Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on July 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CFD Sidewalk Replacement 2026

Closed
26-027-ITBState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, site clearing, shoring, and subsurface investigation. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with the supply of ready mix and precast concrete. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. Qualified bidders must possess a valid California Contractor license and provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested firms must be certified by recognized agencies such as the SBA, MBDA, or CUCP prior to the bid opening. The deadline for responses is November 18, 2025, at 2:00 p.m., with invitations and instructions managed through the Building Connected system. Primary contact for this solicitation is Lead Estimator Ken Johnston.
Kiewit Infrastructure West Co.

POSTED

about 6 hours ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
Environmental Trust Department, Owhi Flats 2026
Solicitation # Owhi-Flats-RFB-2026.pdf
The Confederated Tribes of the Colville Reservation Environmental Trust Department is soliciting bids for the Owhi Flats 2026 watershed restoration project located within the Little Nespelem RMU. This firm-fixed-price construction contract involves decommissioning six road segments totaling 17,393 feet and installing two tank traps to improve water quality, enhance riparian habitat, and reduce road density impacts on wildlife. The scope of work includes decompacting road surfaces, applying straw mulch and woody debris, removing all non-natural materials such as culverts for approved disposal, and seeding surfaces back to natural vegetation. All work must adhere to Best Management Practices and specific Tribal Law and Order Codes regarding forest practices, water quality, hydraulic practices, fire management, and industrial safety. Selection will be awarded to the lowest responsive and responsible bidder who demonstrates specific experience in road decommissioning, stream crossings, and bank stabilization. Bidders must provide proof of at least 1,000,000 dollars in liability insurance and submit a complete bid packet including a work plan, equipment list, and Sams.gov registration. This solicitation is subject to Indian Preference and Tribal Employment Rights Ordinance (TERO) regulations, requiring a minimum of 51 percent of seasonal or temporary employees to be of Indian preference. Additionally, a 5 percent employment rights fee applies to contracts of 5,000 dollars or more. Sealed proposals must be received by 2 P.M. on October 29, 2026.
Confederated Tribes of the Colville Reservation

POSTED

about 11 hours ago

DEADLINE

in about 19 hours
NAICS: 237310
New
SLED
Silverbell Road Roadway Improvements - El Camino del Cerro to Goret Road
Solicitation # 270146
The Silverbell Road Roadway Improvements project, solicitation number 270146, is a major infrastructure initiative by the City of Tucson's Department of Transportation and Mobility. The project involves the reconstruction and widening of 3.27 miles of roadway, specifically 2.63 miles of Silverbell Road from 0.25 miles north of El Camino Del Cerro to 0.2 miles north of Goret Road, 0.50 mile of El Camino Del Cerro, and 0.14 mile of Sweetwater Drive. The scope of work includes the construction of four roadway lanes with medians, curbs, sidewalks, a multi-use path, traffic signals, street lighting, landscaping, irrigation, drainage facilities, and extensive utility work. The estimated price range for the project exceeds 10 million dollars. The contract is divided into two primary phases: a 730-calendar day construction phase and a subsequent 730-calendar day landscape establishment period. Bids are evaluated based on responsiveness and responsibility, with the award granted to the lowest responsive and responsible bidder. Key requirements include a bid security of 10 percent of the total offer and a 5 percent Small Business Enterprise participation goal. The project must adhere to various standards, including the 2015 Pima Association of Governments specifications and HUD guidelines for federally funded programs. Additionally, contractors must comply with stringent data protection and cybersecurity frameworks, ADA requirements, and environmental restrictions regarding herbicide use in protected washes.
Transportation & Mobility

POSTED

about 12 hours ago

DEADLINE

in 23 days
NAICS: 237310
New
SLED
Transit Area Asphalt Resurfacing
Solicitation # 26-044
The Transit Area Asphalt Resurfacing project, solicitation number 26-044, is a municipal construction contract for the City of Turlock, California, with an engineer's estimate of 233,000.00 dollars. The scope of work involves the cold milling and removal of a two-inch asphalt concrete layer, scarifying the native subgrade to 95 percent relative compaction, and applying a new asphalt concrete overlay across approximately 28,400 square feet of pavement at an active Transit Corporation Yard. The project concludes with the installation of permanent thermoplastic striping for bus parking stalls, which must be performed seven calendar days after paving to allow for proper curing. Due to the facility's role in daily CNG bus fueling, the project is subject to strict operational constraints, requiring work to be phased within tight weekend-only windows. The contract will be awarded to the lowest responsive and responsible bidder possessing either a Class A General Engineering or Class C-12 Earthwork and Paving contractor license. Required securities include bid and indemnity bonds of at least 10 percent of the bid amount, and performance and payment bonds equal to 100 percent of the contract price. All work must adhere to California prevailing wage rates for Stanislaus County and City of Turlock Standard Specifications. Performance is tightly scheduled, with substantial completion required within ten days of the Notice to Proceed.
Municipal Services-Engineering

POSTED

about 13 hours ago

DEADLINE

in 7 days
NAICS: 237310
New
SLED
Pedestrian Crossing Safety Improvements (FHWA)
Solicitation # 2025-041
The Pedestrian Crossing Safety Improvements project, solicitation number 2025-041, is a public works contract issued by the Seattle Department of Transportation with an estimated value between 3,250,000 and 3,350,000 dollars. The scope of work involves comprehensive infrastructure and safety enhancements across multiple locations in Washington, including 15th Ave S and Lander St, 33rd Ave S and Myrtle Pl, and several intersections along Rainier Ave S and Beacon Ave S. Key deliverables include the removal and restoration of sidewalks and pavement, installation of pedestrian islands, curbs, curb ramps, drainage structures, and the implementation of RRFB and traffic signals, signing, and channelization. The project also specifically includes electrical and rebar installation. The contract must be physically completed within 120 working days from the Notice to Proceed. Award will be granted to the lowest responsive bidder who meets mandatory and supplemental responsibility criteria, with a tie-breaker preference for the highest use of recycled materials. Compliance requirements are extensive, including a 13 percent Federal Small Business Enterprise goal, adherence to Buy America mandates, and compliance with Federal and State prevailing wage rates. Bidders must provide a bid guaranty of five percent of the total bid and are required to be registered with the federal System for Award Management. Submissions are primarily handled through the OpenGov portal, and the project adheres to the Americans with Disabilities Act and various City of Seattle and APWA general standard provisions.
Public Works

POSTED

about 14 hours ago

DEADLINE

in 7 days

AI Contract Overview

Show more

The CFD Sidewalk Replacement 2026 project, solicitation 26-027-ITB, is a construction effort by the City of West Sacramento to repair damaged public sidewalks within Community Facilities Districts. The primary objective is to eliminate trip hazards and accessibility barriers caused by street tree root displacement. The scope of work includes the removal and replacement of 4-inch PCC sidewalk panels, installation of root barriers, and driveway crossing reconstruction in accordance with City Standard Details 202, 205, and 701. Contractors are responsible for sawcutting, legal disposal, subgrade preparation, root pruning, concrete finishing, utility notifications via USA North 811, and comprehensive traffic and pedestrian control. The project is structured in phases by Community Facilities District, with work authorized only through separate written Notices to Proceed. The City does not guarantee minimum quantities or dollar values and reserves the right to reprioritize or defer locations based on funding and operational needs. This is a public works project subject to California Labor Code section 1720 prevailing wage requirements and federal-aid construction provisions, including the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Executive Order 11246. Compliance with 29 CFR Part 1926 safety standards and FHWA-1273 federal-aid provisions is mandatory. Bidders must provide certifications regarding debarment and lobbying for awards exceeding 100,000 dollars and maintain insurance from providers with an A.M. Best rating of at least A VII. Responses are due by September 4, 2026.

General Info

West Sacramento sidewalk replacement project 26-027-ITB, focusing on accessibility and root barriers.

Documents

12

26-027-ITB CFD Sidewalk Replacement 2026

PDF, High priority: read this firstitb
High

26-027-ITB CFD Sidewalk Replacement 2026 811 Tracking Log

XLSX, High priority: read this firstitb
High

CFD Sidewalk Replacement 2026 - Invitation to Bid

PDF, High priority: read this firstitb
High

CFD Sidewalk Replacement 2026 - Invitation to Bid

PDF, High priority: read this firstifb
High

CFD Sidewalk Scope - bid specifications

PDF, High priority: read this firstsow
High

City of West Sacramento Insurance Checklist

PDF, High priority: read this firstspecifications
High

Contract for Services - West Sacramento Federal Boilerplate RFP 5.1.24

DOCX, High priority: read this first23 pages · contract-document
High

FHWA-1273 Federal Aid Construction Contract Provisions Oct 2023

DOCX, High priority: read this first14 pages · contract-provisions
High

Section 11 – Concrete Curb, Gutter, Sidewalk and Driveways

PDF, High priority: read this firstsow
High

Standard Detail 205 - Driveway with Curb & Gutter Separate from Sidewalk

PDF, High priority: read this firstspecifications
High

Standard Detail 701 - Tree Planting Detail

PDF, High priority: read this firstsow
High

Standard Detail 202 - Southport Street Std. for Separated Curb Gutter & Sidewalk

PDF, Low priorityspecifications
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Capital Projects - Construction
Contacts2 people available
OfficeWest Sacramento, CA, 95691, USA
Office AddressWest Sacramento, CA, 95691, USA
Contacts
Damir ArushanovProject Manager
Nikki AllisonConstruction Administrative Specialist

Interested Companies (36)

Lords ElectricSACRAMENTO, CA
AP Traffic ServicesMather, CA
ConstructConnectCincinnati, OH

See All 36 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The CFD Sidewalk Replacement 2026 Project addresses damaged public sidewalks within the City's Community Facilities Districts, primarily where street tree roots have displaced or cracked adjacent PCC panels. The affected panels present trip hazards and accessibility barriers along pedestrian routes serving residential neighborhoods. Work consists of removal and replacement of 4-inch PCC sidewalk panels per Standard Detail 202, with root barrier installation per Standard Detail 701 and driveway crossing reconstruction per Standard Detail 205 where applicable. All locations and corresponding square footages are identified in the Cost Table. Dimensions and photographs are provided for bidding only; field verification is required prior to bid submittal. All work shall conform to the City of West Sacramento Standard Specifications and Standard Details, including Section 11 and Standard Details 202, 205, and 701. Contractors shall anticipate sawcutting and legal disposal of existing panels; subgrade preparation and Class II aggregate base; root pruning and root barrier installation where roots are encountered; concrete placement, finishing, and curing; utility notification and location (USA North 811 / Government Code §4216); traffic and pedestrian control; protection of adjacent private property and improvements; and site restoration and cleanup. The Work is divided into phases by Community Facilities District (CFD). Each CFD, or group of CFDs, is authorized only by separate written Notice to Proceed issued by the City. The City does not guarantee any minimum quantity, number of locations, or dollar value of Work beyond the CFD(s) authorized. Continuation to additional CFDs is contingent upon satisfactory performance and is not a matter of right. Most locations abut private residences and require coordination with residents and close field coordination with the City Project Manager. The City reserves the right to reprioritize, add, remove, or defer locations based on funding availability, inspection findings, or operational needs.

More opportunities from California → Capital Projects - Construction

Same awarding agency

New
SLED
Corpyard Phase II - Concrete Ramp Coating
Solicitation # 26-092-ITB
Solicitation 26-092-ITB, titled Corpyard Phase II - Concrete Ramp Coating, is an invitation for bids issued by the City of West Sacramento, California, through its Capital Projects - Construction agency. The project requires the installation of a commercial-grade, chemical-resistant, and anti-slip surface flooring system on a concrete ramp measuring approximately 50 feet by 78 feet. The specified system consists of a 1/4-inch urethane cement base coat, non-slip aggregate, and a polyaspartic topcoat designed to withstand heavy vehicular torque, continuous tire scrubbing, and organic acid exposure from green waste. All work must comply with the City of West Sacramento Standard Specifications 2002 and Caltrans Standard Specifications 2015. The contract will be awarded to the apparent low bidder, with the three lowest bidders allowed seven calendar days to provide data for any product or material substitutions. Bidders must submit their proposals via the City's e-Procurement Portal by November 10, 2026, at 2:00 PM. Required submission documents include a signed W-9, legal company identification, a comprehensive technical response in PDF format, and a cost proposal entered into the electronic pricing table. A bid security of at least 10 percent of the total bid price is required. Successful contractors must provide both payment and faithful performance bonds equal to 100 percent of the contract price and adhere to California Department of Industrial Relations prevailing wage rates. Registration with the California State Department of Industrial Relations per Labor Code section 1725.5 is mandatory. Project administration will be managed through the Virtual Project Manager (VPM) cloud-based system. Final acceptance of the work is determined by the Engineer, who also serves as the sole judge for any equivalency determinations regarding material substitutions.

POSTED

1 day ago

DEADLINE

in 13 days
View Details
New
SLED
Corpyard Phase II - Connex Structural Anchoring & Welding: (REBID)
Solicitation # 26-091-ITB
The City of West Sacramento is soliciting bids under solicitation 26-091-ITB for the Corpyard Phase II project, which involves the structural anchoring and welding of fourteen existing shipping containers to a cement-treated asphalt surface. The scope of work includes container pre-checks, anchor installation, drilling and cleaning of holes using Bolthold, welded angle connections, and rust protection, all performed according to PSE stamped drawings and structural calculations. The project requires a final inspection by the City's Building department and special inspections during installation. The anticipated project value is 35,000 dollars, and the contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals through the City's e-Procurement Portal by November 10, 2026, including a bid security of at least 10 percent of the total bid price. Requirements for the contractor include registration with the California State Department of Industrial Relations, compliance with prevailing wage rates, and adherence to various federal and state labor laws, including the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Executive Order 11246. Additionally, contractors must provide a Workers' Compensation certification and comply with ISO standards for shipping container certification. The project is managed by Project Manager II Mubusi Muhapi and overseen by the Director of Capital Projects, Jaipal Chahal.

POSTED

1 day ago

DEADLINE

in 13 days
View Details
NAICS: 541310
New
SLED
Architectural and Engineering Design Services — Rec Center Locker Room Renovation
Solicitation # 26-082-RFP
The City of West Sacramento is soliciting proposals for architectural and engineering design services to renovate approximately 3,378 square feet of locker room facilities at the West Sacramento Recreation Center. The project, identified as CIP-60022, aims to replace deteriorated flooring, grout, and ventilation with a modern, functional design across the women's, men's, and family locker suites. The work is structured into three fiscal year phases: Phase 1 focuses on plumbing and floor/wall finishes, Phase 2 addresses ventilation, and Phase 3 covers lockers and benches. A critical requirement is the development of a construction phasing plan that allows the facility to remain in continuous public operation. The selected consultant will serve as the design professional of record, responsible for producing coordinated construction documents and 3D renderings at 30, 65, and 95 percent milestones. Key regulatory requirements include compliance with the 2010 ADA Standards for Accessible Design and the 2022 California codes, with the Division of the State Architect serving as the authority having jurisdiction. Proposals are due by December 4, 2026, and will be evaluated based on proven ability, cost-effectiveness, qualifications, and acceptance of the City's standard contract. The contract incorporates federal award provisions, including certifications regarding debarment, suspension, and the Byrd Anti-Lobbying Amendment for awards exceeding 100,000 dollars.
Architectural Services

POSTED

2 days ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS