This Government Contract opportunity from Department Of The Interior was posted on May 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Control Room HVAC System Replacement – Spring Creek Power Plant

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238220
New
Federal
Galley Renovation at USCG Station Lake Tahoe
Solicitation # 30670PR260000032
Solicitation 30670PR260000032 is a firm-fixed-price request for proposal issued by the US Coast Guard Regional Support Team – Southwest for the renovation of a 210 square foot galley at Station Lake Tahoe in California. This project is a total set-aside for small businesses with an estimated magnitude between 25,000 and 100,000 dollars. The scope of work includes the demolition and removal of existing cabinetry, countertops, sinks, griddles, and freezer units, followed by the installation of new commercial-grade cabinetry, stainless-steel countertops, a sink and faucet assembly, a combination griddle/burner unit, and a commercial-grade freezer. The existing refrigerator must be preserved and integrated into the new layout. All plumbing, electrical, and gas work must be performed by licensed professionals in accordance with state and local codes. The contract requires performance to commence within 15 calendar days of award, with a mandatory completion period of 60 calendar days. Award will be based on the lowest priced technically acceptable offer, requiring a reasonable technical approach and complete pricing. Key safety and environmental requirements include compliance with OSHA Lead in Construction Standards due to lead-based paint in the southeast corner and adherence to EPA Section 608 regulations for refrigerant reclamation from the old freezer. Offerors must be registered in SAM.gov and provide a detailed pricing breakdown of materials, personnel, and equipment. Proposals must be submitted via email by September 18, 2026, and include a technical approach addressing all statement of work tasks.
Base ALAMEDA(00031)

POSTED

about 6 hours ago

DEADLINE

in 6 days
NAICS: 238220
New
SLED
ICE 8A - Ft Benning Improvements
Solicitation # 70CMSW25R00000011
This firm-fixed-price task order, issued under an 8(a) Multiple Award Construction Contract (MACC) for the DHS Office of Firearms and Tactical Programs, provides design-build services for life, safety, and operational improvements at Fort Benning, Georgia. The project scope includes a variety of facility enhancements such as installing aluminum awnings, replacing turf at Fiske Range, demolishing and restoring Building 2294, improving gutters and drainage at Building 234, and performing commercial HVAC replacements. Additional work involves general improvements to Building 301 and the DAGr Team facility, including office refreshes, the installation of AV equipment and gear storage lockers, and the reconfiguration of restrooms to include walk-in showers. The estimated magnitude of the project is between 4.0 million and 4.5 million dollars, with a period of performance not to exceed 365 days from the date of award. Award will be based on the lowest total evaluated price, provided the offeror demonstrates a technical understanding of the requirements and possesses the necessary licensed professional resources. The contract is subject to the Davis-Bacon Act, requiring adherence to wage determination GA20260320, including specific federal paid sick leave and minimum wage mandates. Performance and payment bonds are required per FAR 52.228-15. Administrative oversight is managed by the Contracting Officer's Representative, Mr. Joseph Addison, and all payment requests must be submitted electronically via the Invoice Processing Platform with accompanying certified payroll.
Bristol Alliance of Companies

POSTED

about 14 hours ago

DEADLINE

in 5 days
NAICS: 238220
New
SLED
PIDC Project 3 - Dorm RTU Replacement and SCADA
Solicitation # 872287
This firm-fixed-price task order, issued under an 8(a) MACC IDIQ, involves the replacement and upgrade of Rooftop HVAC Units (RTUs) for the Alpha, Bravo, Charlie, and Delta dorms, as well as a SCADA system upgrade at the Port Isabel Detention Center in Los Fresnos, Texas. The project objective is to replace corroded and obsolete equipment with high-quality, coastal weather-resistant, and durable systems that exceed commercial standards. The scope includes removing existing RTUs, replacing necessary piping, electrical, and ducting, and installing new SCADA software and two chemical feed pumps in compliance with Texas Commission of Environmental Quality standards. The estimated magnitude of the project is between 1.2 million and 1.5 million dollars, with a period of performance of 365 days from the date of award. Award will be based solely on the lowest total evaluated price, provided the offeror demonstrates a sound technical approach, appropriate design resources, and a comprehensive quality control and safety program. Key requirements include the submission of a Quality Control Plan, a safety plan, and the designation of a Project Manager with at least five years of relevant federal contracting experience. The contractor must also provide a one-year warranty for installation and craftsmanship and ensure all personnel pass required background checks for site access. Compliance with the Davis-Bacon Act and associated executive orders regarding wages and sick leave is mandatory. All payment requests must be submitted electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 14 hours ago

DEADLINE

in 12 days
NAICS: 238220
New
RFQ7593 Smoke Detector Installation
Solicitation # RFQ7593
Management & Training Corporation (MTC) is soliciting bids for a fee-for-service subcontracting opportunity to provide smoke detector installation and fire system services at the Sierra Nevada Job Corps Center in Reno, Nevada. The scope of work requires the replacement of 43 smoke detectors across specific dormitory rooms, including 12 detectors in rooms 11, 15, and 18, 12 detectors in room 19, and 19 detectors in rooms 20 and 21. The contractor must ensure all installed detectors communicate with the fire panel and that all work adheres to NFPA standards and local Authority Having Jurisdiction requirements. Bids must be submitted via email to Tom Williams by 3:00 PM PST on September 18, 2026. To be considered, applicants must provide a completed bid sheet, proof of insurance, and a supplier packet containing a W-9, self-certification form, and acceptance of terms and conditions. This opportunity is open to various small business set-asides, including SDB, WOSB, HUBZone, and Veteran-Owned businesses, under NAICS code 238220. Award decisions will be based on the best value as determined by MTC. The contract mandates compliance with Service Contract Labor Standards and Wage Determination No. 2015-5595 Revision 28 for labor rates in Washoe and Storey counties. Additionally, subcontractors must provide a 12-digit Unique Entity ID and certify their debarment status under FAR 52.209-6 if the subcontract exceeds 30,000 dollars. Strict adherence to government and Department of Labor guidance regarding the protection of sensitive and proprietary information is required.
Sierra Nevada Job Corps Center

POSTED

about 14 hours ago

DEADLINE

in 6 days
NAICS: 238220
New
2026-Clearfield-Bldg E8 Welding HVAC
Solicitation # 2026- Clearfield- Welding Bldg. E8 HVAC Replacement
Management & Training Corporation (MTC) is seeking fixed-price lump sum bids for a subcontracting opportunity to replace a 20hp motor connected to the rooftop HVAC system at the Clearfield Job Corps Center in Clearfield, Utah. The scope of work includes providing all labor, supervision, materials, equipment, and permits necessary for the removal and replacement of the motor, ensuring the system is fully operational upon completion. Deliverables include the successful installation and the provision of startup, testing, and commissioning documentation. All work must comply with federal, state, and local codes, OSHA requirements, and site safety procedures. Bids are due by September 19, 2026, at 3:00 PM MST and must be submitted via email to Patricia Willover and Nelson Dar. To be considered, bidders must conduct a physical site visit, sign the attendance roster, and submit a bid bond guarantee. The submission package must include a signed MTC Bid for Lump Sum Contract form and a detailed cost breakout on company letterhead. Award will be based on overall best value. The project is a small business set-aside and requires contractors to provide a 12-digit Unique Entity ID and a 9-digit Tax ID. Compliance with Davis-Bacon prevailing wage rates for Davis County, Utah, is mandatory. Additionally, the successful contractor must provide performance and payment bonds from a surety company with at least an A- rating within five business days of an Intent to Award letter. Payment will be processed via pay applications using AIA G702 and G703 forms based on a previously submitted Schedule of Values.
Management & Training Corporation

POSTED

about 14 hours ago

DEADLINE

in 7 days
NAICS: 238220
New
CBP7664 Wellness HVAC Compressor Replacement
Solicitation # CBP7664
Management & Training Corporation is seeking bids for a subcontracting opportunity to replace a failed HVAC/refrigeration compressor at the Wellness facility of the Sierra Nevada Job Corps Center in Reno, Nevada. This fixed-price, single lump sum contract requires the contractor to provide all labor, materials, and equipment to execute a five-phase process including preparation, demolition, installation of an OEM-specified compressor, system testing and commissioning, and final closeout. The project must restore full cooling capacity and operational efficiency while adhering to EPA Section 608 regulations for refrigerant recovery. The work must be completed within thirty consecutive business days following the receipt of a written Notice to Proceed. Bids will be evaluated based on overall best value, considering price, quality, and delivery schedule. The estimated price range is between 0 and 25,000 dollars, though bids equal to or greater than 25,000 dollars require a 20 percent bid bond guarantee and subsequent performance and payment bonds from an A-rated surety company. Submission requirements include a bid sheet, proof of insurance, three comparable project references, and a completed supplier packet containing a W-9 and self-certification of business size under FAR 52.219-8. Contractors must comply with Davis-Bacon Act prevailing wage rates for Washoe County and adhere to FAR 52.204-10 reporting if the award reaches 40,000 dollars. Final payment is contingent upon a successful final inspection and the submission of a notice of final completion, certified payroll reports, and operation and maintenance manuals.
Sierra Nevada Job Corps Center

POSTED

about 14 hours ago

DEADLINE

in 11 days
NAICS: 238220
New
This is a subcontracting opportunity to replace a chiller in McKinney, TX.
Solicitation # subcontracting-opportunity-replace-chiller-mckinney-tx
Serrato Corporation is seeking subcontractors to replace a failing air-cooled chiller in Building 214/215 at the North Texas Job Corps Center in McKinney, Texas. The project requires the installation of a like-kind, similar model to the existing 246-ton Carrier unit, including demolition and disposal of the old equipment. The scope of work extends to building automation controls via the installation of a JACE 9000 central integration point with a graphical user interface, the installation of four 3-way control valves, and the replacement of three out of four air handler VFDs. Additionally, the contractor must clean and inspect four air handling units, including blower motors, wheels, coils, and screens. Bids must be submitted by September 18, 2026, and must remain valid for 90 days. Required submission documentation includes manufacturer equipment specifications, Form 1413 for Davis-Bacon Act certified payroll for work exceeding 2,000 dollars, and a Certificate of Liability Insurance naming Serrato Corporation as the holder. Insurance minimums include 1 million dollars for Commercial General Liability and Comprehensive Automobile Liability, and 500,000 dollars for Employers Liability. The contractor is responsible for performing startup and operational tests and providing all warranty information and final job documentation. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB.
Serrato Corporation DBA North Texas Job Corps

POSTED

about 14 hours ago

DEADLINE

in 6 days
NAICS: 238220
New
Main Building 1 Wing 5 – Six Rooftop HVAC Unit Replacement – Glenmont Job Corps Center
Solicitation # S26-010
The Glenmont Job Corps Center is soliciting proposals from qualified, New York State licensed contractors for the replacement and installation of HVAC equipment within Main Building No. 1, Wing 5 (Education Building) in Glenmont, New York. The project involves replacing two 7.5-ton split-system units for the auditorium, one 6-ton rooftop unit for the library and computer lab, and one 12.5-ton rooftop unit for the north and east wing classrooms. Additionally, the scope includes installing four 2-ton ductless mini-split heat pump systems, removing a window air-conditioning unit, and abandoning two 5-ton rooftop units in place. Comprehensive associated work encompasses demolition, roof curbs and penetrations, ductwork, refrigerant and condensate piping, electrical work, controls, structural roof evaluations, and fire alarm and duct smoke detector installations, concluding with testing, balancing, and commissioning. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and Veteran-Owned Small Businesses. The project must be completed within 210 calendar days following the written Notice to Proceed, and the facility will remain operational throughout the construction period. Key deadlines include a pre-proposal site walkthrough on September 10, 2026, with vendor questions due by September 14, 2026. Final proposals must be submitted by September 21, 2026, at 4:00 PM ET. All work must comply with applicable New York State codes, safety regulations, and environmental requirements.
Adams and Associates, Inc.

POSTED

about 14 hours ago

DEADLINE

in 9 days

AI Contract Overview

Show more

The contract entails the complete removal and replacement of HVAC units in the control room at the Spring Creek Power Plant, requiring the installation of three new units along with associated ductwork, electrical connections, and comprehensive system testing to ensure full operational compliance. The work is critical to maintaining environmental controls and operational safety within the facility’s control room, and all components must be integrated seamlessly with existing infrastructure. The scope includes not only physical installation but also rigorous performance validation to guarantee reliability under demanding conditions. This is a subcontract set aside exclusively for Service-Disabled Veteran-Owned Small Businesses, with the North American Industry Classification System code 238220 indicating specialized building equipment contractors. The solicitation was posted on May 5, 2026, and responses are due by May 27, 2026, under the Department of the Interior’s MP-Regional Office. The performance location is tied to the Spring Creek Power Plant, though specific geographic details are not provided in the data. All work must adhere to federal procurement standards and meet the technical and compliance requirements of a mission-critical energy infrastructure site.

General Info

Removal and replacement of three HVAC units in Spring Creek control room, SDVOSB set aside contract.

Agency

Department Of The Interior → Mp-regional OfficeView Agency

NAICS

238220 - Plumbing, Heating, and Air-Conditioning ContractorsView NAICS

Place of Performance

CA

Set-Aside

SDVOSBC

Documents

This scope was carved out of 140R2026R0011.

The full solicitation package (14 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

41--HVAC Replacement for SH PP and SC PP

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Mp-regional Office
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Interior → Mp-regional Office
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Removal and replacement of HVAC units in the control room at Spring Creek Power Plant, including three new units, ducting, electrical tie-ins, and system testing.

More opportunities from Department Of The Interior → Mp-regional Office

Same awarding agency

NAICS: 237990
New
Federal
Z--Mendota Pool Bypass and Reach 2B Improvements
Solicitation # 140R2026R0020
The Bureau of Reclamation, under the San Joaquin River Restoration Program and the San Joaquin River Restoration Settlement Act, is seeking industry input via Request for Information 140R2026R0020 for the Mendota Pool Bypass and Reach 2B Improvements. This large-scale civil works project in California is estimated to have a magnitude between 225 million and 300 million dollars. The primary objective is to construct channel and structural improvements to ensure a conveyance of at least 4,500 cfs from Reach 2B downstream to Reach 3. The project is divided into two phases: Phase 1 focuses on the Mendota Pool Bypass Channel to provide passage for Chinook salmon, including the construction of a control structure, fish ladder, and auxiliary water supply, with a goal of being operational by spring 2030. Phase 2 involves replacing intake locations in Reach 2B with a headworks structure, canal, and siphon or pipeline to maintain water delivery to the Columbia Mowry Delivery System. The government aims to begin construction on the channel and levee in 2027 and is currently evaluating the most effective delivery method, considering design-bid-build, design-build, or a hybrid approach. The project must comply with several environmental mandates, including the National Environmental Policy Act, the Clean Water Act, the Endangered Species Act, and the National Historic Preservation Act, and will require a Project Labor Agreement. As this is currently an RFI for market research and planning, the agency is soliciting feedback on risk allocation, constructability, and schedule estimates. Interested parties must execute a Federal Non-Disclosure Agreement to access detailed geotechnical reports, design drawings, and specifications. The primary point of contact for this effort is Stephanie Lindner.
Other Heavy and Civil Engineering Construction

POSTED

4 days ago

DEADLINE

in 4 days
View Details
NAICS: 237990
Federal
Z--Folsom Warehouse Bridge Crane Replacement
Solicitation # 140R2026R0017
Solicitation 140R2026R0017 is a firm-fixed-price, one-phase design-build construction contract issued by the U.S. Department of the Interior, Bureau of Reclamation, for the replacement of a 30-ton bridge crane at the Folsom Dam Warehouse in Sacramento County, California. The project is exclusively set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under FAR 19.14, with an estimated value between 1 million and 5 million dollars. The scope of work encompasses the removal and disposal of the existing crane, including the handling of asbestos and other hazardous materials, the design and installation of a new 30-ton bridge crane, power supply installation, rail system survey and optional repairs, and final commissioning, load testing, and operator training. The contractor must begin performance within 7 calendar days of the notice to proceed and complete all work, including final cleanup, within 600 calendar days. The procurement process utilizes FAR Part 15 negotiation procedures, with award based on the most advantageous proposal to the government. Evaluation is weighted heavily toward non-price factors, specifically the technical approach, past performance within the last six years, and the qualifications of key personnel, including a qualified crane inspector. Proposals must be submitted in three distinct volumes: Business, Technical, and Pricing. The contract includes strict quality assurance requirements, including Factory Acceptance Testing (FAT) for PLCs and VFDs and adherence to various NEMA, IEEE, and UL standards. Performance is subject to liquidated damages of 2,900 dollars per calendar day of delay, and the contractor is required to provide performance and payment bonds.
Other Heavy and Civil Engineering Construction

POSTED

9 days ago

DEADLINE

in 26 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS