AMRP Murrinsville1&2 Venango&MarrionTWP ButlerCnty

Open
OSM 10(0670)101.1,102.1State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The AMRP Murrinsville 1 and 2 project, located in Venango and Marrion Townships of Butler County, Pennsylvania, is a solicitation issued by the Pennsylvania Department of Environmental Protection. The scope of work focuses heavily on land restoration and environmental management, including the clearing and grubbing of 56.3 acres, extensive grading of 509,000 cubic yards, and the installation of subsurface drains and permanent channel excavations. To mitigate environmental impact, the contract requires the implementation of a comprehensive Erosion and Sediment Pollution Control Plan featuring rock construction entrances, compost filter socks, and weighted sediment filter tubes. Additional requirements include the installation of 1,742 linear feet of fencing, brush barriers, and a dewatering impoundment. The restoration phase involves planting preparation for 56.3 acres, the planting of 24,072 tree seedlings, and the application of 1,136 pounds of grass seed. Construction surveying is also required for the duration of the project. Interested parties can access bid documents via BidExpress, with the response deadline set for December 10, 2026.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyPennsylvania → Department of Environmental Protection
Contacts1 person available
OfficeN/A

Full Description

Show more
The principal items of work and approximate quantities are:Implementation of the Erosion and Sediment Pollution Control Plan - Rock ConstructionEntrance, 1 EACHImplementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32”Diameter), 8,034 L.F.Implementation of the Erosion and Sediment Pollution Control Plan -Weighted Sediment FilterTube, 260 L.F.Fence, 1,742 L.F.Clearing and Grubbing, 56.3 ACREBrush Barrier, 3,900 L.F.Dewatering Impoundment, 1 L.S.Subsurface Drain, 3,083 L.F.Grading – Grading, 509,000 C.Y.Grading – Hummocky Piles, 19.5 ACREGrading – Ripping, 15.9 ACREChannel Excavation - Permanent Channel Excavation, 574 C.Y.Channel Lining - Erosion Matting, 1,432 S.Y.Planting – Planting Preparation, 56.3 ACREPlanting – Tree Seedlings, 24,072 EACHPlanting – Grass Seed, 1,136 LB.Construction Surveying, 1 L.S.Beginning on the Issue Date, free copies of bid documents can be obtained by going to www.BidExpress.com, PA Department of Environmental Protection.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Federal
USACE SPK DBB Construction - LAR C3B South - Sacramento, CA
Solicitation # W9123827BA002
The United States Army Corps of Engineers Sacramento District anticipates a design-bid-build construction requirement for the Lower American River Contract 3B South project in Sacramento, California. This effort focuses on erosion control and levee strengthening along approximately 1.5 miles of the south bank, extending from Watt Avenue upstream toward Mayhew Drain. The scope of work includes constructing launchable rock toes and trenches, installing bank protection and tie-backs, regrading riverbank slopes, and placing instream wood structures on planting benches. The project is organized into four phases: tree clearing and transplant, two years of erosion protection, and a final greening phase. In-water work is restricted to the window between July and October. The government estimates a target price range between 45 million and 60 million dollars, with a construction period of 510 calendar days. The requirement is anticipated to be a small business set-aside under NAICS 237990, solicited as a firm-fixed price contract via an Invitation for Bids in October 2026. Key compliance requirements include CMMC Level 1 Self Certification, E-Verify participation, and the requirement for the successful offeror to enter into a Project Labor Agreement. Bidders must be registered in both SAM and the Procurement Integrated Enterprise Environment. Notably, the project is subject to pending litigation that currently prohibits ground or vegetation disturbing activities; therefore, the government reserves the right to delay or cancel the solicitation without liability.
W075 Endist Sacramento

POSTED

about 6 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
Federal
Arcadia Wet Well Rehabilitation_Amendment 0004
Solicitation # W912BV26RA033
Solicitation W912BV26RA033 is a firm fixed price contract issued by the U.S. Army Corps of Engineers, Tulsa District, for the rehabilitation of wet well low flow gates at Arcadia Dam in Oklahoma County, Oklahoma. The project magnitude is estimated between $1,000,000 and $5,000,000 with an estimated duration of 500 calendar days. The scope of work includes the fabrication of two structural steel bulkheads, the removal and disposal of existing low flow gates in the north wet well, and the installation of new ductile cast iron low flow inlet and low flow gates. Additionally, the contractor must replace all angle H frames and structural bolts in both the north and south wet wells. Optional tasks may include similar removal and installation services for the south wet well and the procurement of six additional ductile cast iron inlet gates. Award will be determined using the Lowest Price Technically Acceptable (LPTA) process, where proposals are evaluated for acceptability based on non-cost factors including past performance, key personnel, and performance capability. To be technically acceptable, offerors must demonstrate experience with at least one to two recent relevant projects exceeding $250,000 in value involving hydraulic steel structures, water control gates, or heavy lifting in confined environments. All key personnel must be U.S. citizens or documented U.S. workers. The contractor is required to implement a three-phase control system under a Contractor Quality Control Plan and adhere to EM 385-1-1 safety requirements. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment (PIEE) by November 16, 2026, at 2:00 PM CDT.
W076 Endist Tulsa

POSTED

about 6 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
Veterans Parkway Fitness Station Replacement Project (D-933)
Solicitation # E1312-26C
The Veterans Parkway Fitness Station Replacement Project (D-933), solicitation E1312-26C, is a public works project managed by the City of Manhattan Beach Public Works Department. Located at 1104 N. Valley Drive, the scope of work includes mobilization, demolition, grading, and erosion control to replace existing exercise equipment and pads. Key deliverables include the installation of City-provided exercise equipment with reinforced PCC foundations, the replacement of a drinking fountain, the installation of signage, and the reconstruction of two ADA parking stalls using permeable concrete. The project also involves the restoration of irrigation, planting, and water quality improvements. Work must be performed in strict accordance with the California Building Code, City/County standards, and the Municipal Separate Storm Sewer System National Pollutant Discharge Elimination System permit. The project is scheduled for an anticipated award in January 2027, with a total duration of 60 working days, split between 20 days for preconstruction and 40 days for construction. The contract will be awarded to the lowest responsive and responsible bidder, with evaluations based on financial standing, general competency, and bid accuracy. Bidders must submit their proposals via the OpenGov portal by December 10, 2026, including a signed Contractor's Statement, references, a noncollusion declaration, and evidence of signing authority. Required bonding includes a bid bond of 10%, performance and payment bonds at 100% of the contract price, and a one-year warranty bond of 10%. As a public work, the project is subject to Labor Code Section 1770 et seq., requiring all contractors and subcontractors to pay prevailing wages as determined by the Department of Industrial Relations.
Public Works

POSTED

about 18 hours ago

DEADLINE

in 27 days
View Details

More opportunities from Pennsylvania → Department of Environmental Protection

Same awarding agency

NAICS: 323111
SLED
DEP Decals Stickers and Cab Cards
Solicitation # 6100066726
Solicitation 6100066726 is an established price contract issued by the Pennsylvania Department of Environmental Protection for the design, printing, imaging, and mailing of Waste Transportation Safety Program stickers and cab cards. The scope of work requires the production of tamper-evident decal stickers made from 2 mil reverse void silver metallized polyester, designed to withstand 15 months of outdoor exposure, road salt, and pressure washing. Each mailing packet must include two variable-data stickers, one authorization cab card, and a folded driver's checklist insert. To prevent counterfeiting, the contractor must implement a visual security feature, preferably long-wave UV fluorescent ink. Data for these materials will be exchanged daily via CSV files through a secure file transfer protocol. The contract features an initial one-year term with the possibility of four additional one-year renewals. Award is based on the lowest total evaluated bid price from a responsive and responsible bidder, with mail handling fees included in the bid but actual postage reimbursed at cost. Performance requires daily processing and mailing of materials every business day. Bidders must submit a comprehensive company profile and adhere to strict regulatory certifications, including the Iran Free Procurement Certification, Lobbying Disclosure, and compliance with the Pennsylvania Reciprocal Limitations Act. Additionally, the contractor must comply with state labor laws, including the payment of prevailing wage rates for all printing work.
Commercial Printing (except Screen and Books)

POSTED

10 days ago

DEADLINE

in 19 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS