Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Department Of Energy was posted on December 19, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Commercial Off-The-Shelf (COTS) IT Hardware Supply

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 423430
New
SLED
68-27-0007 MView Maintenance and Hardware Refresh
Solicitation # W00P7600986
Solicitation W00P7600986 is a Small Business Reserve Preferred procurement for the Maryland State Police Quartermaster Division, focusing on the hardware and maintenance refresh of Skyline SFS video streaming appliances. The scope of work includes the provision of new and unused hardware for an existing SFS 1000 streaming appliance, configuration services for three SKY-SFS1000 units, and both 4-year and 7-year software assurance and support packages featuring 24/7 phone support and security patches. Eligibility is strictly limited to certified small business vendors who are also Master Contractors under the Hardware and Associated Equipment and Services 2012 contract 060B2490022. Bids must be submitted via email to the Agency Point of Contact by November 23, 2026, and must be password protected, with the password sent in a separate email after the deadline. Required bid documentation includes a screenshot of the Manufacturer's Suggested Retail Price, estimated lead times for all items, and a Mercury Affidavit if applicable. The state reserves the right to request a Letter of Authorization to verify the contractor's status as an authorized reseller. Evaluation will prioritize the timeliness of delivery, and pricing must remain valid for 90 days following the due date. Invoices must be submitted to the designated Pikesville, MD address or via email, with billing for one-time items required within 30 days of acceptance.

POSTED

about 4 hours ago

DEADLINE

in 10 days
NAICS: 423430
New
SLED
Chromebook Non Touch Screen
Solicitation # PE-55476-NONST-2027-000000009
Jefferson City Schools is soliciting proposals for the procurement of 600 non-touch screen Chromebooks to support its one-to-one initiative for grades 3 through 12. The required hardware is the HP Fortis G1m or a comparable model featuring at least a MediaTek Kompanio 520 processor, 4 GB RAM, and 32 GB eMMC. All devices must meet MIL-STD 810 durability specifications and have an Auto Update Expiration date no earlier than June 2034. The project includes a comprehensive White Glove Service, which entails physical inspection, updating to the latest stable Chrome OS, domain enrollment, and the application of translucent rugged cases and vendor-supplied asset tags. All equipment installation must be completed by the last week of January 2027. The contract requires a minimum five-year warranty covering hardware failure, parts, and unlimited Accidental Damage Protection, including a three-year battery replacement. Vendors must provide a data file in CSV or XLS format capturing asset tags, serial numbers, and wireless MAC addresses. Proposals will be evaluated based on technical quality, project management, cost, and system features, with a requirement for the winning respondent to provide an HB 87 Immigration Affidavit. This project is funded via special purpose local option sales tax (SPLOST). Proposals must be emailed to Kris Plummer by 4:00 PM on November 30, 2026.
Jefferson City Schools

POSTED

about 4 hours ago

DEADLINE

in 17 days
NAICS: 423430
New
SLED
ATLASSIAN JSM SUBSCRIPTION (BRAND ONLY)
Solicitation # RFB-IS-27200321
The Internal Services Department for the County of Los Angeles has issued Request for Bid RFB-IS-27200321 for a brand-specific Atlassian JSM subscription to support the LACASSESSOR organization from January 1, 2027, to April 15, 2027. The procurement requires the electronic delivery of Atlassian Guard Annual Standard for up to 300 users, a Premium Service Collection Annual subscription for 100 agents, and Atlassian software support. To be considered for an award, the solution must intermember with existing computer systems to maintain overall effectiveness, and all professional services must be provided directly by the software developer rather than third-party providers. Bids must be submitted via the Vendor Self Service portal by December 2, 2026, and must include a complete set of required forms in Appendix A, including declarations, organization questionnaires, and certifications of compliance. Authorized resellers are required to provide a Letter of Certification from the manufacturer. The contract mandates strict adherence to cybersecurity standards, including the use of a segmented or hardened environment for SaaS backups and compliance with NIST SP 80088 for data destruction. Additionally, the selected vendor must maintain cyber liability insurance, comply with California Labor Code prevailing wages, and provide priority delivery to the County during disastrous events.
Internal Services Department

POSTED

about 13 hours ago

DEADLINE

in 19 days

AI Contract Overview

Show more

This subcontract opportunity, managed by Fermilab as a Department of Energy contractor, involves the procurement and delivery of genuine, non-counterfeit commercial off-the-shelf IT hardware. The scope of work includes the supply of servers, networking equipment, and workstations that must strictly adhere to Fermilab's established technical and cybersecurity standards. The procurement falls under NAICS code 423430, with the place of performance located in Batavia, Illinois. Interested parties must submit their responses by the deadline of January 9, 2026, following the posting date of December 19, 2025.

General Info

NAICS

423430 - Computer and Computer Peripheral Equipment and Software Merchant Wholesalers

Place of Performance

Batavia, IL, 60510, USA

Set-Aside

NONE

Documents

This scope was carved out of RFP-377125-CM.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Flange, sensor, and cable

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Fermilab - DOE Contractor
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Procurement and delivery of genuine, non-counterfeit commercial IT hardware such as servers, networking equipment, and workstations compliant with Fermilab's technical and cybersecurity standards.

More opportunities from Department Of Energy → Fermilab - DOE Contractor

Same awarding agency

NAICS: 23822
New
Federal
PIP-II F-37 BUILDING LWC PUMP ROOM PIPING SYSTEM INSTALLATION
Solicitation # 378854_MR
Fermi Forward Discovery Group, LLC (FFDG) is soliciting proposals for the fabrication and installation of a Low Conductivity Water (LCW) Piping System in the F-37 Building pump room at the Fermi National Accelerator Laboratory (Fermilab) in Batavia, Illinois. This firm-fixed-price project, part of the Proton Improvement Plan II (PIP-II), involves installing two 50 hp centrifugal pumps, a shell and tube heat exchanger, a 250-gallon expansion reservoir tank, and various process loop equipment including a deionization skid, particulate filter, and dissolved oxygen removal skid. The scope also encompasses the supply and installation of all piping hardware, process instrumentation, structural supports, foundation bases, and electrical components. The work must be completed within 180 calendar days from the Notice-to-Proceed and must adhere to ASME B31.3, B31.9, and FESHM standards. Proposals are due by December 3, 2026, at 2:00 p.m. CDT and must be submitted in two separate volumes: a technical proposal and a business/price proposal. Technical acceptability is based on a lowest price-technically acceptable selection method, requiring offerors to demonstrate at least ten years of business experience or have key personnel with ten years of experience in similar roles. Bidders must provide a bid guarantee of at least 20 percent of the bid price, capped at 3 million dollars, and will be required to furnish performance and payment bonds upon award. Due to the secured nature of the DOE site, all personnel must be U.S. citizens with a REAL ID and submit access requests at least seven days prior to site visits. Compliance with the Davis-Bacon Act, the Buy American Act, and strict Fermilab Environmental, Health, and Safety (FESHM) protocols is mandatory.

POSTED

1 day ago

DEADLINE

in 20 days
View Details
NAICS: 237130
Federal
KAUTZ ROAD SUBSTATION CONSTRUCION, UIP SUBPROJECT 2- KRS
Solicitation # RFP-383167-CD
Fermi Forward Discovery Group, LLC is soliciting proposals for the reconstruction and renovation of the Kautz Road Substation (KRS), designated as UIP subproject SP-2, at the Fermi National Accelerator Laboratory in Batavia, Illinois. This firm-fixed-price subcontract involves comprehensive demolition, building expansion, and the installation of low and medium voltage power systems, including 345kV substation yard equipment and a new prefabricated control house. The project is subject to a critical schedule constraint tied to the Fermilab accelerator shutdown, with on-site construction anticipated to occur between January 1, 2028, and January 1, 2030, with a final project completion deadline of September 30, 2029. The selection process utilizes a best-value tradeoff method where technical factors, including organizational structure, safety compliance, and past performance on high-voltage substation projects, are significantly more important than price. Offerors must meet strict pass/fail thresholds regarding financial capability, such as a current ratio of 1.10 or greater and an aggregate bonding capacity of at least 30 million dollars, as well as rigorous safety performance metrics. The contract mandates compliance with the Davis-Bacon Act for prevailing wages, various FAR and DEAR flow-down provisions, and specific federal anti-discrimination laws. Key milestones include the completion of submittals within 60 days of the Notice to Proceed and the formal issuance of the Authorization for Use and Possession by July 2, 2029.
Power and Communication Line and Related Structures Construction

POSTED

8 days ago

DEADLINE

in about 1 month
View Details
NAICS: 332999
Federal
WFE Solenoid/Corrector Magnet Spares
Solicitation # 389116swk
Fermilab, managed by the Fermi Forward Discovery Group, LLC for the U.S. Department of Energy, is soliciting proposals for the procurement of two solenoid magnets with integrated dipole correctors. This solicitation, number 389116swk, utilizes a best value trade-off source selection process where technical capabilities, infrastructure, and past experience are weighted as significantly more important than price. Proposals are due by 5pm Central on December 9, 2026, with a deadline for questions set for November 30, 2026. The selected subcontractor must provide a detailed Gantt chart, evidence of in-house manufacturing and magnetic testing capabilities, and a history of three similar contracts completed within the last five years. The scope of work requires strict adherence to ASME B31.3 welding and brazing standards and FNAL guidelines. Key deliverables include the hardware and associated material certifications for copper, epoxy, and steel. Acceptance is contingent upon Factory Acceptance Tests conducted at the subcontractor's facility, with specific requirements for field homogeneity and pressure testing. Shipping must be F.O.B. Fermilab in a single batch, utilizing crates equipped with irreversible shock indicators recording loads exceeding 10 G. All units must feature unique serial numbers and specific lead markings to ensure traceability and correct polarity.
All Other Miscellaneous Fabricated Metal Product Manufacturing

POSTED

8 days ago

DEADLINE

in 26 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS