(CUST) BALBOA - 1 INSTALL HHW SIDE STREAM FILTRATION
Active
FederalContract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Agency
Department Of The Navy → Navfac SouthwestView Agency
NAICS
N/A
Place of Performance
USASet-Aside
NONE
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Organization & Contact Information
Show more
AgencyDepartment Of The Navy → Navfac Southwest
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available
Full Description
Show more
Work Type: CONTRACT Location: BALBOA-1 Scope of work: Install HHW Side Stream Filtration 1. Project Overview: The purpose of the Project is to install a filtration system for the Heating Hot Water system that provides service to Buildings 1, 2, 3, 4, 5, 6, and 7. The filtration system will remove sediment and debris from the Heating Hot Water system that is resulting in clogged devices, which renders the Heating, Ventilation, and Air Conditioning system inoperable. 2. Scope of Work: • 2.1 Demolition & Removal (if applicable): o Demolition of piping and valves to facilitate the installation of a filtration system. • 2.2 Site Preparation: o Prepare location in Building 7 for the installation of a filtration system. • 2.3 Construction/Repair: Electrical: Install wiring and conduit for power to filtration pumps. Install circuit breakers as necessary. HVAC: Install control and monitoring wiring and conduit for filtration pumps. Provide testing, balancing, and commissioning for filtration system. Plumbing: Install new filtration system for the Heating Hot Water system. Filtration system shall include pumps, controls, valves, filter assemblies, and piping. Ensure compliance with plumbing Codes and Standards. • 2.4 Impacts to the Base o Plumbing outages and electrical outages shall be required. Appropriate mitigation is required. o Temporary traffic and pedestrian access impacts shall be required. Appropriate mitigation is required. L/A test: AC waiver: N/A Funding Type: CUST Priority 3
More opportunities from Department Of The Navy → Navfac Southwest
Same awarding agency
