Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Baytrans Inc. Trucking Service

Forecast
DR25-109State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Baytrans Inc. Trucking Service Facility project, identified by solicitation number DR25-109, involves the development of a cargo truck receiving, servicing, and storage facility located at 1440 Vinci Avenue, Sacramento, California. The project site spans 4.7 acres and will feature a 19,600 square foot light industrial pre-engineered metal building that includes office space, service bays, a break room, and a warehouse shop. Site infrastructure will include 79 trucking parking spaces, 46 passenger vehicle parking spaces, and perimeter security fencing and gates to separate vehicle types. Additional site improvements include stormwater bio-retention basins and utility connections for water, sewer, and electricity via the City of Sacramento and the Sacramento Municipal Utility District. The project requires the removal of an existing single-family home currently on the site and is designed to support up to 12 employees. The City of Sacramento Community Development Department has issued a Notice of Exemption dated January 21, 2026, determining that the project is exempt from further environmental review under CEQA guidelines as it constitutes infill development consistent with the 2040 General Plan. Primary points of contact for the project include Senior Planner Charles Tschudin and Associate Architect Armando Lopez Jr.

General Info

Baytrans Inc. building a trucking facility at 1440 Vinci Avenue, Sacramento, California.

Agency

California → City of Sacramento

Place of Performance

Sacramento, CA, 95838

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Sacramento
Contacts2 people available
OfficeN/A

Full Description

Show more
Baytrans, Inc. (Baytrans) Trucking Service Facility supports Baytrans trucking operations services, which includes a 19,600 square foot (sf) light industrial pre-engineered metal building (housing an office, service bays, a break room and warehouse storage and shop), 79 trucking parking spaces, 46 passenger vehicle parking spaces and security fencing and gates around the perimeter on 4.7 acres. Passenger vehicle parking is separated from truck parking and service bays by a security fence and controlled gate. There would be up to 12 employees. The site improvements also include stormwater bio-retention basins, utility connections with City of Sacramento water and sewer service and a Sacramento Municipal Utility District (SMUD) electricity power box. The site currently has a single-family home, which will be removed as part of the proposed project, and is graveled for overnight truck parking. There are no other site improvements under existing conditions. The trucking facility would receive, service and store cargo trucks.

Similar Contracts

Same NAICS industry code

NAICS: 236210
New
SLED
HOR-2026-001-CMR-RFQ
Solicitation # 49965
Horizon/McClellan LLC is soliciting a Construction Manager at Risk (CMR) for the redevelopment of a 3.33-acre site at 160 William F. McClellan Highway in East Boston, Massachusetts. The project involves the construction of a 150,000 square foot, 2-story all-electric warehouse with an estimated cost of $75 million. The facility will serve as a general warehouse, receiving, and distribution center for Marketplace CRDC, LLC, and must include truck docks, freezers, refrigeration, and vehicle chargers. The project requires LEED Platinum certification and must be executed in accordance with M.G.L. Chapter 149A, Massport's Construction Management At-Risk Procedures dated January 2026, and a Project Labor Agreement (PLA). The selection is a two-phase process beginning with a qualifications-based evaluation to shortlist competent firms for a subsequent Request for Proposals (RFP). Qualified respondents must be DCAMM certified and provide a surety letter confirming the ability to provide performance and payment bonds for 110% of the construction estimate. Evaluation criteria include the proposed CMR team, experience in Virtual Design and Construction (VDC) and LEAN construction, and a demonstrated history of collaboration with architects and consultants. Qualifications Statements, which must be signed under the pains and penalties of perjury and submitted in PDF format via Bid Express, are due by November 25, 2026. There is no set-aside status for this solicitation.
Horizon/McClellan LLC

POSTED

about 8 hours ago

DEADLINE

in 6 days
View Details
NAICS: 236210
New
Federal
Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB
Solicitation # RFP-376508-CD
The Central Utility Building (CUB) Addition and Renovation project, designated as UIP Subproject 1-CUB, is a firm-fixed-price construction effort at the Fermi National Accelerator Laboratory in Batavia, Illinois. The scope involves building an addition to accommodate new chillers and increasing chilled water capacity, as well as renovating the existing CUB exterior shell, roof, and internal systems. Key technical requirements include the installation of new fire protection, fire alarm, and low-to-medium voltage power systems, alongside civil utility upgrades and selective demolition. The project is governed by a strict schedule tied to the accelerator shutdown, with a Notice to Proceed expected by December 30, 2027, and a final completion deadline of October 1, 2029. The solicitation is a no set-aside procurement using a tradeoff best-value source selection method. Technical proposals are weighted at 70 points, focusing on organizational structure, a detailed work plan with safety and quality controls, and past performance involving projects valued at $35 million to $50 million. The business and price proposal accounts for 30 points. Offerors must provide a bid guarantee of at least 20% of the bid price, not to exceed $3 million, and must comply with Davis-Bacon wage standards, the Buy American Act, and BABA Act requirements. All work must be performed within the specified shutdown window, with critical milestones for the CUB extension and upgrades spanning January 2028 through September 2029.
Fermilab - DOE Contractor

POSTED

about 18 hours ago

DEADLINE

in 28 days
View Details
NAICS: 236210
New
Federal
Tinker AFB 2026 Multiple Award Construction Contract (MACC)
Solicitation # FA8137-26-R-0040
The Tinker AFB 2026 Multiple Award Construction Contract (MACC) is a competitive Indefinite Delivery Indefinite Quantity (IDIQ) solicitation for general construction services at Tinker Air Force Base, Oklahoma. The contract encompasses a broad range of sustainment, maintenance, repair, alteration, renovation, and minor construction projects. Project execution is categorized into three methods: Design-Build, Construction with Limited Design, and Construction Only. The contract is structured with a five-year base period and one five-year option, totaling a ten-year period of performance, with an estimated aggregate maximum value of $950 million. This is a partial small business set-aside. The government utilizes a Highest Technically Rated Offeror (HTRO) source selection process based on a Minimum Technical Threshold Rating (MTTR). Offerors are evaluated on relevant construction experience, design experience, certifications/licenses, and staffing. To be eligible for award, offerors must meet specific point thresholds: 8,190 points for the Small Business pool (Appendix C) and 7,140 points for the Full and Open pool (Appendix D). Proposals must be submitted electronically by November 30, 2026. Key requirements include registration in the System for Award Management (SAM), adherence to TAFB facility standards, and the provision of performance and payment bonds. Funds for the acquisition are anticipated to be available in FY27.
FA8137 Afsc Pzioc

POSTED

about 18 hours ago

DEADLINE

in 14 days
View Details
NAICS: 236210
New
SLED
749 West El Camino Real Mixed-Use Project
Solicitation # 2023050251
The 749 West El Camino Real Mixed-Use Project in Mountain View, California, involves the demolition of an existing restaurant and bank building, along with associated parking and landscaping, to develop two new structures. The project consists of a two-story bank building and a six-story mixed-use building featuring 299 multi-family residential units, including 33 reserved for low- to very-low-income households, and up to 13,465 square feet of ground-floor commercial space. The development includes two levels of underground parking, a public plaza on El Camino Real, and the preservation of existing artwork from the original site. The project utilizes the State Density Bonus Law to achieve a floor-area-ratio of approximately 3.05 and adheres to Tier 1 development standards of the El Camino Real Precise Plan. The project is subject to strict environmental and safety compliance measures, including a construction health risk assessment for nearby residential units and a toxic assessment report for soil contaminants. Key infrastructure requirements include the installation of 458 total bicycle parking spaces, ADA-compliant curb ramps, and safety improvements to the Castro and El Camino intersection. Construction mandates prohibit the closure or narrowing of sidewalks and require traffic control plans approved by the Public Works Department in accordance with the California Manual of Uniform Traffic Control Devices. Additionally, the project must comply with CALGreen Tier 2 electric vehicle requirements, implement a Travel Demand Management program, and provide replacement trees for any removed Heritage Trees. The project was approved by the City Council on November 18, 2025, following a Final Environmental Impact Report.
City of Mountain View

POSTED

about 22 hours ago

DEADLINE

N/A
View Details
NAICS: 236210
New
Federal
Y--IE181 - WHS Greenhouse Construction
Solicitation # 140A2327Q0297
Solicitation 140A2327Q0297 is a fixed-price contract set aside exclusively for Indian Small Business Economic Enterprises (ISBEE) to design and install an educational greenhouse facility at Wingate High School in Fort Wingate, New Mexico. The project, estimated between $100,000 and $250,000, involves a comprehensive scope of work including foundation installation, utility connections, structural assembly, glazing, and the implementation of environmental controls, heating, and irrigation systems. Work must be performed at a high-desert site at 6,900 feet elevation on an occupied K-12 campus and must be completed within 120 calendar days from the Notice to Proceed. Award will be made to the lowest priced responsive and responsible offeror based on Lowest Price Technically Acceptable (LPTA) procedures. Technical proposals must be rated acceptable in key project management, technical support, and quality control planning to be eligible. Required submissions include a signed quote, UEI number, and specific Indian Economic Enterprise representations. Contractors must hold appropriate New Mexico contractor licenses for building, electrical, and mechanical/gas work, as well as any necessary Navajo Nation tribal business licenses. Additionally, a bid bond is required for any quote exceeding $35,000, and all on-site personnel must pass background investigations before work begins.
Indian Education Acquisition Office

POSTED

2 days ago

DEADLINE

in 11 days
View Details
NAICS: 236210
New
SLED
Public Safety Building – Package 2, Project 20-49
Solicitation # R271158
The City of Mountain View is soliciting the prequalification of General Contractors for the Public Safety Building – Package 2 (Project 20-49). The project involves the demolition and replacement of the existing Police Department and Fire Administration facility at 1000 Villa Street with a new approximately 75,000-square-foot, three-story Public Safety Headquarters. The facility will house Police Department operations, an Emergency Communications/Dispatch Center, Fire Administration offices, an Emergency Operations Center, and various support spaces including an auditorium, fitness facilities, and K-9 training areas. The project is designed to meet the latest Mountain View Green Building Codes, achieve LEED Gold certification, and satisfy essential facility seismic performance requirements. Construction will be executed in three phases to maintain uninterrupted 24/7 emergency operations, beginning with the construction of the new building, followed by the creation of secure parking and the demolition of the old facility, and concluding with public parking and site improvements. This is a covered project under the City of Mountain View Community Workforce Agreement, requiring compliance with state prevailing wage requirements and DIR registration. Prequalification is based on a weighted scoring system regarding contractor conduct and performance, with a maximum threshold of 35 points for qualification. Interested contractors must submit a single signed PDF via the Bidnetdirect.com portal by December 18, 2026, including a completed questionnaire, financial statements, and safety documentation. Formal bidding is anticipated for spring 2027.
City of Mountain View

POSTED

3 days ago

DEADLINE

in 28 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS