Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from California was posted on July 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CFD Sidewalk Replacement 2026

Closed
26-027-ITBState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. This heavy civil infrastructure project encompasses a broad scope of work, including site preparation, earthwork, asbestos abatement, tunneling, utility installation, paving, and electrical systems. The solicitation specifically targets qualified Small Business Enterprises, Veteran-Owned Small Business Enterprises, and Disadvantaged Business Enterprises, requiring SBE and VSBE firms to provide certification from the Department of General Services and the Port of Long Beach via the PlanetBids portal. The project is subject to the California Labor Code, prevailing wage rates, and a Project Labor Agreement. Firms performing onsite work must be signatory to collective bargaining agreements with specific trades or demonstrate the ability to maintain labor harmony. Funding is provided through multiple grants, including FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD, necessitating compliance with DBE Program requirements. Responsive bidders must hold a valid California Contractor’s license, provide acceptable insurance, and may be required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested firms must coordinate through the BuildingConnected system by the September 15, 2026, deadline.
Kiewit Infrastructure West Co.

POSTED

about 13 hours ago

DEADLINE

in 3 days
NAICS: 237310
New
SLED
NH-093-1(035) Farrington Highway Widening
Solicitation # B27000387
The Farrington Highway Widening project, solicitation B27000387, is an invitation for bids issued by the Hawaii Department of Transportation to develop an auxiliary lane between Nanakuli Avenue and Mohihi Street in the District of Ewa, Oahu. The scope of work includes excavation, cold-planing, paving, striping, signage, drainage structure modifications, and the installation of retaining walls. The estimated construction cost is between 35 million and 37 million dollars, with a performance period of 780 calendar days from the start work date. Bidders must hold a valid State of Hawaii General Engineering A license and submit their proposals via HiePRO by October 28, 2026. The contract will be awarded to the lowest responsible and responsive bidder based on the summation of unit bid prices and approximate quantities. Key requirements include the submission of a surety bid bond for proposals exceeding 25,000 dollars, as well as performance and labor and material payment bonds. The project adheres to federal and state regulations, including the Davis-Bacon Act, the Build America, Buy America Act, and Hawaii Revised Statutes Chapter 103D. Contractors are required to comply with strict prompt payment terms, paying subcontractors within 10 calendar days of receiving progress payments from the agency. Final acceptance is determined by the Engineer based on full compliance with contract documents, including specific quality standards for pavement smoothness and compaction.
Department of Transportation

POSTED

about 19 hours ago

DEADLINE

in about 2 months
NAICS: 237310
New
SLED
FY 2027 Patching and Repair Project
Solicitation # PE-66204-NONST-2027-000000005
The FY 2027 Patching and Repair Project is a unit price contract issued by the City of Walnut Grove, Georgia, for asphalt patching and mill, patch, and inlay services. The scope of work includes providing all labor, materials, and equipment necessary for repairs at various locations, such as Greenhill Way, Valley Drive, Woodland Circle, and Walnut Court. Key technical requirements include the use of asphalt containing hydrated lime and adherence to GDOT 652 and 653 standards for striping and marking, as well as MUTCD Chapter 6 for temporary traffic control. The contract term is 180 calendar days from the notice to proceed, with a mobilization period of 60 business days. Work is restricted to between 7:00 AM and sundown on weekdays, with specific restrictions for residential areas on weekends and a total prohibition of work on Sundays and select holidays. The contract will be awarded to the lowest responsible bidder who is prequalified by the Georgia Department of Transportation. Bidders must submit a comprehensive proposal including a 5% bid bond, bidder qualifications, and proof of insurance. The successful contractor is required to provide a 100% performance-payment bond and a certificate of insurance naming the City of Walnut Grove as additionally insured within seven days of the award. Payments are processed monthly based on certified invoices for services performed and accepted. Final payment is contingent upon the submission of all test results, including cores and photo reports, and the completion of a final site cleanup.
City of Walnut Grove

POSTED

about 20 hours ago

DEADLINE

in about 1 month
NAICS: 237310
New
SLED
MS1-00005 Massachusetts St 14th St to 23rd St Multimodal Improvements Project
Solicitation # 2600030
The MS1-00005 Massachusetts St 14th St to 23rd St Multimodal Improvements Project is a construction solicitation issued by the City of Lawrence, Kansas, with a response deadline of October 13, 2026. The project focuses on street maintenance and reconstruction, featuring the installation of 8,000 square yards of concrete separated bike lanes, pavement reconstruction via milling and overlay, storm sewer improvements, and the replacement of sidewalks, including two blocks of 5-foot-wide sidewalk infill. Additional work includes improvements at the 19th and Mass Streets intersection and partial disturbance of a 16-foot-wide grass planter strip. Contractors must coordinate concurrent relocation efforts with AT&T and Black Hills Energy, who are permitted to operate within the contractor's temporary traffic control. The contract requires substantial completion within 340 calendar days and final completion within 365 calendar days of the Notice to Proceed. Bidders must provide an electronic bid bond of at least 5 percent of the bid amount and are subject to KDOT required documents, Davis-Bacon and Related Acts, and Buy America domestic steel requirements. Evaluation for award considers total cost, bidder location, and Disadvantaged Business Enterprise participation efforts. Technical standards include NEMA TS-1 for traffic signals and NSF 61 for potable water materials. Payment is structured through a mix of unit pricing and lump sum for demolition, with payments due within 30 days after completion. Final acceptance by the City is followed by a joint inspection 11 months later.
MSO - CMED

POSTED

about 20 hours ago

DEADLINE

in about 1 month
NAICS: 237310
New
SLED
EMERGENCY CULVERT REPLACEMENT PROJECT¿ FOR THE UPSON COUNTY BOC - Rocky Bottom Road
Solicitation # PE-77031-NONST-2026-000000021
The Upson County Board of Commissioners is soliciting sealed bids for the Emergency Culvert Replacement Project on Rocky Bottom Road in Georgia. The scope of work involves two separate pipe crossings, specifically the demolition and replacement of approximately 60 linear feet of 84-inch corrugated metal pipe and 60 linear feet of 72-inch corrugated metal pipe, along with other improvements detailed in the project plans. All work must be completed within 45 consecutive calendar days following the receipt of the Notice to Proceed. Bidders must be properly licensed in the State of Georgia and comply with E-Verify requirements. A mandatory pre-bid conference is scheduled for September 22, 2026, at 10:00 AM at the Thomaston-Upson County Government Complex, with sealed bids due by 10:00 AM on October 6, 2026. Submission requirements include a bid bond of at least 5% of the base bid, while the successful contractor must provide performance and payment bonds each totaling 100% of the contract amount. Comprehensive insurance coverage is required, including general liability, commercial automobile liability, and worker's compensation, each with minimum limits of 1,000,000 dollars per occurrence or accident. The project is managed by Chris Brazell of EMC Engineering Services, Inc.
Upson County Board of Commissioners

POSTED

about 21 hours ago

DEADLINE

in 24 days

AI Contract Overview

Show more

The CFD Sidewalk Replacement 2026 project, solicitation 26-027-ITB, is a construction effort by the City of West Sacramento to repair damaged public sidewalks within Community Facilities Districts. The primary objective is to eliminate trip hazards and accessibility barriers caused by street tree root displacement. The scope of work includes the removal and replacement of 4-inch PCC sidewalk panels, installation of root barriers, and driveway crossing reconstruction in accordance with City Standard Details 202, 205, and 701. Contractors are responsible for sawcutting, legal disposal, subgrade preparation, root pruning, concrete finishing, utility notifications via USA North 811, and comprehensive traffic and pedestrian control. The project is structured in phases by Community Facilities District, with work authorized only through separate written Notices to Proceed. The City does not guarantee minimum quantities or dollar values and reserves the right to reprioritize or defer locations based on funding and operational needs. This is a public works project subject to California Labor Code section 1720 prevailing wage requirements and federal-aid construction provisions, including the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Executive Order 11246. Compliance with 29 CFR Part 1926 safety standards and FHWA-1273 federal-aid provisions is mandatory. Bidders must provide certifications regarding debarment and lobbying for awards exceeding 100,000 dollars and maintain insurance from providers with an A.M. Best rating of at least A VII. Responses are due by September 4, 2026.

General Info

West Sacramento sidewalk replacement project 26-027-ITB, focusing on accessibility and root barriers.

Agency

California → Capital Projects - ConstructionView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA, USA

Set-Aside

NONE

Documents

(12)

Standard Detail 701 - Tree Planting Detail

PDFsow

CFD Sidewalk Scope - bid specifications

PDFsow

City of West Sacramento Insurance Checklist

PDFspecifications

Standard Detail 202 - Southport Street Std. for Separated Curb Gutter & Sidewalk

PDFspecifications

26-027-ITB CFD Sidewalk Replacement 2026

PDFitb

26-027-ITB CFD Sidewalk Replacement 2026 811 Tracking Log

XLSXitb

CFD Sidewalk Replacement 2026 - Invitation to Bid

PDFitb

Standard Detail 205 - Driveway with Curb & Gutter Separate from Sidewalk

PDFspecifications

Section 11 – Concrete Curb, Gutter, Sidewalk and Driveways

PDFsow

CFD Sidewalk Replacement 2026 - Invitation to Bid

PDFifb

Contract for Services - West Sacramento Federal Boilerplate RFP 5.1.24

DOCX23 pagescontract-document

FHWA-1273 Federal Aid Construction Contract Provisions Oct 2023

DOCX14 pagescontract-provisions

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Capital Projects - Construction
Contacts2 people available
OfficeWest Sacramento, CA, 95691, USA
Organization / Agency
California → Capital Projects - Construction
View Agency Profile
Office AddressWest Sacramento, CA, 95691, USA
Contacts
Damir ArushanovProject Manager
Nikki AllisonConstruction Administrative Specialist

Interested Companies (36)

Show more
Lords Electric
SACRAMENTO, CA
AP Traffic Services
Mather, CA
ConstructConnect
Cincinnati, OH

See All 36 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The CFD Sidewalk Replacement 2026 Project addresses damaged public sidewalks within the City's Community Facilities Districts, primarily where street tree roots have displaced or cracked adjacent PCC panels. The affected panels present trip hazards and accessibility barriers along pedestrian routes serving residential neighborhoods. Work consists of removal and replacement of 4-inch PCC sidewalk panels per Standard Detail 202, with root barrier installation per Standard Detail 701 and driveway crossing reconstruction per Standard Detail 205 where applicable. All locations and corresponding square footages are identified in the Cost Table. Dimensions and photographs are provided for bidding only; field verification is required prior to bid submittal. All work shall conform to the City of West Sacramento Standard Specifications and Standard Details, including Section 11 and Standard Details 202, 205, and 701. Contractors shall anticipate sawcutting and legal disposal of existing panels; subgrade preparation and Class II aggregate base; root pruning and root barrier installation where roots are encountered; concrete placement, finishing, and curing; utility notification and location (USA North 811 / Government Code §4216); traffic and pedestrian control; protection of adjacent private property and improvements; and site restoration and cleanup. The Work is divided into phases by Community Facilities District (CFD). Each CFD, or group of CFDs, is authorized only by separate written Notice to Proceed issued by the City. The City does not guarantee any minimum quantity, number of locations, or dollar value of Work beyond the CFD(s) authorized. Continuation to additional CFDs is contingent upon satisfactory performance and is not a matter of right. Most locations abut private residences and require coordination with residents and close field coordination with the City Project Manager. The City reserves the right to reprioritize, add, remove, or defer locations based on funding availability, inspection findings, or operational needs.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS