(CNIC) PROJECT NBSDDRY-3204A ,B,C REPLACE DOMESTIC HOT WATER BOILERS AND HHW BOILER
Active
FederalContract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Agency
Department Of The Navy → Navfac SouthwestView Agency
NAICS
N/A
Place of Performance
USASet-Aside
NONE
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Organization & Contact Information
Show more
AgencyDepartment Of The Navy → Navfac Southwest
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available
Full Description
Show more
WORK TYPE: CONTRACTS MAXIMO LOCATION: NBSDDRY-3204ABC Scope of work 1.1 Demolition & Removal (if applicable): DISCONECT (2) CAMUS DYNA FORCE 2.5MILLION BTU BOILERS FROM 3" COPPER PIPE 5 BOLT FLANGE, ELECTRICAL HARD WIRED FROM JBOX , 1" GAS LINE, CONDESATE LINE. REMOVE AND DEMO BOILERS. DISCONECT (1) CAMUS DYNA FORCE 1.8MILLION BTU BOILER FROM 3" HHW COPPER LINE 5 BOLT FLANGE, ELECTRICAL HARD WIRD FROM J BOX, 1" GAS LINE, CONDENSATE LINE. REMOVE AND DEMO BOILER 1.2 Site Preparation: PREP AREA AND SECURE WATER TO BOTH DOMESTIC HOT WATER AND HHW SUPPLY. (DOMESTIC HOT WATER NEEDS TO BE PHASED) BUILDING WILL NEED HOT WATER TO BUILDING AND PHASING WILL ELEIMINATE MISSION IMPACT FOR UH. 1.3 Construction/Repair: INSTALL AND PHASE DOMESTIC HOT WATER TO MINIMIZE IMPACT ON DAILY MISSION FUNCTIONS FOR UH BARRACKS. ONE BOILER WILL NEED TO BE FUNCTIONAL AT ALL TIMES. INSTALL NEW 2.5MILLION BTU BOILERS CONNECTING TO THE 5BOLT FLANGE. MAY NEED TO PIPE TO INLET OUTLE AS WELL AS GAS CONNECTIONS AND CONDENSATE CONNECTIONS. INSTALL NEW HHW 1.8MILLION BTU BOILER CONNECTING TO THE 5BOLT FLAGE CONNECTION POINTS. MAY NEED TO PIPE TO INLET OUTLET AS WELL AS CONNECTIONS TO GAS AND CONDENSATE LINE. 1.4 Impacts to the Base LAYDOWN AREA MAY IMPACT PARKING IN LOT 3J. BARRACKS WILL HAVE MINIMAL IMPACT WITH DOMESTIC HOT WATER ONLY SHORT TERM LOSS OF HOT WATER WHILE FIRST UNIT IS BEING CONNECTED AND PHASED IN. HEATING MAY BE IMPACTED UNABLE TO PHASE SINCE ITS A SINGLE UNIT. SAR: YES L/A test: YES Funding Type: CNIC
More opportunities from Department Of The Navy → Navfac Southwest
Same awarding agency
