Control Room HVAC System Replacement – Shasta Power Plant

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238220
New
SLED
ICE 8A - Ft Benning Improvements
Solicitation # 70CMSW25R00000011
Solicitation 70CMSW25R00000011 is a firm-fixed-price task order issued under an 8(a) Multiple Award Construction Contract (MACC) for design-build services to support the Immigration and Customs Enforcement (ICE) Office of Firearms and Tactical Programs at Fort Benning, Georgia. The project, valued between 4.0 million and 4.5 million dollars, focuses on life, safety, and operational improvements. The scope of work includes the installation of two aluminum awnings at the shipping and receiving dock and Fiske Range Lane 2, turf replacement at Fiske Range, the demolition of Building 2294, gutter and drainage improvements for Building 234, commercial HVAC services and replacements, and general facility improvements for Building 301 and the DAGr Team facility. The period of performance is 365 days from the date of award. Award will be based solely on the lowest total evaluated price, provided the offeror demonstrates a sound technical approach, appropriate design resources, and a comprehensive quality control and safety program. The contract is subject to the Davis-Bacon Act, requiring prevailing wage rates and specific paid sick leave for workers. Performance and payment bonds are required per FAR 52.228-15. Proposals must be submitted in two volumes: a technical and safety volume and a pricing volume using the provided template. All payment requests must be processed electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 5 hours ago

DEADLINE

in 6 days
NAICS: 238220
New
SLED
PIDC Project 3 - Dorm RTU Replacement and SCADA
Solicitation # 872287
This firm-fixed-price task order, issued under an 8(a) MACC IDIQ, involves the replacement and upgrade of Rooftop HVAC Units (RTUs) for the Alpha, Bravo, Charlie, and Delta dorms, as well as a SCADA system upgrade at the Port Isabel Detention Center in Los Fresnos, Texas. The project objective is to replace corroded and obsolete equipment with high-quality, coastal weather-resistant, and durable systems that exceed commercial standards. The scope includes removing existing RTUs, replacing necessary piping, electrical, and ducting, and installing new SCADA software and two chemical feed pumps in compliance with Texas Commission of Environmental Quality standards. The estimated magnitude of the project is between 1.2 million and 1.5 million dollars, with a period of performance of 365 days from the date of award. Award will be based solely on the lowest total evaluated price, provided the offeror demonstrates a sound technical approach, appropriate design resources, and a comprehensive quality control and safety program. Key requirements include the submission of a Quality Control Plan, a safety plan, and the designation of a Project Manager with at least five years of relevant federal contracting experience. The contractor must also provide a one-year warranty for installation and craftsmanship and ensure all personnel pass required background checks for site access. Compliance with the Davis-Bacon Act and associated executive orders regarding wages and sick leave is mandatory. All payment requests must be submitted electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 5 hours ago

DEADLINE

in 12 days
NAICS: 238220
New
RFQ7593 Smoke Detector Installation
Solicitation # RFQ7593
Management & Training Corporation (MTC) is soliciting bids for a fee-for-service subcontracting opportunity to provide smoke detector installation and fire system services at the Sierra Nevada Job Corps Center in Reno, Nevada. The scope of work requires the replacement of 43 smoke detectors across specific dormitory rooms, including 12 detectors in rooms 11, 15, and 18, 12 detectors in room 19, and 19 detectors in rooms 20 and 21. The contractor must ensure all installed detectors communicate with the fire panel and that all work adheres to NFPA standards and local Authority Having Jurisdiction requirements. Bids must be submitted via email to Tom Williams by 3:00 PM PST on September 18, 2026. To be considered, applicants must provide a completed bid sheet, proof of insurance, and a supplier packet containing a W-9, self-certification form, and acceptance of terms and conditions. This opportunity is open to various small business set-asides, including SDB, WOSB, HUBZone, and Veteran-Owned businesses, under NAICS code 238220. Award decisions will be based on the best value as determined by MTC. The contract mandates compliance with Service Contract Labor Standards and Wage Determination No. 2015-5595 Revision 28 for labor rates in Washoe and Storey counties. Additionally, subcontractors must provide a 12-digit Unique Entity ID and certify their debarment status under FAR 52.209-6 if the subcontract exceeds 30,000 dollars. Strict adherence to government and Department of Labor guidance regarding the protection of sensitive and proprietary information is required.
Sierra Nevada Job Corps Center

POSTED

about 5 hours ago

DEADLINE

in 7 days
NAICS: 238220
New
2026-Clearfield-Bldg E8 Welding HVAC
Solicitation # 2026- Clearfield- Welding Bldg. E8 HVAC Replacement
Management & Training Corporation is seeking fixed-price lump sum bids for a subcontracting opportunity to replace the HVAC system at Building E8 Welding within the Clearfield Job Corps Center in Clearfield, Utah. The scope of work includes the complete change-out of the existing motor, installation of wiring, conduit, disconnects, breakers, fuses, and starters, and the subsequent validation of voltage, phase, and grounding. Deliverables include startup and testing documentation, onsite training for maintenance personnel, and the provision of manufacturer O&M manuals. All work must adhere to OSHA requirements, federal, state, and local codes, and site safety procedures. Bids must be submitted via email to nelson.dar@jobcorps.org and patricia.willover@mtctrains.com by September 19, 2026, at 3:00 PM MST. To be considered for award based on overall best value, offerors must complete a physical site visit, provide a detailed bid breakout on company letterhead, and submit a bid bond guarantee. The project is a small business set-aside under NAICS 238220 and requires compliance with Davis-Bacon prevailing wage determinations for Davis County. Awardees must provide a UEI number, submit a Schedule of Values for invoicing via AIA G702/G703 forms, and provide original payment and performance bonds from a surety with at least an A- rating within five business days of an Intent to Award letter. Performance dates will be established upon the signing of a Notice to Proceed.
Management & Training Corporation

POSTED

about 5 hours ago

DEADLINE

in 8 days
NAICS: 238220
New
CBP7664 Wellness HVAC Compressor Replacement
Solicitation # CBP7664
Management & Training Corporation is seeking bids for a subcontracting opportunity to replace a failed HVAC/refrigeration compressor at the Wellness facility of the Sierra Nevada Job Corps Center in Reno, Nevada. This fixed-price, single lump sum contract requires the contractor to provide all labor, materials, and equipment to execute a five-phase process including preparation, demolition, installation of an OEM-specified compressor, system testing and commissioning, and final closeout. The project must restore full cooling capacity and operational efficiency while adhering to EPA Section 608 regulations for refrigerant recovery. The work must be completed within thirty consecutive business days following the receipt of a written Notice to Proceed. Bids will be evaluated based on overall best value, considering price, quality, and delivery schedule. The estimated price range is between 0 and 25,000 dollars, though bids equal to or greater than 25,000 dollars require a 20 percent bid bond guarantee and subsequent performance and payment bonds from an A-rated surety company. Submission requirements include a bid sheet, proof of insurance, three comparable project references, and a completed supplier packet containing a W-9 and self-certification of business size under FAR 52.219-8. Contractors must comply with Davis-Bacon Act prevailing wage rates for Washoe County and adhere to FAR 52.204-10 reporting if the award reaches 40,000 dollars. Final payment is contingent upon a successful final inspection and the submission of a notice of final completion, certified payroll reports, and operation and maintenance manuals.
Sierra Nevada Job Corps Center

POSTED

about 5 hours ago

DEADLINE

in 12 days
NAICS: 238220
New
This is a subcontracting opportunity to replace a chiller in McKinney, TX.
Solicitation # subcontracting-opportunity-replace-chiller-mckinney-tx
Serrato Corporation is seeking bids for a subcontracting opportunity to replace a failing air-cooled chiller at the North Texas Job Corps Center, specifically within Building 214/215 in McKinney, Texas. The scope of work includes the demolition and disposal of the existing chiller, the installation and startup of a new air-cooled chiller, and the integration of building automation controls using a JACE 9000 central integration point. Additionally, the contractor is responsible for installing three-way control valves at four air handling units, replacing VFDs, performing AHU cleaning and inspection, and ensuring all wiring is plenum-rated. Bids must be submitted by September 18, 2026, and quotes must remain valid for 90 days. Required submission documentation includes manufacturer equipment specifications, a Certificate of Liability Insurance naming Serrato Corporation as the holder, and Form 1413 for Davis-Bacon Act certified payroll compliance for work exceeding 2,000 dollars. Insurance requirements include a minimum of 500,000 dollars for Employers Liability and 1,000,000 dollars per occurrence for Commercial General Liability. The project is set aside for various small business categories, including SDB, WOSB, HUBZone, VOSB, and SDVOSB. Primary points of contact for this solicitation are Stacy Smith and Roy Henderson.
Serrato Corporation DBA North Texas Job Corps

POSTED

about 5 hours ago

DEADLINE

in 7 days
NAICS: 238220
New
Main Building 1 Wing 5 – Six Rooftop HVAC Unit Replacement – Glenmont Job Corps Center
Solicitation # S26-010
The Glenmont Job Corps Center is soliciting proposals from qualified, New York State licensed contractors for the replacement and installation of HVAC equipment within Main Building No. 1, Wing 5 (Education Building) in Glenmont, New York. The project involves replacing two 7.5-ton split-system units for the auditorium, one 6-ton rooftop unit for the library and computer lab, and one 12.5-ton rooftop unit for the north and east wing classrooms. Additionally, the scope includes installing four 2-ton ductless mini-split heat pump systems, removing a window air-conditioning unit, and abandoning two 5-ton rooftop units in place. Comprehensive associated work encompasses demolition, roof curbs and penetrations, ductwork, refrigerant and condensate piping, electrical work, controls, structural roof evaluations, and fire alarm and duct smoke detector installations, concluding with testing, balancing, and commissioning. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and Veteran-Owned Small Businesses. The project must be completed within 210 calendar days following the written Notice to Proceed, and the facility will remain operational throughout the construction period. Key deadlines include a pre-proposal site walkthrough on September 10, 2026, with vendor questions due by September 14, 2026. Final proposals must be submitted by September 21, 2026, at 4:00 PM ET. All work must comply with applicable New York State codes, safety regulations, and environmental requirements.
Adams and Associates, Inc.

POSTED

about 5 hours ago

DEADLINE

in 9 days
NAICS: 238220
New
Replace HVAC Systems in the following buildings on our campus –1.) ABL Dormitory
Solicitation # 26-141
This subcontracting opportunity, managed by Adams & Associates, Inc. for the U.S. Department of Labor, involves the replacement of HVAC systems at the Atterbury Job Corps Center ABL Dormitory in Indiana. The project requires replacing existing R-22 Bryant condensing units and coils serving common areas and dormitory wings A, B, C, and D with new 12.5 SEER packaged units utilizing non-R22 refrigerants such as R-410A or R-454B. The contractor is expected to reuse existing electrical disconnects, ductwork, and thermostat wiring, and must label and leave all recovered refrigerant on-site. Bidders must attend a mandatory site visit on September 23, 2026, and submit a single lump sum proposal by October 5, 2026. Award will be based on best value, evaluating price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Eligible vendors must maintain an active SAM.gov registration and a Unique Entity ID, hold a valid Indiana Contractor's License, and provide proof of specific automobile and workers' compensation insurance. Compliance with EPA, OSHA, and Davis-Bacon Act wage determinations is mandatory. Final payment is subject to Net 30 terms and is contingent upon the submission of a completed SF 1413, certified payroll records, and the release of liens from all subcontractors and material suppliers.
Adams & Associates, Inc.

POSTED

about 5 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The contract entails the complete removal and replacement of all existing HVAC units in the control room at the Shasta Power Plant, with installation of three new units, new ductwork, integration of advanced control systems, and full commissioning to ensure optimal performance and compliance with operational standards. The scope is comprehensive, covering every aspect of the system upgrade from demolition to final testing and sign-off, ensuring seamless integration with the facility’s existing infrastructure and maintaining critical environmental controls necessary for the control room’s sensitive equipment. This is a Service-Disabled Veteran-Owned Small Business Set Aside subcontract under NAICS code 238220, issued by the Department of the Interior’s Mp-regional Office, with a response deadline of May 27, 2026, and posted on May 5, 2026. The work must be performed at the Shasta Power Plant site, though specific location details are not provided, and bidders are expected to align with all relevant federal contracting requirements for SDVOSB participation. The project demands precision, adherence to safety protocols, and coordination with plant operations to minimize disruption during the transition period.

General Info

HVAC replacement and upgrade at Shasta Power Plant control room; SDVOSBC subcontract set aside.

Agency

Department Of The Interior → Mp-regional OfficeView Agency

NAICS

238220 - Plumbing, Heating, and Air-Conditioning ContractorsView NAICS

Place of Performance

CA

Set-Aside

SDVOSBC

Documents

This scope was carved out of 140R2026R0011.

The full solicitation package (14 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

41--HVAC Replacement for SH PP and SC PP

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Mp-regional Office
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Interior → Mp-regional Office
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Full removal and replacement of existing HVAC units in the control room at Shasta Power Plant, including installation of three new units, ductwork, controls integration, and commissioning.

More opportunities from Department Of The Interior → Mp-regional Office

Same awarding agency

NAICS: 237990
New
Federal
Z--Mendota Pool Bypass and Reach 2B Improvements
Solicitation # 140R2026R0020
The Bureau of Reclamation, under the San Joaquin River Restoration Program and the San Joaquin River Restoration Settlement Act, is seeking industry input via Request for Information 140R2026R0020 for the Mendota Pool Bypass and Reach 2B Improvements. This large-scale civil works project in California is estimated to have a magnitude between 225 million and 300 million dollars. The primary objective is to construct channel and structural improvements to ensure a conveyance of at least 4,500 cfs from Reach 2B downstream to Reach 3. The project is divided into two phases: Phase 1 focuses on the Mendota Pool Bypass Channel to provide passage for Chinook salmon, including the construction of a control structure, fish ladder, and auxiliary water supply, with a goal of being operational by spring 2030. Phase 2 involves replacing intake locations in Reach 2B with a headworks structure, canal, and siphon or pipeline to maintain water delivery to the Columbia Mowry Delivery System. The government aims to begin construction on the channel and levee in 2027 and is currently evaluating the most effective delivery method, considering design-bid-build, design-build, or a hybrid approach. The project must comply with several environmental mandates, including the National Environmental Policy Act, the Clean Water Act, the Endangered Species Act, and the National Historic Preservation Act, and will require a Project Labor Agreement. As this is currently an RFI for market research and planning, the agency is soliciting feedback on risk allocation, constructability, and schedule estimates. Interested parties must execute a Federal Non-Disclosure Agreement to access detailed geotechnical reports, design drawings, and specifications. The primary point of contact for this effort is Stephanie Lindner.
Other Heavy and Civil Engineering Construction

POSTED

4 days ago

DEADLINE

in 5 days
View Details
NAICS: 237990
Federal
Z--Folsom Warehouse Bridge Crane Replacement
Solicitation # 140R2026R0017
Solicitation 140R2026R0017 is a firm-fixed-price, one-phase design-build construction contract issued by the U.S. Department of the Interior, Bureau of Reclamation, for the replacement of a 30-ton bridge crane at the Folsom Dam Warehouse in Sacramento County, California. The project is exclusively set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under FAR 19.14, with an estimated value between 1 million and 5 million dollars. The scope of work encompasses the removal and disposal of the existing crane, including the handling of asbestos and other hazardous materials, the design and installation of a new 30-ton bridge crane, power supply installation, rail system survey and optional repairs, and final commissioning, load testing, and operator training. The contractor must begin performance within 7 calendar days of the notice to proceed and complete all work, including final cleanup, within 600 calendar days. The procurement process utilizes FAR Part 15 negotiation procedures, with award based on the most advantageous proposal to the government. Evaluation is weighted heavily toward non-price factors, specifically the technical approach, past performance within the last six years, and the qualifications of key personnel, including a qualified crane inspector. Proposals must be submitted in three distinct volumes: Business, Technical, and Pricing. The contract includes strict quality assurance requirements, including Factory Acceptance Testing (FAT) for PLCs and VFDs and adherence to various NEMA, IEEE, and UL standards. Performance is subject to liquidated damages of 2,900 dollars per calendar day of delay, and the contractor is required to provide performance and payment bonds.
Other Heavy and Civil Engineering Construction

POSTED

9 days ago

DEADLINE

in 27 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS