CUP23-0029/MERG00157/IS24-0022 Ocotillo Rv Storage

Forecast
CUP23-0029/MERG00157/IS24-0022State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Martin A. Tripes is developing the Ocotillo RV Storage Facility located at 14 West Highway 80, Ocotillo, California. This project, identified by solicitation number CUP23-0029/MERG00157/IS24-0022, involves the merger of two industrially zoned parcels, APNs 033-562-010 and 033-562-011, to create a single lot. The facility will provide up to 100 RV storage spaces along with on-site sales and repair services. The development is planned to occur in three phases and will operate 24 hours a day, seven days a week, with access provided via Interstate 8 and Highway 80. Notably, the facility will not include an RV dump station. The project has been approved by the Imperial County Planning Commission through Conditional Use Permit 23-0029 and Lot Merger 00157. Environmental review conducted under the California Environmental Quality Act resulted in a Negative Declaration, concluding that the project would have no significant environmental effects and requiring no mitigation measures. Administrative oversight is managed by Imperial County Planning and Development Services, with Jim Minnick serving as Director. While the project is listed as a forecast with a posted date of November 25, 2025, it is governed by local land-use and environmental permitting processes rather than federal acquisition regulations.

General Info

Martin A. Tripes will develop a 100-space RV storage facility in Ocotillo, California.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more

Full Description

Show more
The applicant, Martin A Tripes, Is proposing the development of a Recreational Vehicle (RV) Storage Facility that will also include on-site sales and repair services The proposal includes a Conditional Use Permit (CUP) #23-0029 and a Lot Merger (MERG) #00157 to combine two contiguous industrially zoned parcels, identified as Assessor's Parcel Numbers (APNs) 033-562-010 and 033-562-011, into a single, larger lot to accommodate up to 100 spaces RV storage facility, The project will be developed in three (3) phases and will not include an RV dump station. The facility is proposed to operate 24 hours a day, seven days a week, Access to the proposed Ocotillo RV Storage Facility will contrnue to be provided via Interstate 8, exiting to the west on Highway 80 (West Evan Hewes Highway).

Similar Contracts

Same NAICS industry code

NAICS: 721211
SLED
Glamping Operations at CB Smith Park
Solicitation # PNC2133110F1
The Broward County Parks and Recreation Division has issued a Request for Information (RFI), solicitation number PNC2133110F1, to gather data for the potential development of glamping operations at C.B. Smith Park. The project is intended to be located on the Concert Green, a 5.3-acre island in Pembroke Pines, Florida. This RFI is for informational and planning purposes only and does not constitute a request for pricing or a purchase commitment, nor will it result in a direct contract award. Instead, the information collected will assist the County in developing a scope of services and identifying interested firms for a future Request for Proposal (RFP) to establish a public-private partnership. The proposed scope of work requires the operator to provide and manage glamping accommodations, handle payment processing via cash and electronic systems, and potentially offer amenities such as kayaks, canoes, bikes, and hammocks. This venture is designed to be entirely funded by the firm and revenue-generating for the operator, with no fees paid by the County. Interested vendors must submit responses electronically by November 23, 2026, using company letterhead and the provided Vendor Response Template. Submissions should include technical specifications, conceptual designs, and details regarding the firm's ability to operate in South Florida, as well as estimated charges per glamping site.
Broward County

POSTED

22 days ago

DEADLINE

in 5 days
View Details
NAICS: 721211
SLED
Dahan Use Permit for Recreational Vehicle Park UP2601C
Solicitation # UP2601C
Lee Tromble, acting for property owner Daniel Dahan, has applied for a conditional use permit from Del Norte County to develop a small recreational vehicle park featuring four park model guest lodging units. Located in the Smith River area of California near the Oregon border, the project site consists of approximately 0.7 acres of bluff-top land, coastal bluff face, and sandy beach. Each unit will include a deck and a detached stick-built structure for a bedroom and bathroom, all positioned at least 16 feet from the bluff edge. The project is situated within the California Coastal Zone and adheres to the Del Norte County Local Coastal Program, carrying a Visitor-Serving Commercial land use designation and Commercial Recreation zoning. The development plan involves the demolition of the vacant and dilapidated former Nautical Inn restaurant and its associated hardscape, with specific measures in place to protect the coastal bluff. Infrastructure improvements include a counterclockwise loop road for internal circulation and a Wisconsin mound on-site sewage disposal system designed for 800 gallons per day. Water service will be provided by the Smith River Community Services District, and the site will offer four parking spaces. The project is bordered by Pelican State Beach to the north and the applicant-owned White Rock Resort to the south. A Notice of Determination issued on May 6, 2026, certifies that the project will not have a significant effect on the environment.
Del Norte County

POSTED

2 months ago

DEADLINE

N/A
View Details

More opportunities from California → Imperial County

Same awarding agency

NAICS: 541620
New
SLED
Imperial County Lithium Valley Specific Plan
Solicitation # 2023120104
The Imperial County Lithium Valley Specific Plan (LVSP) is a comprehensive land use and zoning initiative authorized by Senate Bill 125 to develop lithium resources and renewable energy infrastructure within the Salton Sea Known Geothermal Resource Area. Spanning approximately 51,620 acres, the project aims to establish an environmentally conscious employment hub by streamlining the permitting process for geothermal energy production and lithium extraction, processing, and manufacturing. The plan introduces various land use designations, including Green Industrial, Manufacturing, Logistics, and Conservation, while incorporating an Agricultural Overlay to balance industrial growth with the preservation of prime farmland. This initiative is designed to support the national production of sustainable energy technologies, enhance local economic stability through excise and property taxes, and fund Salton Sea restoration and community benefits. The project is governed by a Program Environmental Impact Report (PEIR) and a Water Supply Assessment to ensure compliance with the California Environmental Quality Act and Senate Bill 610. Key operational requirements include a 40 percent local hiring goal for construction workers, the payment of prevailing wages, and strict adherence to Cal/OSHA and OSHA safety standards for hazardous materials and excavation. Environmental protections are prioritized through the use of qualified biologists for wildlife surveys, rigorous dust control measures, and the protection of sensitive cultural resources. The project involves extensive coordination with state agencies, including Caltrans for transportation impacts, the California Energy Commission for geothermal permitting, and the Department of Toxic Substances Control for hazardous waste management.
Environmental Consulting Services

POSTED

3 days ago

DEADLINE

N/A
View Details
NAICS: 812930
SLED
Linn Parking & Storage Project (CUP #25-0015, MERG #00165, IS #25-0033)
Solicitation # CUP #25-0015, MERG #00165, IS #25-0033
The Linn Parking and Storage project, identified by Conditional Use Permit #25-0015, Lot Merger #00165, and Initial Study #25-0033, involves the expansion of a parking and storage facility located at 1624 Gateway Road in Calexico, California. The project will merge three contiguous parcels to create a 7.1-acre site designed to accommodate up to 140 trucks and trailers and 60 passenger vehicles. The facility will operate 24/7 with approximately eight employees and will include mini-storage units for receiving customer packages from delivery companies. The expansion aims to improve traffic circulation and site safety, with projected daily traffic of 60 trucks and 30 passenger vehicles accessing the site via Gateway Road. The project was approved on September 9, 2026, following an environmental review that resulted in a Negative Declaration under the California Environmental Quality Act. Construction is scheduled to begin on June 2, 2026, with a phased timeline including demolition, site preparation, grading, building construction, paving, and architectural coating, concluding in late November 2026. Key requirements include compliance with Imperial County Fire Department standards, the installation of fire-rated access roads and water systems, and the submission of hazardous material management plans. The applicant is responsible for all costs related to land acquisition, infrastructure relocations, and the payment of water, sewer, benefit impact, and traffic mitigation fees prior to the issuance of building or grading permits.
Parking Lots and Garages

POSTED

2 months ago

DEADLINE

N/A
View Details
NAICS: 237130
SLED
The Towers LLC (CUP26-0006/IS26-0007)
Solicitation # CUP26-0006
The Towers, LLC is proposing the construction of a Wireless Communication Facility in Niland, California, located at 307 E. Winslow Rd. The project consists of a 120-foot-tall, non-reflective, galvanized sky-blue monopole tower and related equipment situated within a 50-foot by 50-foot leased and fenced area. The primary objective of the facility is to enhance Verizon's 5G and 4G LTE coverage in the Calipatria area, specifically along Highway 111. The installation includes a 6-foot chain-link fence for equipment screening, internal cabling, FAA-compliant aircraft warning lighting, and an adjacent IID transformer, while water and sewer services are not required. The project is managed under Conditional Use Permit CUP26-0006 and Initial Study IS26-0007 by the Imperial County Planning and Development Services Department. An environmental review conducted under CEQA guidelines resulted in a Negative Declaration, concluding that the project will not have significant environmental effects. The Imperial County Planning Commission approved the project on September 9, 2026, with a Notice of Determination filed on September 17, 2026. Key regulatory requirements include compliance with FCC RF exposure standards, National Electrical Code standards, and the ability to support the co-location of two additional carriers. The applicant has requested a 10-year permit term and is subject to site restoration requirements and potential public benefit agreements with the Imperial Valley Emergency Communication Authority.
Power and Communication Line and Related Structures Construction

POSTED

2 months ago

DEADLINE

N/A
View Details
NAICS: 624229
SLED
NHHA (National Healthcare & Housing Advisors) CUP#26-0001, IS#26-0001
Solicitation # CUP26-0001
The applicant, National Healthcare & Housing Advisors, LLC, has requested a Conditional Use Permit to operate an Interim Recuperative Care and Transitional Housing facility within the Imperial Center Specific Plan Area, asserting that the proposed use is functionally analogous to an extended-stay hotel with integrated social services—a use already recognized under the plan. The facility will span approximately 27,000 square feet across two buildings, divided into three 9,000-square-foot suites, and will serve 80 to 100 clients while employing up to 50 local staff members. Operations will run continuously, 24 hours a day, seven days a week. Services include day habilitation, post-hospitalization recuperative care, behavioral health support, community health worker programs, a sobering center, enhanced care management, and street medicine, all aligned with NHHA’s CalAIM program aimed at achieving permanent housing stability for participants. Clients may receive services for an initial 90-day recuperative period, with the possibility of extending housing support for an additional six months. The project falls under the same regulatory review framework applied to hotels and transitional housing in the area, and its approval hinges on securing the conditional use permit, designated as CUP#26-0001.
Other Community Housing Services

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 221116
SLED
CUP23-0020/IS23-0026-Dogwood Geothermal Energy Project
Solicitation # GEO Heber Field Co. 2 Wells 06052026
The Dogwood Geothermal Energy Project is located on approximately 125 acres about one mile south of Heber in Imperial County, California. The project encompasses the construction and operation of a geothermal plant, associated facilities, a geothermal fluid pipeline, and solar energy facilities, including a 15 MW solar facility and a 7 MW parasitic solar facility. The scope of work specifically involves the installation of geothermal production and injection wells, which includes preparing well pads, drilling and completing the wells, and connecting them to the pipeline network. Under solicitation GEO Heber Field Co. 2 Wells 06052026, CalGEM has approved permits for Heber Field Company to install two specific geothermal wells, identified by API numbers 02591586 and 02591587. The project is governed by the California Environmental Quality Act and is based on an Environmental Impact Report prepared and certified by the Imperial County Planning and Development Services in August 2025. Final approval for the project was granted by the Imperial County Board of Supervisors on August 5, 2025, with subsequent permit approvals from the California Geologic Energy Management Division issued on June 5, 2026. The project site is located at 855, 853, and 602 Dogwood Road, Heber, CA, and must adhere to all adopted mitigation measures and monitoring plans specified in the environmental documentation.
Geothermal Electric Power Generation

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 237210
SLED
Parcel Map (PM) #02518/IS25-0022
Solicitation # PM#02518/IS#25-0022
Parcel Map #02518 and Initial Study #25-0022 involve the subdivision of an 8.83-acre agricultural property located at 604 W. Murphy Road in Imperial, California. The project, proposed by Josh Quintero and overseen by the Imperial County Planning and Development Services Department, aims to divide the land into four legal parcels to separate an existing shop and facilitate residential development. Parcel 1 will be approximately 4.85 acres, while Parcels 2, 3, and 4 will each be approximately 1.33 acres. Access to Parcel 1 and 4 will be via Murphy Road, and Parcels 2 and 3 will be accessed via Nance Road. The project has been processed under the California Environmental Quality Act, resulting in a Negative Declaration and a Notice of Determination stating that the subdivision will not have a significant environmental effect. Technical requirements include a parcel map prepared by a licensed California Land Surveyor or Civil Engineer using the North America Datum of 1983. Infrastructure mandates include the installation of an approved water supply for fire flow per California Fire Code, the construction of three driveways on Nance Road, and the installation of non-contiguous sidewalks. Additionally, the project requires a grading and drainage plan to prevent cross-parcel drainage and may necessitate financial security, such as a road improvement bond or letter of credit, for off-site improvements. Final recordation of the map is contingent upon providing a tax certificate and a subdivision guarantee.
Land Subdivision

POSTED

10 months ago

DEADLINE

N/A
View Details
NAICS: 221114
SLED
Heber 1 Parasitic Solar Energy ProjectThe Heber 1 Parasitic Solar Energy Project involves the development of a 20 megawatt solar energy facility and an interconnecting medium voltage cable line in unincorporated Imperial County, California. The facility is designed as a behind-the-meter system to provide parasitic load power to offset the auxiliary load of the existing Heber 1 Geothermal Plant, meaning it will not connect to or generate power for the transmission grid. The project will be located on approximately 121.44 acres of land, including a 106.19-acre solar field and a cable route of approximately 15.25 acres. Construction is anticipated to take 16 to 19 months starting in late 2025, spanning site preparation, project construction, and switch development and interconnection. The project is subject to a Conditional Use Permit and comprehensive environmental review under the California Environmental Quality Act. Key requirements include compliance with fugitive dust regulations, the implementation of a Water Quality Management Plan, and the execution of a Stormwater Pollution Prevention Plan. Extensive biological and cultural assessments have been conducted, including surveys for western burrowing owls, bat acoustics, and avian populations, as well as tribal cultural resource consultations. The project requires the use of approved botanical field surveyors and the implementation of a mandatory education program for all construction personnel. Additionally, the project applicant must participate in the Imperial County Public Benefit Program and enter into a public benefit agreement to cover associated costs and fees.
Solar Electric Power Generation

POSTED

10 months ago

DEADLINE

N/A
View Details

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS