Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

AT&T Laguna Creek Trailhead WCF

Forecast
PLNP2024-00087State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Sacramento County has approved the construction of the AT&T Laguna Creek Trailhead Wireless Communication Facility under solicitation PLNP2024-00087. The project involves the installation of an 80-foot-tall stealth cell tower designed to look like a water tank within the Laguna Creek Parkway in Sacramento, California. The facility will occupy an 836-square-foot lease area enclosed by an 8-foot perimeter wall and will feature 12 panel antennas and 12 remote radio units mounted interiorly. To protect against environmental risks, equipment cabinets and a diesel backup generator will be housed on a raised steel platform positioned above the 100-year floodplain and secured by an 8-foot chain link fence. The project scope includes the establishment of a 20-foot-wide nonexclusive utility and access easement and requires a Use Permit, Special Development Permit, and Design Review. Environmental compliance has been addressed through a Mitigated Negative Declaration under the California Environmental Quality Act, which includes a monitoring program and the payment of Fish and Wildlife and Clerk Recorder fees. The project is being executed by New Cingular Wireless PCS via Epic Wireless LLC, with administrative oversight provided by the Sacramento County Planning and Environmental Review office.

General Info

Sacramento County approved AT&T to build a stealth cell tower at Laguna Creek.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more

Full Description

Show more
The project applicant will construct a new AT&T wireless communication facility (WCF) disguised as an 80-foot-tall stealth water tank cell tower within the Laguna Creek parkway. The new WCF will be located within a 22-foot x 38-foot lease area (836 square feet), surrounded by an 8-foot-tall perimeter wall with openings at the bottom to allow free flowing of drainage. The facility will require 12 panel antennas and 12 remote radio units, all of which will be mounted interiorly. Equipment cabinets and a diesel backup generator will be enclosed by an 8-foot-tall chain link fence, located on a steel platform, raised to be above the 100-year floodplain. The WCF and lease area will accommodate current and future cell carrier equipment and backup emergency generators. Additionally, the project includes a new 20-foot-wide nonexclusive utility and access easement as well as a request for Use Permit, a Special Development Permit and Design Review.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
ACT-1427-00 Construction Cycle 10 (CC10) Concrete Test Pavement Construction at Wm. J. Hughes Technical Center Atlantic City, NJ
Solicitation # act-1427-00-construction-cycle-10-cc10-concrete-test-pavement-construction-wm-j-hughes-technical
Parsons Corporation is soliciting bids for the Construction Cycle 10 project at the William J. Hughes Technical Center in Atlantic City, New Jersey, supporting the FAA Airport Technology Research and Development branch. The scope of work involves the controlled demolition of existing pervious runway test pavement and the construction of new concrete test slabs measuring approximately 310 by 52.5 feet with a thickness of 15.5 inches. Key requirements include providing aggregate subbase, updating the asphalt base course to a stabilized drainable base, and performing minor design adjustments to plans and specifications. The subcontractor is responsible for procuring all materials, managing waste disposal, and coordinating professional engineering and laboratory services for geotechnical design and roadway materials testing. The project includes rigorous material characterization tests such as California Bearing Ratio and Plate Load tests, with critical operations phased to allow for continuous subgrade adjustments. Work is primarily scheduled for normal business hours, Monday through Friday, though some after-hours and weekend work may be required. This solicitation is set aside for various small business categories, including VOSB, SDVOSB, WOSB, and HUBZone certified firms.
Parsons Corporation

POSTED

about 2 hours ago

DEADLINE

in 2 months
View Details
NAICS: 237130
New
International
314E-2026 132-11 kV MAIN SUBSTATIONS AT AJMAN CITY (ACMN) IN AJMAN AREA AND 132-11 KV AWAFI (AWMN) IN RAK AREA, AND 132KV UNDERGROUND CABLING WORKS
Solicitation # 314E/2026
Etihad Water & Electricity has issued solicitation 314E/2026 for a lump-sum turnkey project involving the design, engineering, supply, construction, installation, testing, and commissioning of 132/11kV main substations and associated 132kV underground cabling works in the United Arab Emirates. The scope of work is divided into several key components, including the construction of new main substations at Ajman City (ACMN) and Awafi (AWMN), protection modifications for BYMN-SAMN, and LILO connections for both ACMN and AWMN. Additionally, the project includes approximately 22 km of new 132kV underground cabling works for BYMN-SAMN and approximately 5 km of LILO connections for AWMN. Eligible bidders must be registered in the SAP Ariba e-procurement system and hold a valid EtihadWE Prequalification Certificate, a requirement that also extends to all proposed subcontractors for electrical, civil, MEP, and underground cable works. Proposals must be submitted via SAP Ariba with separate technical and commercial uploads by December 14, 2026. Each quoted lot must be accompanied by an irrevocable and unconditional bank guarantee issued by a UAE-based bank, valid for at least 180 days from the tender opening date. All works must adhere to EtihadWE standards and specifications.
Etihad Water & Electricity

POSTED

1 day ago

DEADLINE

in 27 days
View Details
NAICS: 237130
New
SLED
Solar Interconnection Grant
Solicitation # RFA-131767
The Solar Interconnection Grant Program, administered by the Virginia Department of Energy, provides funding to public bodies to offset the costs of connecting distributed solar energy systems to the electric grid. Established via Senate Bill 659 and House Bill 683, the program targets barriers to public-sector solar development by funding infrastructure upgrades, including transformers, relays, SCADA/telemetry, protection equipment, metering modifications, and necessary engineering services. Eligible projects may be behind-the-meter or front-of-the-meter and must be located at previously developed project sites. The anticipated period of performance ranges from 6 to 18 months. Applications must be submitted through the Virginia Energy Grant Portal by January 15, 2027. Awards are competitive and based on a 100-point scoring system that evaluates organizational summaries, project scope, readiness, interconnection details, and community benefits. Applicants must adhere to strict word counts and submit a master PDF and two Excel files. Grant recipients must comply with Virginia procurement laws and prevailing wage requirements mirroring federal Davis-Bacon standards. Administration requires monthly invoicing by the 15th of each month, quarterly progress reports, and final verification via equipment lists and photos. Payments are issued upon agency acceptance of work, with a potential 5% retainage for construction projects and a final audit before closing.
Virginia Department of Energy

POSTED

2 days ago

DEADLINE

in about 2 months
View Details
NAICS: 237130
New
SLED
Fiber to the Home Phase 2 - Rebid
Solicitation # 50010
The City of Hudson, Ohio, is soliciting bids for the Fiber to the Home Phase 2 Rebid, a capital improvement project focused on expanding fiber optic infrastructure. The scope of work includes the installation of approximately 49,000 lineal feet of 1.5-inch HDPE fiber conduit and 52,000 lineal feet of 2x1.5-inch HDPE fiber conduit using horizontal directional drilling. Additionally, the project requires the installation of 29,000 lineal feet of aerial fiber, 174,000 lineal feet of fiber optic cable of various strand counts, and the placement of underground fiber vaults and handholes. Bidders are required to provide pricing for labor only, and the work includes all necessary splicing, testing, clearing, grubbing, and site restoration to pre-construction conditions. The project is governed by the City of Hudson Engineering Standards and ODOT Construction and Material Specifications, with a substantial completion deadline of December 3, 2027, and final completion by December 17, 2027. Bidders must submit electronic proposals via Bid Express and provide a Statement of Bidder's Qualifications demonstrating at least three years of experience in similar projects. The contract mandates compliance with Ohio Revised Code Chapter 4115 regarding prevailing wage rates and requires the provision of bid, performance, and payment bonds, as well as a maintenance bond equal to 10 percent of the final contract price. Evaluation for award will be based on compliance with requirements, financial ability, and the responsibility and qualifications of the bidder.
City of Hudson

POSTED

3 days ago

DEADLINE

in 21 days
View Details
NAICS: 237130
New
SLED
On-Call Utility Civil Construction Services
Solicitation # CS 11-26-04
Alameda Municipal Power (AMP) is seeking on-call civil construction services to support its electric distribution system in the City of Alameda, California. The scope of work covers a two-year term and includes the installation, repair, and replacement of underground electrical and fiber conduits, utility boxes, transformer pads, and foundations, as well as surface restoration, excavation, and trenching. The contract is structured as a master agreement with a maximum combined not-to-exceed value of $1,000,000 across up to two on-call contracts, with specific work assigned via individual task orders. Awards are based on the lowest responsible bidder, with task orders generally awarded by lowest price, though AMP may consider expertise, performance history, and continuity of work. Bidders must demonstrate sufficient capacity, experience, and a satisfactory performance record, with a preference given to local businesses when labor quality and price are equal. Required submissions include a non-collusion declaration, a subcontractor list, and proof of DIR registration. The successful bidder must provide a full-time qualified superintendent on-site and adhere to prevailing wage requirements and strict safety standards, including specific shoring and bracing plans for excavations five feet or deeper. Financial security is required via a bid security of 10% of the maximum bid amount, while the awarded contractor must provide performance and payment bonds for 100% of the contract price. Technical acceptance is based on rigorous inspection criteria for various construction elements, including conduit alignment, base preparation for vaults, and compaction testing. Bids must be submitted electronically through the Bid Portal by December 17, 2026.
Engineering and Operations

POSTED

4 days ago

DEADLINE

in about 1 month
View Details

More opportunities from California → Sacramento County

Same awarding agency

NAICS: 237310
SLED
Alta Arden Expressway Phase I
Solicitation # PLER2024-00142
The Sacramento County Department of Transportation is implementing the Alta Arden Expressway Phase I project to enhance pedestrian and bicycle infrastructure along approximately 0.9 miles of the expressway, from 390 feet west of Howe Avenue to Fulton Avenue. The scope of work includes installing buffered bike lanes, filling sidewalk gaps with six to ten-foot-wide paths, installing new streetlamps, and performing roadway restriping, pavement rehabilitation, and resurfacing. Additionally, the project involves modifying traffic signals at Howe Avenue, Bell Street, and Fulton Avenue to include ADA-accessible pedestrian displays and audible push buttons, as well as the potential relocation of gas, electric, water, sewer, and telecommunication facilities. The project is governed by CEQA and NEPA requirements, with a Mitigated Negative Declaration adopted to ensure no significant environmental effects. Key compliance measures include adhering to Sacramento Metropolitan AQMD Basic Construction Emission Control Practices and following specific hazardous waste protocols, such as the disposal of excavated soil west of Markston Road at licensed facilities. The project also incorporates tribal cultural resource consultations per AB 52 and utilizes a Road Construction Emissions Model to monitor air quality impacts. The project was officially approved by Sacramento County on July 14, 2026, under the coordination of the Environmental Coordinator.
Highway, Street, and Bridge Construction

POSTED

26 days ago

DEADLINE

N/A
View Details
NAICS: 237120
SLED
Kiefer Landfill Gas Utilization Project
Solicitation # PLER2024-00137
Kiefer Landfill Generating III, LLC is proposing to develop a renewable natural gas facility at the Kiefer Landfill in Sacramento County with a production capacity of 8,000 standard cubic feet per minute. The project will capture and process landfill gas to remove moisture and impurities, upgrading it to pipeline-quality methane that meets air quality standards. A new pipeline will be constructed to transport the purified gas to existing Pacific Gas & Electric infrastructure, with two proposed routes both beginning at the landfill and traveling northwest along Kiefer Boulevard before turning north along Sunrise Boulevard to terminate near the intersection of Sunrise Boulevard and Douglas Road. Depending on the selected route, the pipeline will connect to PG&E’s system via either a compressor station or a metering and regulating station located near designated property parcels on Douglas Road. The pipeline alignment is planned to utilize public rights-of-way and existing private easements to minimize land use impacts. The project is being managed under Sacramento County’s oversight, with environmental coordination handled by Julie Newton, and key stakeholders including applicant Andrew Petric of NextEra Energy and Project Manager Kathalyn Tung of MBaker International. The initiative is part of broader efforts to advance renewable energy by converting landfill emissions into usable natural gas, supporting regional decarbonization goals. The facility and pipeline will be sited entirely within Sacramento County, with the final interconnection point targeting PG&E’s distribution or transmission system in the 95683 zip code area. The project was posted as a forecast on June 11, 2026, and is currently undergoing environmental review under California’s CEQA process, with no set-aside or NAICS classifications provided at this stage.
Oil and Gas Pipeline and Related Structures Construction

POSTED

about 1 month ago

DEADLINE

N/A
View Details
NAICS: 238910
SLED
Bar None Auction
Solicitation # PLNP2023-00290
The Bar None Auction project, identified by control number PLNP2023-00290, involves the development of three parcels totaling approximately 47 acres at 6190 Bradshaw Road in Sacramento County, California. The project consists of constructing an online auction business facility featuring a 21,510 square foot two-story office building, a 12,800 square foot industrial shop for repairs, a guard kiosk, and a customer patio. Site infrastructure includes approximately ten acres of paved parking and vehicle storage, a 30-acre graveled auction yard for track-equipped equipment, a closed-cycle wash rack, a 200,000 to 250,000 gallon water tank with a pump house, and above-ground fuel storage tanks for diesel and gasoline. The site also incorporates 6.5 acres for stormwater pretreatment detention and retention. Environmental assessments indicate that grading will permanently impact 3.82 acres of seasonal wetlands. The project has undergone a Mitigated Negative Declaration process to address impacts on air quality, greenhouse gas emissions, and biological resources, specifically regarding migratory birds and western burrowing owls. Compliance requires adherence to the South Sacramento Habitat Conservation Plan, the use of orange construction fencing to limit ground disturbance, and biological monitoring during construction. Operational hours are set for Monday through Friday, 8 a.m. to 5 p.m., with online auctions held every second Saturday of the month. The project is administered by Sacramento County, with an initial administrative deposit of 9,400 dollars provided by the applicant.
Site Preparation Contractors

POSTED

about 2 months ago

DEADLINE

N/A
View Details
NAICS: 237310
SLED
Sacramento International Airport Master Plan Update
Solicitation # PLER2024-00162
The Sacramento County Department of Airports is overseeing the design and construction of a new Airfield Maintenance (AFMX) facility located in the north airfield area of the Sacramento International Airport campus, specifically near the intersection of Delta Road and Earhart Drive. The project, identified by control number PLER2024-00162, involves the creation of a main building that will house administrative offices, conference rooms, a break room, and locker rooms, alongside operational spaces including specialized shop areas, equipment bays, a loading dock, and an emulsion cleanup area. A critical component of the project is the transition of the site from landside to airside. While the site will remain landside during the construction phase, the Aircraft Operations Area fence will be relocated upon completion to encompass the facility. This transition includes the removal of existing gates on the east side and the installation of new gates on the west end to provide airside access. The project was approved on August 25, 2026, and complies with the California Environmental Quality Act through an addendum to the Sacramento International Airport Master Plan Update Supplemental EIR, confirming that existing mitigation measures are sufficient. Primary points of contact for the project include Environmental Coordinator Julie Newton and Senior Airport Planner Zach Frese.
Highway, Street, and Bridge Construction

POSTED

2 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS