl
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → FA3016 502 Cons Cl
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Physical removal, handling, storage, and reinstallation of 98 raised airfield lights (60 runway, 38 taxiway) to facilitate B-52 aircraft movement and restoration, compliant with FAA and military standards.

More opportunities from Department Of Defense → FA3016 502 Cons Cl

Same awarding agency

NAICS: 332999
New
Federal
Provide and Install Brand Name Sheetmaster 100 Roll-Out Shelf Storage System
Solicitation # FA301626Q0287
Solicitation FA301626Q0287 is a combined synopsis and request for quote for the procurement and installation of one brand name Sheetmaster 100 Roll-Out Shelf Storage System, manufactured by Rack Engineering Division, for Hangar 5 at Joint Base San Antonio Randolph, Texas. The project requires the delivery, professional assembly, and structural anchoring of a blue, all-welded steel system to a concrete floor slab. Technical specifications include a load capacity of 5,500 lbs per shelf, a standard height of 84 inches, and an automatic locking system that secures shelves at 100 percent open or closed. The contractor must also perform a dry-run test to demonstrate full shelf extension and provide all necessary operations manuals and warranty paperwork. This is a 100 percent Small Business Set-Aside under NAICS code 332999. The government will award a single firm-fixed-price purchase order based on the lowest price technically acceptable (LPTA) evaluation. To be deemed technically acceptable, offerors must provide product literature and a detailed technical capability narrative substantiating their ability to complete the delivery, installation, and testing. Quotes are due by September 18, 2026, at 2:00 PM CDT. It is noted that funds are not presently available, and the government reserves the right to cancel the request. Payment will be processed electronically through the Wide Area WorkFlow system, and items must comply with MIL-STD-130 and MIL-STD-129 for unique item identification and shipment labeling.
All Other Miscellaneous Fabricated Metal Product Manufacturing

POSTED

1 day ago

DEADLINE

in 6 days
View Details
NAICS: 721110
New
Federal
Commercial Lodging for the 433rd Airlift Wing
Solicitation # FA301626Q0138
Solicitation FA301626Q0138 is a request for a firm-fixed-price Blanket Purchase Agreement (BPA) to provide commercial lodging services for the 433rd Airlift Wing at Joint Base San Antonio (JBSA) Lackland. This acquisition is a total set-aside for small business concerns under NAICS code 721110, with a master limit of 1,269,000 dollars over a five-year period of performance. The contractor must provide safe, clean, and compliant accommodations for personnel in various duty statuses, including Unit Training Assemblies and Active Duty. Requirements include a maximum capacity of 50 double and 25 single occupancy rooms per UTA, daily maid service, and strict adherence to AFOSH 91-001, ADA compliance, and the FEMA National Master List for fire safety. The award will be granted to the Highest Technically Rated Offeror with a Fair and Reasonable Price (HTRO-FRP) through a three-step evaluation process. First, only the five lowest-priced quotes advance to technical evaluation. Second, offerors must pass four mandatory gates: FEMA listing, a 15-mile driving radius from JBSA-Lackland or Fort Sam Houston, JTR per diem rate compliance, and a successful physical site inspection. Third, eligible quotes are scored on proximity to the installation, room block guarantees, and amenities such as in-room kitchenettes and complimentary hot breakfast. Payment is handled via Government Purchase Card for calls under 25,000 dollars and through the Wide Area Workflow (WAWF) module for calls exceeding that amount, with consolidated monthly invoices due by the 10th of each month. Submissions must be divided into two distinct volumes: a price submission and a technical submission. Any pricing information included in the technical volume will result in the quote being deemed non-responsive.
Hotels (except Casino Hotels) and Motels

POSTED

1 day ago

DEADLINE

in 2 days
View Details
NAICS: 334111
New
Federal
Palo Alto Firewall Appliances & Licenses
Solicitation # FA301626Q0262
Solicitation FA301626Q0262 is a request for quotation for the procurement of brand-name Palo Alto Networks PA-440 firewall appliances and proprietary security subscription licenses to replace end-of-life Cisco equipment at the Medical Education and Training Campus (METC) in Building 1374 at JBSA Fort Sam Houston, Texas. The requirement is a 100 percent small business set-aside under NAICS 334111. The government intends to award one five-year firm-fixed-price purchase order, spanning approximately September 30, 2026, through September 29, 2031. Key deliverables include two PA-440 appliances and one-year subscriptions for Advanced URL Filtering, WildFire, Threat Prevention, DNS Security, and Premium Support, with four additional option years for subscription licenses. Amendment 1 added CLIN 007 for installation labor and testing and extended the quote submission deadline to September 16, 2026. The government will evaluate quotes using the Lowest Price Technically Acceptable (LPTA) criteria, where technical quotations are assessed on a pass/fail basis based on meeting salient characteristics. No reconditioned or used parts are acceptable. While the government intends to award based on initial submissions, it reserves the right to conduct interchanges with quoters if deemed necessary. The contractor is responsible for providing all management, tools, labor, and materials for installation and testing. Payment shall be processed through Wide Area Workflow (WAWF). Security requirements include obtaining base identification and vehicle passes for personnel performing work at the installation.
Electronic Computer Manufacturing

POSTED

1 day ago

DEADLINE

in 5 days
View Details
NAICS: 238220
New
Federal
Bldg 3820 Chiller Diagnostic and VFD Services
Solicitation # FA301626Q0271
Solicitation FA301626Q0271 is a requirement for comprehensive diagnostic troubleshooting and repair services for a Trane Chiller system located at Building 3820, JBSA Fort Sam Houston. The primary objective is to isolate and resolve operational issues with the Variable Frequency Drive (VFD) to restore the system to 100 percent operational capability in accordance with manufacturer standards. This procurement is set aside for Women-Owned Small Businesses under NAICS 238220. The scope of work includes up to 17 hours of diagnostic labor within a three-day service window, with a performance period scheduled from September 30, 2026, to October 30, 2026. Key deliverables include the execution of electrical, control, and mechanical diagnostics, the submission of a detailed diagnostic report to the CE 502d Project Manager, and the immediate replacement of the VFD if found defective using brand new OEM parts. The contractor must provide a one-year workmanship guarantee and pass through all original manufacturer warranties to the government. Strict adherence to safety protocols is required, including OSHA 29 CFR 1910.147 for Lockout/Tagout, NFPA 70E for arc flash safety, and EPA Section 608 certification for technicians handling refrigerants. Final acceptance requires performance testing under load witnessed by JBSA representatives to verify full operational capability.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

2 days ago

DEADLINE

in 6 days
View Details
NAICS: 337127
New
Federal
BMET Work Center Furniture Package-Workbenches and Installation
Solicitation # FA301626Q0276
Solicitation FA301626Q0276 is a firm-fixed-price request for quotation issued by the 502d Contracting Squadron at JBSA-Randolph for the turn-key delivery, assembly, and installation of a Biomedical Equipment Technician (BMET) Work Center Furniture Package at the Port San Antonio Consolidated Storage and Deployment Center in Texas. This requirement is 100% set aside for small businesses under NAICS 337127 and is conducted on a brand-name or equal basis, specifically referencing Lista/Vidmar products. The scope of work includes the procurement and installation of L-shaped technician and admin workbenches, straight ESD workbenches, various storage cabinets, and specialized seating. All ESD-safe components must meet ANSI/ESD S20.20 and EOS/ESD S4.1 standards. The contractor is also responsible for electrical hookups, ESD grounding, and adhering to DoD item unique identification and marking standards per MIL-STD-130 and MIL-STD-129. The government will utilize a Best Value Tradeoff source selection methodology to award the contract. Technical capability is evaluated on a pass/fail basis, while the delivery and installation schedule, past performance, and price serve as tradeoff factors. Non-price factors are considered significantly more important than price in the final determination. All items must be delivered and installed by September 30, 2026. Offerors are required to submit a four-part electronic proposal covering technical capability, delivery schedules, past performance, and pricing. Invoicing and payment will be processed electronically through the Wide Area WorkFlow (WAWF) system.
Institutional Furniture Manufacturing

POSTED

2 days ago

DEADLINE

in 2 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS