Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Energy was posted on July 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Argon Piping Supply, Installation and Testing

Closed
73573Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236210
New
SLED
Facilities & Parks New Supply Warehouse Building
Solicitation # ITB FM 04-27
The Board of County Commissioners of Okaloosa County, Florida, is soliciting bids under ITB FM 04-27 for the construction of a new 9,000 square foot metal supply warehouse for the Facilities and Parks Department located at 5489 Old Bethel Road in Crestview. The project involves comprehensive site preparation and construction, including the installation of energy-efficient HVAC systems, electrical and plumbing work, and telecommunications wiring. All work must comply with the 2023 8th Edition Florida Building Code, ADA standards, and OSHA regulations, with specific structural requirements to withstand 160 MPH ultimate wind speeds. A fire alarm system is explicitly not required for this project. Bids must be submitted electronically via OpenGov by November 4, 2026, at 3:00 pm CST. The contract will be awarded to the responsive and responsible vendor with the lowest bid, though the County reserves the right to negotiate the most advantageous agreement. The selected contractor must provide a dedicated project manager and furnish both bid and performance bonds. The project timeline is 12 months from the notice to proceed. Payment will be processed through the County Finance Office in accordance with the State of Florida Local Government Prompt Payment Act, contingent upon annual appropriation. For projects involving federal grant funding, contractors must be registered in SAM.gov and comply with Buy America and Trafficking Victims Protection Act requirements.
Facilities & Parks

POSTED

5 days ago

DEADLINE

in 7 days
NAICS: 236210
New
Federal
Tinker AFB 2026 Multiple Award Construction Contract (MACC)
Solicitation # FA8137-26-R-0040
Solicitation FA8137-26-R-0040 is a competitive Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) for general construction services at Tinker Air Force Base, Oklahoma. The contract encompasses a broad range of sustainment, maintenance, repair, alteration, renovation, and minor construction projects. Work execution is categorized into three methods: Design-Build, Construction with Limited Design, and Construction Only. The MACC has a total aggregate maximum value of 950 million dollars, with a minimum guarantee of 500,000 dollars per awarded contract. The period of performance consists of a five-year base period starting March 26, 2027, with one five-year option period. The procurement is divided into a Small Business Pool, which is a 50 percent set-aside, and a Full and Open Pool. Awards are based on the Highest Technically Rated Offeror (HTRO) methodology, utilizing a Minimum Technical Threshold Rating (MTTR) based on validated self-scored matrices for technical experience, design experience, certifications, and staffing. There is no cost or price evaluation at the IDIQ level. Offerors must be registered in the System for Award Management and meet CMMC Level 1 certification requirements. Following several amendments, the final proposal response deadline was extended to November 16, 2026.
FA8137 Afsc Pzioc

POSTED

6 days ago

DEADLINE

in about 2 hours
NAICS: 236210
New
SLED
IFB 06-26 Biochar Facility Construction
Solicitation # IFB-06-26
The Southeastern Public Service Authority of Virginia (SPSA) is soliciting bids for the construction of a 40,872 square foot biochar processing plant located in Portsmouth, Virginia. The facility is designed to manage the organic portion of the SPSA SORT System. The successful contractor will be responsible for providing all labor, materials, and warranties to deliver a fully operational facility, which includes coordinating construction activities with SPSA and AMP regarding the installation and commissioning of specialized equipment. The contract will be awarded to the lowest responsive and responsible bidder, with evaluations based on technical compliance, the ability to meet quality standards, and the provision of descriptive literature and references for similar completed projects. Key requirements include the submission of performance and labor and material payment bonds totaling 50 percent of the contract amount and adherence to strict safety and accessibility standards, including the Americans With Disabilities Act. Bidders must provide one original and four copies of their bid, along with an electronic copy on a flash drive, by the deadline of November 20, 2026. The contractor is required to provide as-built drawings upon completion and must comply with various federal and state regulations, including drug-free workplace and non-discrimination provisions. All work must be performed in accordance with the CED Project Manual and associated drawings, with specific quality assurance testing for concrete and asphalt as outlined in the inspection criteria.
Southeastern Public Service Authority

POSTED

7 days ago

DEADLINE

in 23 days
NAICS: 236210
Federal
IE181 - WHS Greenhouse Construction
Solicitation # 140A2327Q0297
Solicitation 140A2327Q0297 is a fixed-price contract set aside exclusively for Indian Small Business Economic Enterprises (ISBEE) to design and install an educational greenhouse facility at Wingate High School in Fort Wingate, New Mexico. The project, estimated between $100,000 and $250,000, involves a comprehensive scope of work including foundation installation, utility connections, greenhouse structure and glazing, ventilation, environmental controls, heating, and electrical systems. The work must be performed at a remote high-desert site at an elevation of approximately 6,900 feet on an occupied K-12 campus. The maximum allowable period of performance is 120 calendar days from the Notice to Proceed. Award will be made based on the Lowest Price Technically Acceptable (LPTA) method to a responsible offeror who meets all technical requirements, including the submission of a project-specific Quality Control Plan and a qualified project management team. Key requirements for offerors include registration in SAM.gov, current New Mexico contractor licensure for general building, electrical, and mechanical/gas work, and any necessary Navajo Nation tribal business licenses. Additionally, a bid bond is required for any quote exceeding $35,000. Proposals must be submitted to the Bureau of Indian Education by November 19, 2026, at 12:00 PM MDT, and must include a signed quote, UEI number, and the required Indian Economic Enterprise Representation.
Indian Education Acquisition Office

POSTED

8 days ago

DEADLINE

in 22 days

AI Contract Overview

Show more

The contract, solicitation number LBNF-73573-JK, is for the supply, installation, and testing of a stainless-steel argon gas pipeline as part of the Long-Baseline Neutrino Facility (LBNF) and Deep Underground Neutrino Experiment (DUNE) at the Sanford Underground Research Facility (SURF) in Lead, South Dakota. Approximately 40,000 metric tons of liquid argon will be transported to the surface receiving station, converted to gas, and delivered underground through a pipeline system with varying diameters: 8-inch Schedule 10 from the Argon Receiving Facility to the Ross Shaft, 6-inch Schedule 10 from the Ross shaft collar to the 4850 Level, and back to 8-inch Schedule 10 from the Ross Shaft to the Central Utility Cavern. The work includes surface trenching, shaft installation, underground suspension and anchoring, and full leak and weld testing, with all welding required to meet ASME or AWS standards. The project requires strict adherence to Procore software for documentation, daily reporting, a site-specific Environment, Safety, and Health plan, and a QA/QC program aligned with ISO 9001 or ASME standards. The pipeline must be installed within 250 calendar days from award, with concurrent operations permitted across surface, shaft, and underground zones, though surface and shaft activities must be minimized due to the shaft’s critical role as the primary access point for other LBNF/DUNE operations. Weather delays up to seven days per year are not billable, and delivery to the Ross Headframe, 100 Ross Rd., Lead, SD 57754, along with prior notification to FFDG Logistics two weeks in advance, is mandatory. The contract is a firm-fixed-price solicitation with no government-furnished property, and all work is governed by the General Terms and Conditions for Construction at SURF (08.2025), incorporating numerous FAR and DEA clauses including FAR 52.222-55 with Executive Order 14026 minimum wage requirements, FAR 52.222-21 prohibiting segregated facilities, FAR 52.236-2 and -5 addressing differing site conditions and materials/workmanship, and FAR 52.242-15 allowing stop-work orders. Subcontractors must submit comprehensive proposals in two PDF volumes—one technical and one

General Info

Supply, install, and test stainless-steel Argon pipelines for DUNE experiment underground facility.

NAICS

236210 - Industrial Building Construction

Place of Performance

Lead, SD, 57754, USA

Set-Aside

NONE

Documents

19

013100 - Environment, Safety, and Health Requirements for Fermi Forward Discovery Group

PDF, High priority: read this firstsow
High

Amendment 02 to RFP LBNF-73573-JK for Argon Piping

PDF, High priority: read this firstamendment
High

Fermi Forward Discovery Group Subcontractor Annual Representations & Certifications Rev 4

PDF, High priority: read this firstsarc
High

Fermilab OCI Certification & Assessment FL-11 Rev 1

PDF, High priority: read this firstoci-certification
High

Fermilab Subcontractor Injury & Illness Data Questionnaire

DOCX, High priority: read this firstquestionnaire
High

J-1 FFDG General Terms and Conditions for Construction at SURF (08.2025)

PDF, High priority: read this firstgeneral-terms-and-conditions
High

J-2 2025 Insurance Requirements for FRA Subcontracted Work at SURF Risk Category 3 Rev 01

PDF, High priority: read this firstinsurance-requirements
High

J-4 SDSTA Risk Transfer Protocol Manual Final July 12 2024

PDF, High priority: read this firstrisk-transfer-protocol-manual
High

J-5+010010 General Requirements Section for FFDG Construction 2025

DOCX, High priority: read this firstsow
High

J-7+014100-8-2025 South Dakota Quality Requirements

PDF, High priority: read this firstquality-requirements
High

LBNF/DUNE Argon Gas Piping Supply and Installation SOW 03-27-2026

DOCX, High priority: read this firstsow
High

Organizational Conflict of Interest Clause - K-4 FL-57B Rev. 1-07

PDF, High priority: read this firstclause
High

PUR-466 Proposal Certifications Revision 2

PDF, High priority: read this firstcertifications
High

RFP 73573-JK Argon Piping Labor Rates Price Sheet

XLSX, High priority: read this firstprice-sheet
High

RFP LBNF-73573-JK Argon Piping Supply Installation and Testing

DOCX, High priority: read this firstrfp
High

RFP LBNF-73573-JK Argon Piping Supply Installation Testing

DOCX, High priority: read this firstrfp
High

Small Business Subcontracting Plan (Rev. 6-23) Exhibit III-G

PDF, High priority: read this firstsubcontracting-plan
High

South Dakota Lawrence County Building Construction Wage Determination SD20260016

TXT, High priority: read this firstwage-determination
High

U2623 LBNF Argon Piping Supply and Installation Questions #2

XLSX, High priority: read this firstq-and-a
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Solicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Fermilab - DOE Contractor
Contacts2 people available
OfficeBatavia, IL, 60510, USA
Office AddressBatavia, IL, 60510, USA

Full Description

Show more

July 17, 2026 - Amendment 2 is issued to proviide additional questions and answers to this RFP.  Documents are attached.  The Proposal due date is unchanged, proposals are due on 27 July 26.  


July 8, 2026 - Amendment 1 is issued to provide questions and answers to the RFP.  Documents are contented in the attached link.  


 As part of the DUNE experiment, approximately 40,000 metric tons of Argon is required to be transported from the surface to the Central Utility Cavern (CUC) at the 4850 Level. This Argon will arrive at the Ross Shaft Argon Receiving station in liquid form where it will be stored in tanks. It will then be converted to the gaseous phase, where it will be transported underground through a stainless-steel pipeline. This pipeline will be 8” diameter Schedule 10 between the Argon Receiving Facility and the Ross shaft, 6” diameter schedule 10 from Ross shaft collar to the 4850 Level, then return to 8” diameter schedule 10 from the Ross shaft to the CUC.


This SOW defined as “Argon Gas Piping Supply and Installation for LBNF” outlines the requirements for the supply, installation and testing of a stainless-steel pipeline at LBNF as described above.


More opportunities from Department Of Energy → Fermilab - DOE Contractor

Same awarding agency

NAICS: 332323
New
Federal
Bar Grating and Saddle Clips
Solicitation # 388000kmb
Fermi Forward Discovery Group, LLC is soliciting firm-fixed price proposals under RFP 388000kmb for the fabrication and delivery of hot-dipped galvanized carbon steel bar grating and associated saddle clips. These materials are required for the VD Cryostat Roof Decking as part of the LBNF/DUNE project. The scope includes various sizes of bar grating with bearing bars measuring 1.5 inches tall by 3/16 inches thick and 19-W-4 spacing, along with Type W44 and W10 saddle clips. Technical requirements specify a minimum live load of 100 PSF, a minimum concentrated load of 1000 LB, and a maximum deflection of 0.25 inches. Proposals must be submitted via email to Karen Berger by 5:00 PM CT on November 6, 2026. A complete submission package requires a proposal including lead times, a completed first page of the RFP, the Subcontractor Annual Representations and Certifications (SARC), and the PROC-FRM-466 Proposal Certifications. Award will be based on the Lowest Price Technically Acceptable (LPTA) selection process, with a strong emphasis on strict adherence to technical specifications and FFDG terms and conditions to avoid disqualification. Delivery is required FOB Destination to the Dakota Warehouse in Rapid City, South Dakota. All items must be bundled and packaged to comply with the Ross Shaft Load Envelopes and Shipping Expectation guidelines to ensure compatibility with warehouse handling capabilities. Post-award deliverables include a detailed logistics and shipping plan and all applicable operator manuals. The contract is subject to various federal regulations, including Buy American requirements and FAR anti-discrimination laws.
Ornamental and Architectural Metal Work Manufacturing

POSTED

5 days ago

DEADLINE

in 9 days
View Details
NAICS: 332911
New
Federal
PIP-II CM 2K Pressure Safety Device - Rupture Disks
Solicitation # 387878-DSF
Fermi Forward Discovery Group, LLC, operating the Fermi National Accelerator Laboratory (Fermilab), is soliciting firm-fixed price proposals under solicitation 387878-DSF for the procurement of thirty-three cryogenic non-reclosable rupture disk cartridges. These components are required for the Proton Improvement Plan II (PIP-II) Cryomodule relief system and must be designed for sub-atmospheric cryogenic conditions of approximately 2 K and 30 mbar absolute pressure. The requirement includes disks with set pressures of 3.1 barg and 1.75 barg, constructed from Inconel, and equipped with normally closed burst alert sensors on the outlet. All disks must be ASME Section VIII Code NB/UD stamped and meet a helium leak rate specification of 10^-8 atm-cc/sec. Proposals must be submitted via email to Seth Fryar by October 30, 2026, at 2:00 PM Central Time. Submissions must include a technical proposal demonstrating merit and five years of relevant experience, a delivery schedule, and a price proposal using the provided Exhibit F pricing sheet. Award will be granted to the lowest evaluated proposal that meets all technical and past performance acceptability standards. The contract requires strict adherence to various federal regulations, including the Buy American Act, FAR anti-discrimination laws, and DOE site access and safety requirements. Delivery is FOB Destination to Batavia, Illinois, where Fermilab will conduct visual, mechanical, and certification inspections within two weeks of receipt.
Industrial Valve Manufacturing

POSTED

5 days ago

DEADLINE

in 2 days
View Details
NAICS: 331491
Federal
PIP-II Niobium Sheets, Rings, and Disks
Solicitation # 385634-DSF
Fermi National Accelerator Laboratory (FNAL), through the Fermi Forward Discovery Group, LLC, is soliciting firm-fixed price proposals for the manufacturing, testing, certification, and delivery of high-purity Niobium and Niobium-Alloy components. These materials, which include RRR300 Niobium sheets, Nb55Ti rings and disks, and forged Niobium rings, are critical for superconducting radio-frequency cavities used in the Proton Improvement Plan II (PIP-II) project. All deliverables must adhere to strict technical specifications, including a Residual Resistivity Ratio (RRR) value greater than 300 and compliance with ASTM B-391, B-393, and E-8/E-384 standards. Materials must be delivered FOB Destination to Batavia, Illinois, with specific requirements for non-abrasive packaging and permanent product inscription for traceability. Proposals are due by November 10, 2026, and must be submitted in two separate volumes: a technical proposal and a business/price proposal. Evaluation is based on a best-value trade-off where technical merit, quality assurance plans, and past experience are significantly more important than price. Offerors must provide a minimum of three relevant examples of similar work from the past five years and a detailed project schedule. Mandatory submissions include the SARC (PROC-FRM-100) and Proposal Certifications (PROC-FRM-466) forms. The contract incorporates various Federal Acquisition Regulation (FAR) and Department of Energy Acquisition Regulation (DEAR) clauses, including strict prohibitions against racially discriminatory DEI activities under FAR 52.222-90 and compliance with the Buy American Act.
Nonferrous Metal (except Copper and Aluminum) Rolling, Drawing, and Extruding

POSTED

9 days ago

DEADLINE

in 13 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS