Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

ARC Boat Company Demonstration Project Agreement - Zero-Emission Tugboat Retrofit, Demonstration and Installation of Charging Infrastructure

Awarded
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Technology Advancement Program Demonstration Project Agreement between the Port of Long Beach and Arc Boat Company focuses on the conversion of the Harbor Sentinel, a diesel commercial tugboat, into a zero-emission battery electric propulsion vessel. The project includes the installation of necessary charging infrastructure and supporting equipment at the Pacific Maritime Group facility located at Pier C in Long Beach, California. With a total value not to exceed 1,375,000 dollars, the agreement is set to conclude on November 30, 2027. The scope of work requires Arc Boat Company to collect and analyze performance, operation, and charging data, providing quarterly updates throughout the process. Following a 12-month demonstration period, a final report must be submitted detailing performance results, emissions reductions, project accomplishments, and lessons learned to establish a business case for future commercialization. The project is exempt from further environmental review under CEQA Sections 15303, 15306, and 15262. Administrative oversight is managed by the City of Long Beach Harbor Department Environmental Planning Division.

General Info

Port of Long Beach retrofits tugboat to battery-electric with onshore charging via $1.375M pilot through 2027.

Place of Performance

Long Beach, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

forecast

Awarded

Contract was awarded

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Long Beach, Port of
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Renee MoilanenPort of Long Beach
Tyler HanksEnvironmental Specialist Intern

Full Description

Show more
Demonstration of zero-emission battery electric propulsion tugboat and installation of charging infrastructure at Pacific Maritime Group’s facility at Pier C. Technology Advancement Program Demonstration Project Agreement with Arc Boat Company in the amount not to exceed $1,375,000 and a term ending on November 30, 2027 for the retrofit of the Harbor Sentinel, an existing diesel commercial tugboat into a zero-emission tugboat.

Similar Contracts

Same NAICS industry code

More opportunities from California → Long Beach, Port of

Same awarding agency

NAICS: 541620
SLED
Cooperative Agreement Between the Ports of Long Beach and Los Angeles and the South Coast Air Quality Management District
Solicitation # 2025110385
The Cooperative Agreement between the South Coast Air Quality Management District (AQMD), the Port of Los Angeles, and the Port of Long Beach, executed in December 2025 and effective through December 31, 2030, establishes a framework for implementing Clean Air Action Plan (CAAP) Plus measures. The agreement mandates a three-phase process to develop and adopt zero-emission infrastructure plans for cargo-handling equipment, switcher locomotives, drayage trucks, and ocean-going vessels. Key milestones include a series of draft and final plan adoptions by the Board of Harbor Commissioners spanning from May 2027 through December 2029. To ensure accountability, the agreement includes strict public process requirements, including a 45-day review period for draft materials and annual progress reporting to the AQMD. A subsequent addendum expands the scope to include the Enhanced Clean Ship Incentive Program and the Zero-Emission Truck Utilization Incentive Program, the latter of which must be approved by February 28, 2027. Additionally, the agreement allocates 20 million dollars to the South Coast AQMD to fund regional off-port truck charging and fueling infrastructure, with a memorandum of understanding for these funds due by February 28, 2027. The agreement incorporates enforcement mechanisms where ports failing to meet deadlines or public process requirements are subject to penalties ranging from 50,000 to 100,000 dollars, payable into a Clean Air Mitigation Fund for projects within the Tidelands Trust area. Concurrent activities also include clean marine fuel assessments, pilot projects, and technical studies on vessel emissions.
Environmental Consulting Services

POSTED

3 months ago

DEADLINE

N/A
View Details
NAICS: 541380
SLED
Geotechnical Field Investigation – Harbor Development Permit No. 25-058
Solicitation # HDP 25-058
The Port of Long Beach is executing the Waterfront Seismic Improvement Project at Pier F, Berth F202, within the Southeast Harbor Planning District. Under Harbor Development Permit No. 25-058 and its second amendment, the project focuses on reducing seismic risks and enhancing site stability through targeted geotechnical upgrades. The scope of work includes performing geotechnical borings, probes, and potholing to collect data and locate underground utilities. These efforts support the implementation of compaction and jet grouting in areas susceptible to liquefaction and settlement, specifically along the rock dike at the Middle Harbor entrance adjacent to the Joint Command Control Center, the Jacobsen Pilot Service building, and the associated parking area. The project involves the demolition of existing pavement and temporary structures, the relocation and adjustment of affected underground utilities from the JCCC parking lot to the Long Beach Fire Station 15 lot, and the in-kind replacement of pavement. All activities are conducted under California Environmental Quality Act categorical exemptions, as the work consists of minor alterations and basic information collection with no significant environmental impact. Project administration is managed by the Port of Long Beach, with key personnel including Camille Hodge as Project Manager and Allyson Teramoto as Director of Environmental Planning. All removed materials must be disposed of in accordance with federal, state, and local environmental regulations.
Testing Laboratories and Services

POSTED

3 months ago

DEADLINE

N/A
View Details
NAICS: 561730
SLED
Contracts Between the Port of Long Beach and Community Grants Program Awardees for Facility Improvements ProjectsThe Port of Long Beach has established contracts with twelve community-based organizations to fund facility improvement projects totaling up to $2,612,012 under its Community Grants Program, with the primary objective of reducing port-related environmental impacts in Long Beach, California. The funded initiatives are categorized into three key areas: Trees and Landscaping, Electric Fleet Vehicle purchases and associated charging stations, and Energy Efficiency upgrades. Awardees include Centro CHA, Inc., Century Villages at Cabrillo, the Boys and Girls Club of Long Beach, Pacific Baptist Church, the City of Long Beach, First Congregational Church, Lutheran Social Services of Southern California, the California Aquatic Therapy and Wellness Center, and the Long Beach Unified School District. All projects are implemented at specific locations within Long Beach, though the official place of performance is listed as Los Angeles due to county alignment. The projects are designed to meet environmental goals through urban greening, electrification of transportation fleets, and infrastructure upgrades such as LED lighting and HVAC system improvements. All activities are supported by categorical exemptions under the California Environmental Quality Act (CEQA), specifically Classes 1 through 4, which cover existing facilities, replacement or reconstruction, new small structures, and minor land alterations, allowing expedited approval without full environmental review. No formal contract clauses from the Federal Acquisition Regulation were included in the documentation, and no detailed line-item pricing, delivery schedules, invoicing procedures, or payment details were specified. There are no stated inspection protocols, quality standards, or acceptance criteria beyond general compliance with federal, state, and local environmental regulations. The Port of Long Beach serves as the lead agency and contracting entity, with Renee Moilanen and Tyler Hanks designated as primary contacts for environmental planning, though their formal roles as COR, COTR, or PCO are not explicitly defined. No solicitation number, contract type, or formal evaluation criteria were provided, and the award process appears to have been guided by recommendations from the Community Grants Advisory Committee rather than a competitive procurement process. The total value represents a ceiling for all awards combined, with no breakdown of individual project funding levels, and no representations, certifications, or socioeconomic status details from awardees were included.
Landscaping Services

POSTED

4 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS