Baldwin Lake and Tule Pond Restoration Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Baldwin Lake and Tule Pond Restoration Project, located at 301 North Baldwin Avenue in Arcadia, California, is an initiative approved by the Los Angeles County Board of Supervisors on June 16, 2026. Managed by the Los Angeles County Flood Control District as the lead agency and the Department of Parks and Recreation, the project focuses on enhancing the aquatic ecosystem and infrastructure of the site. Key activities include the removal of sediment from both Baldwin Lake and Tule Pond, the installation of a liner and aeration units at the lake, and the restoration of the lake's historic retaining wall for preservation purposes. Additionally, the scope includes the realignment of one storm drain outlet and improvements to three others to minimize erosion, the installation of a new boat launch, and the replacement or improvement of surrounding landscaping. The project is compliant with the California Environmental Quality Act, operating under a Mitigated Negative Declaration adopted on March 17, 2026. The Board of Supervisors has delegated authority to the Director of LA County Parks to execute a Youth Employment Plan and a Funding, Use and Maintenance Agreement. Administrative oversight is provided by Matthew Frary, PE, and Jui Ing Chien, with the project adhering to the Public Resources Code. While the project is categorized under NAICS code 237990, specific contract values and performance periods were not provided in the available documentation.

General Info

LA County project restoring Baldwin Lake and Tule Pond via ecosystem and infrastructure upgrades.

Agency

California → Los Angeles County Flood Control District

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Baldwin Ave and I-210 Freeway, Arcadia, CA, 91007

Set-Aside

NONE

Documents

(2)

Notice of Determination - Baldwin Lake and Tule Pond Restoration Project

PDFnotice-of-determination

260617 - Notice of Determination for Baldwin Lake and Tule Pond Restoration Project

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Los Angeles County Flood Control District
Contacts2 people available
OfficeN/A
Organization / Agency
California → Los Angeles County Flood Control District
Office AddressN/A
Contacts
Matthew FraryAssistant Deputy Director
Jui Ing ChienPark Planner

Full Description

Show more
On June 16,2026, the Los Angeles County Board of Supervisors (Board) approved the following actions for the County, acting through the Department of Parks and Recreation related to the previously approved Baldwin Lake and Tule Pond Restoration Project (Project) Delegated authority to the Director of LA County Parks to execute a Funding, Use and Maintenance Agreement and a Youth Employment Plan. Acting on behalf of the County of Los Angeles as a responsible agency under the California Environmental Quality Act (CEQA), the Board also found the actions to be within the scope of the Mitigated Negative Declaration adopted by the Board, acting on behalf of the Los Angeles County Flood Control District as lead agency, when the project was approved on March 17, 2026, adopted an MMRP and found that there are no further findings under CEQA are necessary. The approved Project consists of the removal of sediment from Baldwin Lake (Lake) and Tule Pond (Pond), installation of liner and aeration units at the Lake to improve the aquatic ecosystem, realign one storm drain outlet and improve three existing storm drain outlets to minimize erosion; restore the Lake's historic retaining wall for historic preservation, install a new boat launch and improve/replace landscaping around the Lake and Pond.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 6 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

about 18 hours ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS