Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

California Vegetation Treatment Program (CalVTP) Update

Forecast
2019012052State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

special-notice

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Marin County Open Space District
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Kelly HydeOpen Space Planner

Full Description

Show more
The purpose of the proposed project is to create and maintain a continuous fuel reduction and forest health restoration zone around the City of Mill Valley to reduce wildfire risk including wildfire intensity and rate of spread, and to provide strategic locations for firefighters and emergency personnel to fight a wildfire in the event of ignition. The proposed project would conduct vegetation management activities to create an approximately 23-mile-long continuous shaded fuel break within a 345-acre project area in the greater Mill Valley area and a WUI fuels reduction area up to 328 acres adjacent to the fuel break. The proposed project would reduce excess and ladder fuels within a fuel break 200-foot wide and adjacent wildland areas to restore ecological health to resemble pre-fire suppression conditions by enhancing native, fire-resilient plant communities, primarily through invasive species removal, removing lower tree limbs, thinning small trees and understory species, and removal of dead and down woody debris. Treatment methods range include manual, ground-based mechanical treatment, prescribed herbivory, and the use of herbicides. Treatment methods and prescriptions would vary by cover type in the project site. The condition of the treatment areas after treatment would be monitored annually or as appropriate depending upon the vegetation types and presence of broom, and maintenance treatments would be performed as needed. Project implementation would begin in Fall 2025. Manual and ground-based mechanical treatments would continue through 2030. Prescribed herbivory, herbicide application, and pile burning would occur as needed. The proposed project includes the following two primary components: 1. Initial vegetation treatment and maintenance of a 23-mile-long continuous shaded fuel break within a 345-acre analysis area around structures in the WUI, at the periphery of communities adjacent undeveloped open spaces; and 2. Initial vegetation treatment and maintenance within several extended areas of vegetated open space between the fuel break and structures or in areas with structures intermixed in heavily vegetated areas within the 328-acre Wildland Urban Interface (WUI) fuels reduction analysis area.

Similar Contracts

Same NAICS industry code

NAICS: 561730
New
SLED
Parks and Recreation Maintenance Mowing Group 1
Solicitation # 270180
The City of Tucson is soliciting proposals for a term contract to provide professional mowing, string trimming, and edging services for Parks and Recreation Maintenance Group 1. This solicitation, number 270180, requires contractors to be licensed landscape contractors (B-3, B-5) and to provide all necessary labor, equipment, and materials. The scope of work includes maintaining various sites, such as Abraham Lincoln Park and Reid Park Annex Fields, with seasonal frequencies requiring weekly service from May through September and monthly service from October through April. Contractors must implement a comprehensive quality control program, submit weekly performance reports, and adhere to strict guidelines regarding chemical applications and equipment use. The contract is subject to extensive regulatory and federal compliance mandates, including HUD and FTA terms, ARPA requirements, and Davis-Bacon prevailing wage rates. Key obligations include adherence to the Americans with Disabilities Act, non-discrimination policies, and stringent cybersecurity frameworks such as NIST and ISO/IEC 27001. Proposals must be submitted via the City's online procurement portal by November 12, 2026, and must include a pricing proposal, a signed Offer and Acceptance form, and a valid business license. Evaluation may include interviews and investigations into the offeror's financial stability and competence.
Parks and Recreation

POSTED

about 3 hours ago

DEADLINE

in 11 days
View Details
NAICS: 561730
New
SLED
Blue Heron Golf Course Grounds Maintenance Five Year Contract
Solicitation # BPM059646
The County Commissioners of Queen Anne's County are soliciting proposals for a five-year grounds maintenance contract at the Blue Heron Golf Course in Stevensville, Maryland, spanning from January 1, 2027, to December 31, 2031. The selected contractor will be responsible for comprehensive turf care, including mowing, fertilizing, weed control, and aeration of tees, greens, fairways, and roughs, as well as bunker maintenance, light tree pruning, and the operation and repair of the irrigation system. The contractor must provide all necessary equipment and maintain the surrounds of the maintenance building, while the owner will provide the maintenance shop area and cover electrical costs for the irrigation system. Proposals will be evaluated based on price and experience, with a mandatory requirement that the contractor or their principal representatives possess at least six years of experience as a golf course superintendent. Submissions must be delivered in three paper-bound hard copies by December 1, 2026, and must include a qualification statement, fee summary, disclosure form, and SDAT registration. Special consideration may be given to local vendors who allocate 50 percent or more of the bid value to businesses within Queen Anne's County. Quality standards will be verified through monthly meetings, and any disputes regarding maintenance quality will be arbitrated by representatives from the University of Maryland's College of Agriculture and Natural Resources.

POSTED

about 4 hours ago

DEADLINE

in 25 days
View Details
NAICS: 561730
New
SLED
Lot Mowing and Trash/Debris Removal and Disposal Services
Solicitation # 26-TG01452
Solicitation 26-TG01452 is an Invitation to Bid issued by Hernando County, Florida, for as-needed lot mowing and trash/debris removal and disposal services. The contract will primarily support the Code Compliance Department for non-grant related work, with potential use by the Housing and Supportive Services Department for projects tied to Community Development Block Grants. Services are to be performed at various unimproved lots and residential or commercial improved properties throughout the county. Key performance standards require grass to be cut to a height of three inches, with bush hogging utilized for field grasses. All collected debris must be disposed of at the Hernando County Northwest Waste Management Facility, and contractors must provide individual weight slips and dump charges with their invoices as proof of compliance. This is a Firm Fixed Price term contract with bids submitted electronically via the eProcurement Portal by November 9, 2026. Evaluation is based on price, completeness, compliance, and the bidder's resources, including a mandatory list of equipment and personnel. Required equipment includes a commercial mower, a bush hog or tractor, and a truck and trailer capable of hauling 1,000 pounds. The county reserves a local preference for tie-breaking in favor of businesses located within Hernando County. Awarded vendors must undergo an equipment inspection by Code Enforcement before the intent to award is finalized. Administrative requirements include invoicing within ten business days of work completion, with payments made via ACH in no less than forty-five days. The contract incorporates various federal and state regulations, including the Davis-Bacon Act for prevailing wages, the Build America, Buy America Act, and specific record retention requirements of three years for federal grant funding. Contractors must adhere to standard work hours of Monday through Friday, 7:00 AM to 3:00 PM, and provide a current certificate of insurance before commencing work. Bidders are required to submit at least three references from similar projects completed within the last seven years.
Code Enforcement

POSTED

about 6 hours ago

DEADLINE

in 3 days
View Details

More opportunities from California → Marin County Open Space District

Same awarding agency

NAICS: 237990
New
SLED
Buck Gulch Falls Creek Restoration and Trail Improvement ProjectThe Buck Gulch Falls Creek Restoration and Trail Improvement Project aims to restore Arroyo de San Jose Creek and its connected ephemeral streams while enhancing safe, sustainable, and inclusive trail access for all users along Spyglass Trail and Buck Gulch Falls Trail to Buck Gulch waterfall within the Ignacio Valley Open Space Preserve. Key improvements include installing two bridges to redirect visitor traffic away from the creek, adding a puncheon and boardwalk across unnamed streams, upgrading nearly 2,240 feet of existing trail, and realigning 850 feet of trail to move it away from eroding streambanks. The Buck Gulch Falls Trail will transition from hiker/equestrian use to hiker-only, and four fill slope walls will be constructed near the waterfall viewing area to stabilize the trail. Additional enhancements involve installing new fencing and signage, decommissioning and restoring 850 feet of degraded trail, and rehabilitating nearly 19,500 square feet of eroding streambank and riparian habitat. These efforts are designed to reduce environmental degradation, protect water quality, and preserve habitats for listed aquatic species by minimizing sedimentation and erosion. The project will employ erosion control measures such as straw wattles at trail transitions, aggregate base rock surfacing at bridge approaches, and seed and mulch applications on disturbed soils to support revegetation. All work aligns with the Regional Trail Management Plan policies, best management practices, Marin County Open Space District trail design standards, and its Inclusive Access Plan to ensure accessibility and sustainability. The initiative is led by the Marin County Open Space District with primary coordination handled by Senior Natural Resources Planner Jason Hoorn and Principal Environmental Planner Carrie Lukacic. The project was posted in June 2026 and is located in Novato, California, with the goal of creating a resilient, low-impact trail system that balances public access with ecological preservation in a sensitive riparian environment.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

N/A
View Details
NAICS: 237310
New
SLED
Cascade Canyon Trail Bridge Project
Solicitation # MCP 2026-07
The Cascade Canyon Trail Bridge Project, solicitation number MCP 2026-07, is a construction contract issued by the Marin County Open Space District for improvements within the Cascade Canyon Open Space Preserve in Fairfax, California. The project focuses on enhancing trail access, improving visitor safety, and reducing environmental erosion through the installation of two prefabricated weathered steel connector style truss recreational bridges with redwood decks. Bridge 1 will be 90 feet long and Bridge 2 will be 60 feet long, both with a width of 6 feet. The scope of work includes constructing concrete spread footings, installing engineered fill for bridge approaches, repairing rock riprap slope protection, and installing compacted road and trail surfaces. Additionally, the contractor will realign existing trails, decommission the High Water Trail and a Canyon Trail spur, and install split rail fencing and signage. The contract will be awarded to the lowest responsible and responsive bidder based on the Total Base Bid. Qualified bidders must hold a valid Class A License and demonstrate significant experience, including the successful completion of at least five similar projects in the San Francisco Bay Area and the submission of three similar or larger bridge project references. The project is divided into two phases: preconstruction activities must begin within 15 calendar days of the first Notice to Proceed, while on-site construction is scheduled to begin no earlier than August 1, 2027, with a duration of 48 working days. Key compliance requirements include adherence to 2025 Caltrans Standard Specifications, California Labor Code Section 6705 for excavation shoring, and the payment of prevailing wages as determined by the California Department of Industrial Relations. Bidders must provide a bid bond for 10% of the total bid amount, and the successful awardee must provide performance and payment bonds equal to 100% of the contract. Required certifications include Equal Employment Opportunity and Subcontractor Debarment and Suspension certifications. Bids must be submitted electronically by December 3, 2026.
Highway, Street, and Bridge Construction

POSTED

4 days ago

DEADLINE

in 27 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS