Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on July 21, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Eareckson Air Station Container Tower

Closed
FA521526Q0112Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
Kittrell Job Corps Center-12 Strand Fiber Optic Replacement- Bldg 2, Bldg 3, Bldg 4
Solicitation # kittrell-job-corps-center-12-strand-fiber-optic-replacement-bldg-2-bldg-3-bldg-4
Covenant Learning Solutions, operator of the Kittrell Job Corps Center in North Carolina, is soliciting sealed bids for the replacement of 12-strand aerial fiber optic cables and associated connectors between Buildings 2, 3, and 4. The contractor is responsible for providing all labor, materials, equipment, and supervision to install outdoor-rated fiber optic cable along existing aerial pathways and terminate them into existing network switches. A critical requirement of this project is that the existing network service must remain fully operational without interruption until the owner authorizes the final switch-over. The contractor must also provide a construction timeline for approval during a pre-construction meeting and adhere to standard work hours of 8:00 AM to 3:00 PM, Monday through Friday. The project requires strict adherence to industry standards, local codes, and manufacturer specifications regarding cable support and bend radius. Acceptance is contingent upon successful Optical Loss Testing, OTDR testing, continuity testing, and polarity verification, as well as the submission of a complete closeout package with as-built documentation. Bidders must hold a valid North Carolina General Contractor license and maintain all necessary Builder's Risk and Liability insurance. Proposals must be submitted via email to Rachelle Judkins by September 30, 2026, and must include a completed Mandatory Bid Document. Payment will be issued as a single lump sum upon project completion, provided all required purchasing documentation is submitted.
Covenant Learning Solutions operator of Kittrell Job Corps Center

POSTED

about 3 hours ago

DEADLINE

in 18 days
NAICS: 237130
New
Federal
CJAG Underground Utilities Construction
Solicitation # W9136426QA076
Solicitation W91364-26-Q-A076 is a 100% small business set-aside for the construction of underground utilities at the Load Line 6 area of Camp James A. Garfield Joint Training Center in Ravenna, Ohio. The project, valued between $500,000 and $1,000,000, involves the installation of approximately 9,900 linear feet of open-cut trenching, 60 linear feet of dual-wall fuel lines with four termination points, and 500 linear feet of grounding rods. The scope also includes electrical and communications conduit routes, concrete-encased roadway crossings, pull boxes, backfill, compaction, and stone-road restoration. All work must be completed within a 60-day period of performance following the notice to proceed. The government will award a firm-fixed-price purchase order based on a best-value determination, evaluating quotations for technical acceptability, relevant past performance in medium-voltage electrical or distribution infrastructure, and price reasonableness. Offerors must provide a bid guarantee with their submission and are required to furnish performance and payment bonds within 10 days of receiving the order. Key deliverables include a Quality Control Plan due within 10 days of award, material submittals, and final as-built documentation. Quotations are due by September 24, 2026, at 10:00 AM EDT, and must be submitted electronically to the designated point of contact.
W7NU Uspfo Activity Oh Arng

POSTED

about 19 hours ago

DEADLINE

in 12 days
NAICS: 237130
New
SLED
FTTP-PHASE 4 -IFB 16
Solicitation # IFB 16
Shrewsbury Electric and Cable Operations (SELCO) is soliciting bids for the Fiber to the Premises (FTTP) Network Upgrade Phase 4 in Shrewsbury, Massachusetts. The project involves the installation of approximately 15 miles of single-mode aerial and underground fiber optic cable, including signal transmission and distribution laterals from the existing backbone ring to splitter cabinets and public right-of-way access points. The scope of work encompasses cable installation, splicing, and bi-directional testing, with specific technical requirements for fiber characterization and the use of FieldSmart Fiber Scalability Center equipment. The contract will be awarded to the lowest responsible and eligible bidder, with bids due by September 29, 2026. The project is governed by Massachusetts General Laws, requiring compliance with prevailing wage rates, anti-discrimination statutes, and debarment certifications. Bidders must provide a 5% bid deposit and the selected contractor must furnish a payment bond for 100% of the contract price. Performance is tied to a strict baseline schedule, with full completion, including final deliverables and punch list items, required within 30 weeks of mobilization. SELCO will retain 25% of the total contract value until a final audit and verification of all as-built documentation and testing results are completed. All work must adhere to OSHA safety regulations and local Shrewsbury noise and hour ordinances.
SELCO1 - SELCO

POSTED

1 day ago

DEADLINE

in 17 days
NAICS: 237130
New
International
New Underground Electric Service System
Solicitation # NCC-CS-041053-NRFP
The National Capital Commission has issued a Negotiated Request for Proposals, solicitation number NCC-CS-041053-NRFP, for the installation of a new underground electric service system at Jacques-Cartier Park North in Gatineau, Quebec. The primary objective is to establish a permanent, higher-capacity power supply to support major events, such as Winterlude, and reduce reliance on diesel generators. The scope of work is divided into two phases: Phase 1 focuses on core infrastructure and civil works near Laurier Street, including the installation of a new Hydro-Quebec infrastructure, a 600 V electrical entrance, and low-voltage distribution for the park and Maison du Vélo. Phase 2 is an optional scope extending the distribution to secondary kiosks and additional pull manholes. The project requires the removal of existing electrical infrastructure and the installation of a main 600 V switchboard and 208 V kiosks. Contractors must adhere to strict environmental and safety standards, including the implementation of tree protection, erosion and sediment control, and excess soil management plans. All work must be completed and the contractor demobilized by Winter 2027/2028, as the site will be required for other uses starting in spring 2028. Award selection is based on a multi-stage evaluation of mandatory requirements, technical capabilities, and pricing, with the top-ranked proponent entering direct contract negotiations. Required security includes performance and labour and material payment bonds, each equal to 50 percent of the project value.
National Capital Commission

POSTED

1 day ago

DEADLINE

in 17 days

AI Contract Overview

Show more

The contract solicitation FA521526Q0112 seeks the construction and installation of infrastructure for the Container & Tower Array at Eareckson Air Station in Alaska, conducted in accordance with the updated Performance Work Statement (PWS), specifically revised in sections 3.3.1, 3.6.2, and 5.1. All responses must be submitted by July 25, 2026, with inquiries due by July 22, 2026, and all communications must include Mr. Jerald Belford at jerald.belford.2@us.af.mil. The solicitation is a total small business set-aside under FAR 19.5, with the NAICS code 237130 for heavy and civil engineering construction. The contracting office is located at JBPHH, HI, but the sole place of performance is Eareckson Air Station, Alaska. Labor rates are detailed for various skilled trade roles including linemen, elevator mechanics, cable splicers, tree trimmers, and general laborers, each with corresponding hourly wages and fringe benefit rates, though no total contract value, quantities, or estimated hours are provided. No explicit contract clauses, evaluation factors, packaging or marking requirements, inspection criteria, or special provisions such as security clearances or options are included in the available documentation. The contract type is designated as combined, but no specific pricing structure like FFP or CPFF is confirmed. Submission instructions direct offerors to respond via the SAM.gov portal, with no alternative media formats or proposal formatting requirements specified. The government retains responsibility for inspection and acceptance at the performance location in accordance with the PWS, while no payment office, accounting data, invoicing method, or COR/COTR identification beyond Mr. Belford are provided.

General Info

Small business contract to build container and tower array at Eareckson Air Station, Alaska, due July 25, 2026.

Agency

Department Of Defense → FA5215 766 Ess PkpView Agency

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

EARECKSON AS, AK, USA

Set-Aside

SBA

Documents

(7)

B110+Site+Survey.pptx

PPTX

RFQ FA5215-26-Q-0112 ARNORTH Container and Tower Install

PDFrfq

PWS ARNORTH Container and Tower Installation Rev5 17JUN

PDFpws

Wage Determination AK20260001 for Alaska Construction

TXTwage-determination

PWS and Attachments - Pre-Installation and Foundation Notes

PDFsow

Clauses for EAS ARNORTH Container and Tower Contract

PDFclauses

PWS ARNORTH Container and Tower Installation Eareckson Air Station 21Jul26

PDFpws

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Combined Synopsis

Amendment 1

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA5215 766 Ess Pkp
Contacts2 people available
OfficeJBPHH, HI, 96860-4928, USA
Organization / Agency
Department Of Defense → FA5215 766 Ess Pkp
View Agency Profile
Office AddressJBPHH, HI, 96860-4928, USA
Contacts
Jerald Belford
Erick Shriver

Full Description

Show more

The requirement is for the construction & installation of infrastructure associated with the Container & Tower Array Installation on Eareckson Air Station, IAW the PWS.


All questions are due by 22 Jul 26 at 1600 (COB)


Please include Mr. Jerald Belford - jerald.belford.2@us.af.mil on all communication.


PWS UPDATED: Sections 3.3.1, 3.6.2, and 5.1.

More opportunities from Department Of Defense → FA5215 766 Ess Pkp

Same awarding agency

NAICS: 238210
New
Federal
Wake Island Fiber Installation from Marina to VORTAC
Solicitation # FA521526Q0041
Solicitation FA521526Q0041 is a firm-fixed-price requirement for the Department of Defense to engineer, furnish, install, and test 12 new strands of single mode blown fiber optic cable on Wake Island. The project involves installing the cable from the Marina (Bldg. 1705) to the VORTAC (Bldg. 1730), including the installation of new fiber optic distribution panels. This acquisition is a 100 percent small business set-aside specifically for HUBZone Small Business (Women-Owned Small Business) under NAICS code 238210. The period of performance is scheduled from September 30, 2026, to September 29, 2027, with shipping terms set as FOB Destination Wake Island Airfield. The contract will be awarded based on the lowest price technically acceptable (LPTA) method. To be eligible, offerors must be active in the System for Award Management (SAM) with a valid CAGE code and demonstrate at least three years of experience in telecommunications systems and fiber installations. Technical acceptability and past performance will be evaluated on an acceptable or unacceptable basis, requiring at least two relevant references from the previous two years. All payment requests must be processed electronically via Wide Area Workflow (WAWF). Quotes were due by September 17, 2026, and must remain valid for 30 days following submission.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

about 19 hours ago

DEADLINE

in 6 days
View Details
NAICS: 336411
New
Federal
PACAF - Small Unmanned Aircraft System
Solicitation # FA521526N0002
The Headquarters Pacific Air Forces Command Surgeon General’s Office is seeking a small unmanned aircraft system (sUAS) to address medical capability gaps in the Indo-Pacific Area of Responsibility. The system will be utilized for proof of concept and exercise testing to deliver mission-essential Class VIIIA and B supplies to austere locations. Technical requirements specify an autonomous and programmable system with vertical takeoff and landing (VTOL) capabilities, a payload capacity of up to 65 kg, and a range of 30 km on a single charge. The procurement must comply with regulatory requirements set forth in the FY 2020 NDAA Section 848 and the FY 2024 NDAA Sections 1821-1825, which prohibit the use of systems manufactured or assembled by covered foreign entities. The contract requires the delivery of the sUAS within 180 days of the contract date, accompanied by detailed user manuals, maintenance guides, and inventory lists. The package must include a standard spare parts kit, necessary control software, any required non-standard hardware, and additional batteries for two complete swap outs. Training is a key deliverable, with options for training two personnel at the vendor facility or a vendor team providing training for four to six personnel at Hickam AFB, Hawaii. Maintenance responsibilities include battery charging, part replacement from the provided kit, and other routine tasks as defined during training. This effort is designated as a small business set-aside.
Aircraft Manufacturing

POSTED

about 19 hours ago

DEADLINE

in 4 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS